Mussafah Water Transmission Scheme (MWTS), Mussafah to Abu Dhabi, Lot M, EPC Contract No. N4268.2
Occupation or position held: (site Manager)
SCOPE OF WORK:
The scope of work is including, but not limited to the following three packages:
1.1 Package M1A: Modification in Lot F Pump Station to interface, Feed and Control the Lot M Pipeline Packages M2 and M3 - Engineering, Design, Supply of Materials and Equipment, Construction, Installation, Testing, Pre-commissioning, Commissioning, including trial . Initial operation & NDM,
1.2 Package M2: DN 1600 Pipeline from Lot F Pumping Station at Musaffah up to Musaffah interchange - Engineering, Design, Supply of Materials, Construction, Installation, Testing, Pre-commissioning, Commissioning including trial & initial operation .( NDM & HDD) Cross a Mussafah bridge with HDD
1.3 Package M3: DN 1600 Pipeline from Musaffah interchange up to Abu Dhabi Engineering, Design, Supply of Materials, Construction, Installation, Testing, Precommissioning, Commissioning including trial & initial operation.
Yuksel Dubai Cons.CO. L.L.C, Dubai/ U.A.E 2007---2009
Project R747 / 2B Dubai International Airport Roads - Phase II - Beirut Highway/Expansion of the Al Nahda Intersection
Occupation or position held: (Section Manager)
SCOPE OF WORK:
Implemented in connection to Phase II of the Dubai International Airport improvement, this project includes the construction of a 630 m tunnel (on the Al Nahda highway) and a 2x3 lane 353 m. bridge (on the Beirut highway), as well as improvement and construction of two at-grade interchanges. Road signs, landscaping, street lighting, irrigation system, drainage systems…
Road, Underpass, bridge & Earthworks (formation. sub-bas. wet mix & asphalt).
Pressurized irrigation pipe line and services (GRP, A/C, .HDPE & STEEL PIPE).
A/C water line works different diameter.
u-PVC road crossing ducts.`
Surface water, drainage & Sewerage (Manhole-A/C-GRP& u-PVC main lines &gullies).
ETISALAT, Electrical & Street lighting.
Intelligent transportation systems.
Project: R 174 P
Occupation or position held: (Section Manager)
SCOPE OF WORK:
Scope of the project comprises the construction of total length is around 73 Km. 9 main irrigation lines with diameter between 300 and 1200mm in various parts of Dubai City. Works include also the construction of chambers and installation of pressure reducing valves, electromagnetic flow meters, installation and commissioning of a SCADA system to control and monitoring the network and additionally installation and commissioning of two pumps at AL AVIR STP
• 73 km of GRP pipeline (Ø500 to Ø1200).
• 175 nos. of valve and control chambers.
• Booster Pump Station (2000m3/d, 100m of head).
• SCADA systems.
• 3000m of pipelines with NDM (Close shield TBM).
AlMarwan & Al Sharjah GCC .CO.LLC Sharjah /U .A .E 2005 - 2007
Project no.1: R-471A King Abdul Aziz Road Package 1 (Maliha Road)
Occupation or position held: (Project Engineer)
SCOPE OF WORK:
King Abdul Aziz Road is a dual 3 lane free flow Spine road, which runs through the city Centre starting from the Layyah Areato Kalba Road.
The contract work comprised the construction of a full clover leaf interchange on Sharjah Ring Road, a Dumb-bell Interchange on KAA Road, a Trumpet Interchange on Sharjah-Kalba Road and a 4 km long dual 3 lane carriageway for inter-connecting the interchanges with new service and relocation works for its existing services and drainage works.
Road, bridge & Earthworks (formation. sub-bas. wet mix & asphalt).
Pressurized irrigation pipe line and services (GRP and HDPE Ø250 to Ø800).
Pressurized sewerage & drainage networks (Manhole-A/C-GRP& u-PVC main lines &gullies Ø500 to Ø1200).
A/C water line works different diameter (Ø300 to Ø600).
ETISALAT, Electrical & Street lighting.
Intelligent transportation systems.
Superlit Gcc .Co .L.L.C, Aleppo /syr 2002 - 2005
AL-BAB and TADIF irrigation project 6700 h, Client General Organization for Land Development (GOLD) - upper Department SYRIA.
Occupation or position held: (Assistant of Project manager& Project engineer)
SCOPE OF WORK:
Road works (OTO YOL) along pressurized pipe lines (246 km).
Motor road & pedestrian bridges. : ( 2 structures).
Water tanks (3 structures).
Headrace irrigation trapezoidal canal and drainage system (35 km).
Pressurized irrigation pipe line (GRP and HDPE Ø250 to Ø2000) (246 km).
Steel fittings for GRP &HDPE Pipes.
Pump station (3 structures).
Office works : Planning, quantities calculation & monthly payment certificates.
ARISAN YAPISANAYI LTD.ŞTİ, Istanbul / TURKEY 1998 - 2002
Occupation or position held: (site engineer)
SCOPE OF WORK:
Supervisor and Executor.
Planning Supervising and executing the following projects site engineering.
Executing and paving road works including services with length: 35 km.
Extending drainage networks of about 30 km for Istanbul.
Constructing steel shapes.
Designing, manufacturing and installing prefabricated steel structures
University of Osmangazi & I.T.U / faculty of engineering department of civil engineering September 1996 - February 2001 Bachelor degree in civil engineering * I'm certified from ABU DHABI Municipality & Takreer * I'm certified from DUBAI Municipality * I'm certified from ISTANBUL Municipality