Total Years of Experience: 12 Years, 7 Months
April 2012
To Present
Process Engineer
at Pakistan Petroleum Limited
Location :
Pakistan - Karachi
Working as Process & Facilities Engineer for Pakistan Largest Oil and Gas entity Pakistan Petroleum Limited. I am Responsible for Planning, managing, and supervising BHP survey of Adhi gas condensate field, Chemical Injection Systems, Well head surface fittings and spares. Process & Safety Technical Engineer role in facility development, de bottleneck & diversification projects along with plant operations optimization, process schemes alteration for production augmentation, plant operations troubleshooting, Risk Assessments, Process Safety studies and implementation of PSM systems at various fields of Pakistan Petroleum Limited. Safety Technical Engineer role for designing safe disposal system, review of facilities firefighting systems, Close drain systems, flare system and Evaporation Ponds. My job responsibilities further extend to the planning department for planned and proposed projects right from Economics (feasibility) to First gas/First Oil. Extensive experience of Crude Oil production and stabilization, LPG & NGL sub-cooled process plants employing Expander and mechanical refrigeration, amine MDEA sweetening, MEA units, Glycol dehydration, Exchanger based dew point units, condensate stabilization units and compression stations projects execution from start till the end. Team Lead of Quality management system and Annual Audits. Process Lead for all risk management studies. I have professional contemporary Process and safety Engineering skills coupled with sound knowledge of international standards and best practices. I am leading Production and operations of Adhi field located near Islamabad Pakistan.
January 2012
To March 2012
Process Engineer
at Sitara Chemical Industries Limited
Location :
Pakistan - Faisalabad
1. Sitara Caustic Plant
• Participated in ATA of Sitara Plant.
• Performance testing of newly commissioned CO2 plant.
• Plant operations
• Class room trainings
2. Worked as HSE personnel after successful completion of training period for more than 5 months.
• Implementation of HSE rules and regulations as per management policy.
• Ensure safe work operation at plant site.
• Ensure of field personnel performing duties wearing PPEs
• Review and made amendments in Isolation procedures for critical equipment PM, PTW for hot cold and confined space entry and their implementations on field during maintenance work.
• Organized HSE Walks and trainings for training employees, educating them with safe work practices.
• Participated in ATA of Sitara Plant.
• Performance testing of newly commissioned CO2 plant.
• Plant operations
• Class room trainings
2. Worked as HSE personnel after successful completion of training period for more than 5 months.
• Implementation of HSE rules and regulations as per management policy.
• Ensure safe work operation at plant site.
• Ensure of field personnel performing duties wearing PPEs
• Review and made amendments in Isolation procedures for critical equipment PM, PTW for hot cold and confined space entry and their implementations on field during maintenance work.
• Organized HSE Walks and trainings for training employees, educating them with safe work practices.
June 2011
To August 2011
HSE Assistant
at Akzonobel Pakistan
Location :
Pakistan - Lahore
1. Implementation of HSE rules and regulations as per management policy.
2. Ensure safe work operation at plant site.
3. Ensure of field personnel performing duties wearing PPEs
4. Review and made amendments in Isolation procedures for critical equipment PM, PTW for hot cold and confined space entry and their implementations on field during maintenance work.
5. Organized HSE Walks and trainings for training of employees, educating them with safe work practices.
6. Executed a detailed project for introducing Bio-degradable ingredients in the packing materials of finished polymer to promote green environment and enhance sustainability.
2. Ensure safe work operation at plant site.
3. Ensure of field personnel performing duties wearing PPEs
4. Review and made amendments in Isolation procedures for critical equipment PM, PTW for hot cold and confined space entry and their implementations on field during maintenance work.
5. Organized HSE Walks and trainings for training of employees, educating them with safe work practices.
6. Executed a detailed project for introducing Bio-degradable ingredients in the packing materials of finished polymer to promote green environment and enhance sustainability.
June 2008
To July 2008
Internal Affairs Commander
at Ibrahim Fibers Limited
Location :
Pakistan - Faisalabad
Share on Facebook
Share on Twitter
Share Via Email