Technical Officer
Pakistan Steel
Total years of experience :18 years, 4 Months
• Installation and commissioning of Coil Centering instrument at Precling Unit at CRM (cold Rolling Mill).
• Installation and commissioning of Boiler turbine PLC GE Phonic.
• Installation and commissioning of Pre-Amplifier Card of Universal Stand HSM (Hot Rolling Mill).
• Installation of frequency RPM Meter at Oxygen Plant.
• Installation of PLC using G.E phonic Versamax unit at Cold Box of turbine at oxygen plant.
• Installation and commissioning of VFD (veriable frequency Drive) VG-50.
Installation and commissioning of DC Drive.(DC Drive Sementec Siemens)
Control Operation Process of Power Gass Generator of Caterpiller 5.5 MW
All maintenance and repair of card
A Grade
Pass in Grade A
A+ Grade