Muhammad Aamir qureshi, Electrical MEP Project Engineer

Muhammad Aamir qureshi

Electrical MEP Project Engineer

Assus Electromechanical Cont

Lieu
Pakistan
Éducation
Baccalauréat, power plant
Expérience
4 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :4 years, 5 Mois

Electrical MEP Project Engineer à Assus Electromechanical Cont
  • Émirats Arabes Unis - Sharjah
  • août 2015 à avril 2016

• Direct preparation of bid and Electrical and plumber drawings including demand load calculation, panel schedules, lighting and power plans, lighting control diagram, etc.
• Specification preparation for drawing, sheets and booklet using Master Spec and proprietary modifications.
• Project design and development tasks, including drawings, calculations, cost estimates, and specifications of Different projects.
• Design of electrical systems such as power distribution, lighting and fire alarm
• Project coordination with other engineering and architecture departments.
• Client relationships and responding to questions and comments
• Construction administration including attending project meetings, reviewing contractor submittals.

Manager Electrical à Shazil Pakistan private Limited
  • Pakistan - Karachi
  • octobre 2012 à août 2015

• Installation, Testing and Maintenance of Diesel Generators in power House.
 Generators Preventive and Routine Maintenance.
 Major overhauling
 Generator Panel Protection
 C &PF (Capacitance and Protection Factor) Test
 Generator synchronization Controlling
 Controlling of A.T.S and A.M.S Panel

• To carry out Power Panel Design, commissioning / testing and calculation of different Induction Motors Capacity.
 Troubleshooting and Maintenance on different Electrical and Electronic elements in Distribution Panel such as Contactor, Relays, CB, Fuse, Timer, Eocr, CTs, PTs etc
 Panel Drawing and Protection.
 Modification, Operation and Verification of different types of panel Troubleshooting of Induction motor, winding Resistance, Load &No load Ampere, its performance and Bearing checking
 To implement maintenance schedule and supervise breakdown and emergency job.
 Troubleshooting and programming in Different types of invertors (Puma, Telemechanic)
 Design of Electrical Drawing of building and civil construction work
 Inspection of receiving item and make monthly and yearly budget report for audit.

MAJOR PROJECTS
Installation of 11KV Feeder
Heading and supervising the ericsion /installation and commissioning of 11KV feeder with complete settings Calculation, parameterization and complete testing at Shazil Pakistan Pvt Ltd from 132kvGrid station with the collaboration of K-Electric Pakistan.
Automatic Power Factor Controller
To estimate and inspect the load with calculation according to the utilization of power at main power plant and design the Automatic power factor as per need of the power plant under the supervision of K-Electric Team.
Installation of 500 KVA Transformers
After complete testing of 500 KVA transformers that include TTR (Transformer Turns Ratio test), Insulation resistance test, Winding resistance test, Differential stability test and installed the transformer with the cooperation of Siemens contactor.

Electrical & Instrumentation Engineer à Gatron Industries ltd
  • Pakistan - Karachi
  • décembre 2011 à septembre 2012

• Prepare of electrical and Instruments drawing.
• Calibration of different Instruments, PI, TI, Controller, Schenck, bagging station and control room equipment.
• Creation and implementation of SOPs as per requirement of different job of work
• Discuss with Manager about balance jobs to non-availability of material /power
• To Work on Power Transmission and Distribution of different areas in Plant.(Polycon and SSP)
• Check of UPS batteries performance and graph.
• Inspection of receiving item and make monthly and yearly budget report for audit.
• Helping with senior on shutdown/project, pending job and problem.
• To prepare Work Permit for Electrical and Instruments job in plant and direct supervision of assign job to the Technician, discuss on technical problem and trained them and ensure housing of area after completion of job.

Éducation

Baccalauréat, power plant
  • à Mehran University of Engineering And technology pakistan
  • décembre 2010

2007- 2010 • Mehran UET, Jamshoro, Sindh, Pakistan. B.E-Electrical Result: 78% Final Year Thesis: Carbon Emission of different power plants with global aspect. • How to reduce carbon emission in power plant. • How to control hazard gas • How to make friendly atmosphere.

Etudes secondaires ou équivalent, Pre-Engineering
  • à Memon acaedmy
  • janvier 2006

2006 HSC B.I.S.E MIRPURKHAS Result: 69% B GRADE/ 2nd DIVISION

Etudes secondaires ou équivalent, Science
  • à Govt boys high school
  • janvier 2004

2004 SSC B.I.S.E HYDERABAD Result: 78% A GRADE/ 1ST DIVISION INTERNEE: Pakistan Aeronautical Complex Kamra. (Islamabad)

Specialties & Skills

AutoCAD
Cable Management
Generators
Motor Control
CALIBRATION
CONTROL ROOM
ENGINEER
INDUCTION
INSPECTION
INSTRUMENTATION
TRAINING

Langues

Urdu
Débutant
Anglais
Moyen