Muhammad Amir, Night Tool Pusher

Muhammad Amir

Night Tool Pusher

Weatherford Drilling International

Location
Pakistan - Karachi
Education
Master's degree, Petroleum Technology
Experience
8 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :8 years, 2 Months

Night Tool Pusher at Weatherford Drilling International
  • Iraq - Basra
  • December 2013 to September 2016

Monitor Safe and sound Drilling Operations.
Pre-Tour Meetings
Pre job safety meeting with crew and third parties.
check availability and condition of drilling tools.
optimized drilling hydraulics
calculate ton-miles and monitor slip and cut program
check manpower availability and request if required
Resolving Hole Problems.
proper hole cleaning.
responsible for well securing and well control events.
preparing daily kill sheets
check and updating trip sheets.
prepare clients Audits and internal Audit
responsible for CAT-III and CAT-IV inspections as per BMS (business management system)
responsible for update records.
Prepare and review SOP's
responsible for material/ Asset transfers or received.
responsible for camp issues and their solutions.
Prepare and follow Rig move plans.
Inspections of equipments.
Responsible of assembling and Dismantling mast/ Rig
training to crews and supervise drills on site.
monitor rotating hours of down hole tools.
BHA Design assessment according to hole condition and assembling BHA.
relieve drillers on brake (Conventional Brake)
Prepare tubular tally (DP, Casing, Tubing)
daily routine check up of well control equipments.
supervise RIH Casing & Cementing Programs
Supervise BOP N/Down & N/Up Operations.
Supervise casing cutting and mounting new CHS/THS
pressure testing BOP and well control equipments

Drilling Engineer at Chuanqing Drilling Engineering Company
  • Pakistan - Islamabad
  • July 2010 to December 2013

Daily, Weekly and Monthly Reporting.
IADC Report
Monitor Safe Drilling Operations.
Pre job safety meeting with crew and third parties.
check availability and condition of drilling tools.
optimized drilling hydraulics
Dull Bit gradings.
supervise conventional Coring and there tech.
calculate ton-miles and monitor slip and cut program.
check and balance of manpower availability.
Resolving Hole Problems.
training to crews and supervise drills on site.
monitor rotating hours of down hole tools.
BHA Design assessment according to hole condition and assembling BHA.
relieve drillers on brake (Joy Stick)
Prepare tubular tally (DP, Casing, Tubing)
daily routine check up of well control equipments.
supervise RIH Casing & Cementing Programs
Supervise BOP N/Down & N/Up Operations.
Supervise casing cutting and mounting new CHS/THS
pressure testing BOP and well control equipments

Drilling Engineer at Techno Petroleum Pvt Ltd.
  • Pakistan - Islamabad
  • August 2008 to June 2010

well designing.
prepare casing program stage wise.
check availability of casing in warehouse.
quotations of suppliers.
optimized drilling hydraulics.
selection of bit and type according to formation
dull bit gradings.
off set well data study.

Education

Master's degree, Petroleum Technology
  • at University Of Karachi
  • July 2008

Complete M.Sc in Petroleum Technology with 3 GPA or (72%) Marks work as a Trainee Engineer with SAS Drilling and contractors then work as a Drilling Engineer with Grate wall Drilling Company (CNPC) on 4 Exploratory Wells for OGDCL and All of them Successfull

Specialties & Skills

Petroleum
Contractors
Drilling
Drilling Engineer
Trainee Engineer
Night Tool Pusher/ Asst. Rig Manager

Languages

English
Expert

Training and Certifications

Competent Assessor (Training)
Training Institute:
OPITO (MBA)
Date Attended:
December 2015
Duration:
9 hours