PROJECT ENGINEER
DEMAR ENGINEERS PVT. LTD.
Total years of experience :3 years, 0 Months
I worked as Project Engineer in DEMAR Engineers Lahore. During my stay I learnt and got orientation in project execution, construction and maintenance of mechanical equipment, installation of Generators, Pre-Fabricated Steel Roofing systems, Elevators, HVAC systems, Storage Tanks, pipelines and ancillary equipment.
Steam pipe line diameter 10”
Arranged and Mobilized a whole Fabrication and installation team for Fabrication and erection of 950 meter steam pipeline Diameter 10” with all supporting structure, racks columns overhead bridges and expansion loops , expansion joints and other ancillary equipments at century paper and board mill Bhai Pheru.
Coal De-Duster Cyclone
Managed the execution of fabrication of two coal De-Duster cyclones for SUTEX Ltd. At NDF Unit 42 power plant R o h i N a l a L a h o r e .
HVAC system
Managed the fabrication and Installation Work of 04 No’s RU22 DAIKOOL Air Handling units with the fabrication and installation of associated GI Ducting work at Super Cinema Vogue Tower MM Alam Road, Gulberg 3 Lahore.
Erection of Pre-Engineered Steel Roofing
Managed all the activities of Erection of Pre-Engineered Steel Roof from shifting of structural members at Top level to the erection of Roof Panels and water Drain System at Super Cinema Vogue Tower MM Alam Road Lahore.
Installation Work of Traction Elevator
Managed and supervised the Un-Loading, Leveling and installation work of Traction Elevator having Lift of 190ft with the fabrication of all ancillary equipment at Vogue tower MM Alam Road Lahore.
Installation of Diesel Generator
Prepared BOQ’s, P&ID’s, Fabrication Drawings and Cost estimates and supervised the fabrication and Installation Work of 810 KVA Diesel Generator at BATA Maraka.
Fabrication of Sound attenuated Canopies
Prepared Cost estimates and supervised the fabrication of sound attenuated canopies and foundations of Generators from 20 KVA to 810 KVA at company’s workshop, 1.5 Km
Lahore Road Raiwind.
Installation Work of Screw Type Chiller
Prepared the P&ID’s and managed the execution of fabrication and Installation Work of
Screw Type Chiller with all associated piping and ancillary equipment at Ayesha
Spinning Mills Sheikhupura .
Installation Work of Absorption Chiller
Managed the execution of fabrication and installation work of Absorption Chiller with all associated piping and ancillary equipments at Interloop Raiwind Road.
Piping for Fire Hydrants
Prepared Route Drawings and supervised the fabrication and laying of 1000ft 8” Diameter pipeline for fire Hydrants and associated ancillary equipments at Nishat Dyeing & Finishing
Mills Power Plant Rohi Nala Lahore.
Storage Tanks
Managed the execution of fabrication and Installation Work of 2 diesel storage MS tanks of 40, 000 liters each with MS sheet of 8 mm thickness with complete supply line (Dia
2”) having pump station from tanks to the Power Generators for Nishat Dairy Ltd. at
Sukheki.