Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Muhammad Asif Iqbal, Senior Plant Operator

Muhammad Asif Iqbal

Senior Plant Operator·Nuclear Power Plant

Pakistan

Bachelor's degree, Electrical Technology

Work experience

Total years of experience: 20 years, 6 months

Senior Plant Operator

December 2006 - Present

Nuclear Power Plant

Karachi, Pakistan

December 2006 - Present

• I am working as "Senior Plant Operator" in Nuclear Power Plant since 2007 till date and my responsibilities are.

Key Responsibility
Responsibilities 137 MWe Steam Turbine in Nuclear Power Plant
Operate and Monitor all Auxiliary and Conventional Systems

• Perform call up cards and routine checks.
• Operate and monitoring all auxiliaries system of T/G during startup and shutdown of
Plant.
• Monitor all parameter; take complete reading set and corrective action accordingly.
• Watching gauges, dials, or other indicators to make sure a machine is working
properly.
• Maintain the operating equipments and facilities in sound and clean condition.
• Maintaining and Computerizing of Shift Log.
• Starting, Synchronizing, Loading, Un-Loading and Stopping Of 1200 KWe Diesel
Generator.
• Condensate water pump.
• Pump house operation and equipment.
• Heat Exchangers and Condenser operation.
• Carry out the isolation of equipments for planned and emergency maintenance and
Normalized of the plant thereafter.

Control room
Perform duty in control room

• Monitor all critical parameter in control room and take complete reading set.
• Acknowledge alarms and take corrective action accordingly.
• Check and review the operating conditions and records.
• Feed all control room logs and technical data and take print out.
• Entering, transcribing, recording, storing, or maintaining information in written and electronic form.

Responsibilities the production of 1600m³/day (MED Desalination Plant)
• Taken into service and out of service of the Plant.
• Perform duty on MED desalination Plant.
• Working on Allan Bradley (SLC5) based DCS system.
• Monitoring all three loops of MED Plant Sea water loop, ICL Loop, and MED Battery
Loop.
• Static and Dynamic Testing of Flow / Pressure Transmitters and Electronics Valve
Positioner and position transmitters.
• Installation and Testing of Flow Rater, Flow Switches, Pressure Switches, Relative
Humidity.
• Installation and maintenance of Electronic Transmitter related to pressure/Level/ Flow/Gauge Pressure.
• Flow Station Routine checks on instrument connection, Pumps. Valves, Meter etc.
• Monitor tripping condition of equipments, process parameters and control within defined limits.
• Ensure conductivity, TDS & pH of the distillate within required range.
• Take necessary corrective action in case of emergency or equipment breakdown to ensure the uninterrupted service.
• Installation and Maintenance of Indicator Digital/Analog of Flow, Pressure, Level,
Temperature, Valve Position etc.
• Troubleshooting of Measurement and Control Loops.
• Commissioning of Measurement and Control Loops.
• Maintain the operating equipments and keep clean condition.

Responsibilities of 100, 000 Gallon Reverse Osmosis Water Treatment Plant

• Perform duty on Reverse Osmosis Water Treatment Plant.
• Supervise daily routines and call up card.
• Taken Plant into service and out of service.
• Monitor all parameters, complete reading set & take corrective action Plant operation.
• Maintain the operating equipment and facilities in sound and clean condition.

Electrical Knowledge
'
• Work on (LV, MV anndand HV) Switch Gears.
• SF6 and Oil circuit breakers.
• Gas generator and Diesel Generator.
• Very well knowledge in Transformers and Motors (troubleshooting and installation)
• Very well knowledge in Star / Wye and Delta connection.

Electronic knowledge
• Repairing, troubleshooting and circuit designing of Electronic cards.
• Very well knowledge in semiconductor devices.
• Can be study and worked on electronic cards and diagrams.
.
Safety awareness

• Handsome Safety awareness against personal safety as well as plant safety.
• Safe working procedures (According to work permits)
• Radiation Protection Training.
• Fire fighting training.
• Rescue and first aid training.
• Use of Personal Protective Equipments (PPEs)

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

Sub Engineer

December 2005 - Present

Karachi Nuclear Power Complex

Karachi, Pakistan

December 2005 - Present

Karachi Nuclear Power Complex (Pakistan Atomic Energy Commission)
Sub Engineer Dec 2005 - Present

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

Education

NewPorts Institute

November 2012

November 2012

Bachelor's degree, Electrical Technology

Pakistan

GPA (point): 3.2 out of 4

GPA (point): 3.2 out of 4

Qualification Institute Year Div Bachelor of Technology (Honors) (Equivalent to B.E.) (In Electrical Technology) NewPorts Institute

NewPort institute

October 2012

October 2012

Bachelor's degree, Electrical

Pakistan

GPA (point): 3.2 out of 4

GPA (point): 3.2 out of 4

B-Tech Honor in Electrical Field. Very well knowledge in motor, transformer, breaker, generator etc. I have discuss all these information in my CV.

NewPort Institute (HEC Recognized)

January 2012

January 2012

Bachelor's degree, Electrical

Pakistan

GPA (point): 3.17 out of 4

GPA (point): 3.17 out of 4

(HEC Recognized) 2012 1st

Federal Urdu University Of Science And Technology

January 2009

January 2009

Master's degree, Computer Science

Pakistan

GPA (point): 2.80 out of 4

GPA (point): 2.80 out of 4

MCS (Master of Computer Science) Federal Urdu University Of Science And Technology 2009 1st

Karachi Institute Of Nuclear Power Engineering

January 2006

January 2006

Diploma, Nuclear Power Plant Operation and Maintenance

Pakistan

GPA (percentage): 88%

GPA (percentage): 88%

Post Diploma Of Technology Program (One year program) Karachi Institute Of Nuclear Power Engineering 2006 1st

Federal Urdu University Of Science And Technology

January 2005

January 2005

Bachelor's degree, Math, Physics and Computer Science

Pakistan

GPA (percentage): 63%

GPA (percentage): 63%

B.Sc. (Pass) Bachelor of Science Federal Urdu University Of Science And Technology 2005 2nd

Government College Of Technology

January 2002

January 2002

Diploma, Electronics

Pakistan

GPA (percentage): 88%

GPA (percentage): 88%

Diploma Of Associate Engineering (3 year Program) (In Electronics) Government College Of Technology 2002 1st

Government College For Men

January 2000

January 2000

High school or equivalent, Engineering

Pakistan

GPA (percentage): 63%

GPA (percentage): 63%

Intermediate (F. Sc.) Pre-Engineering Government College For Men 2000 2nd

Karachi Technical High School

January 1998

January 1998

High school or equivalent, Computer Education

Pakistan

GPA (percentage): 88%

GPA (percentage): 88%

Matriculation (TSC) Karachi Technical High School 1998 1st Computer Education Qualification Institute Year Div

Skills

Controls
Expert
Controls
Expert
Operation
Expert
Operation
Expert
Maintenance Planning
Expert
Maintenance Planning
Expert
Preventive Maintenance
Expert
Preventive Maintenance
Expert
Supervising
Expert
Supervising
Expert
ALLAN BRADLEY
ALLAN BRADLEY
ANALOG
ANALOG
ANALOG DESIGN
ANALOG DESIGN
BOILER
BOILER
CALIBRATION
CALIBRATION
CHILLERS
CHILLERS
CLEANROOM
CLEANROOM
COMPRESSORS
COMPRESSORS
CONTROL ROOM
Intermediate
CONTROL ROOM
Intermediate
ENGINEER
ENGINEER
Operation and Maintenance
Intermediate
Operation and Maintenance
Intermediate
Operation and Maintenance
Intermediate
Operation and Maintenance
Intermediate
STG and Water Desal (MED/RO) plant Operation and maintenance
Intermediate
STG and Water Desal (MED/RO) plant Operation and maintenance
Intermediate
STG and Water Desal (MED/RO) plant Operation and maintenance
Expert
STG and Water Desal (MED/RO) plant Operation and maintenance
Expert
Controls
Expert
Controls
Expert
Operation
Expert
Operation
Expert
Maintenance Planning
Expert
Maintenance Planning
Expert
Preventive Maintenance
Expert
Preventive Maintenance
Expert
Supervising
Expert
Supervising
Expert

Languages

Urdu
Beginner
English
Beginner