Total Years of Experience: 12 Years, 9 Months
December 2011
To Present
Operation Engineer
at Karachi Nuclear Power Plant
Location :
Pakistan - Karachi
Chemical Engineer with Master inNuclear Power Engineering having experience in nuclear power plant operation. Summary of my expertise mentioned below
• Nuclear Power Plants developed the model of high level of safety (employee, equipment and surrounding population ).
• Extensive knowledge of safety and health standards, industrial operations, and control methods.
• Raise Work permit as a necessary prerequisite before the commencement of jobs.
• Perform process & personal safety procedure audits, identify discrepancies, and derive connections as needed.
• Develop, implement & monitor risk assessment systems, covering the workplace, work equipment, hazardous Substances and noise etc.
• Ensure proper implementation of HEPT(human error prevention tools) system for safe practices.
• Preparation of Re-Commissioning procedure and job safety analysis for the project.
• Inspection of work site through different checklist.
• Inspection of Equipment’s behavior by various parameters
• Conduct Emergency Evacuation Exercises & Fire Fighting Drills.
• Employee training and comprehension in safe operation of plants.
• Outstanding time management skills for completing projects.
• Ensure adequate availability of Process water through (RO, WTP and MED Plants)
• Shift in charge experience of MED and RO plant.
• Disposing the waste to Sea, air and land under the LAW of PNRA(Pakistan nuclear regulatory authority).
• Conducted HAZOP study of different units of plant.
• Implemented modification in existing facility to enhance the reliability of the equipment.
• Run various computer codes related to thermal hydraulics of Nuclear power plant.
• Think always Conservatism approach regarding safe operation of nuclear power plant.
• Nuclear Power Plants developed the model of high level of safety (employee, equipment and surrounding population ).
• Extensive knowledge of safety and health standards, industrial operations, and control methods.
• Raise Work permit as a necessary prerequisite before the commencement of jobs.
• Perform process & personal safety procedure audits, identify discrepancies, and derive connections as needed.
• Develop, implement & monitor risk assessment systems, covering the workplace, work equipment, hazardous Substances and noise etc.
• Ensure proper implementation of HEPT(human error prevention tools) system for safe practices.
• Preparation of Re-Commissioning procedure and job safety analysis for the project.
• Inspection of work site through different checklist.
• Inspection of Equipment’s behavior by various parameters
• Conduct Emergency Evacuation Exercises & Fire Fighting Drills.
• Employee training and comprehension in safe operation of plants.
• Outstanding time management skills for completing projects.
• Ensure adequate availability of Process water through (RO, WTP and MED Plants)
• Shift in charge experience of MED and RO plant.
• Disposing the waste to Sea, air and land under the LAW of PNRA(Pakistan nuclear regulatory authority).
• Conducted HAZOP study of different units of plant.
• Implemented modification in existing facility to enhance the reliability of the equipment.
• Run various computer codes related to thermal hydraulics of Nuclear power plant.
• Think always Conservatism approach regarding safe operation of nuclear power plant.
Share on Facebook
Share on Twitter
Share Via Email