Muhammad Ayaz, Construction Manager

Muhammad Ayaz

Construction Manager

BESIX

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, Civil Engineering
Expérience
16 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 11 Mois

Construction Manager à BESIX
  • Émirats Arabes Unis
  • mai 2019 à décembre 2021

Bay,
• Landscape works in MAG City Meydan, Dubai.
• Palace Beach Residence Marsa, Dubai.
• Vida Marina Hotel Building Landscape works.
• Vida Marina Utility Plot Landscape works. Handling All Landscaping package including swimming pools, water features, Lilly Ponds, Irrigation system Softscape and hardscape.
Worked as Construction Manager for Besix, May 2019-Dec 2021.
• The Royal Atlantis Hotel and Residence.
• Hotel Tower Construction.

Project Engineer à ALHUSAM GENERAL CONTRACTING
  • Émirats Arabes Unis
  • janvier 2010 à août 2017

• Gate Houses Finishes works in Pier 1 ad Pier 2 Including Façade and Civil works pacakage.
Worked as a Project Engineer for Al Husam General Contracting, January 2010 - August 2017.
• New Power Upgrade 33kv Substation Building.
• Construction of 220kv Substations building.
• Rocco Forte Hotel Tourism Development & Investment Sector W 68 Abu Dhabi.
• Design and Build of Fire Fighting System Miscellaneous for Sky City Warehouse.

PROFESSIONAL EXPERIENCE

Project Engineer à ALHUSAM GENERAL CONTRACTING
  • Émirats Arabes Unis
  • janvier 2011 à août 2017

Assisting the QA/QC Team for MIR and WIR to Finals Inspections, review of ITPs, Shop Drawings & Work Orders. Planning and assigning Manpower and checking Quality of Works, Making BBS for Steel fabrications, Materials calculations as per shop drawings/approved drawings, preparation work progress report on day to day basis, Supervision of Civil activities at work site(RCC structure steel and sheltering works, masonry works, block works(all types), plastering, fair facing, waterproofing works, curb stone, interlocking, grouting, screeding, false ceiling and raise floor works, tiles/stone installations, asphalt works, Road marking, slope protections, Drainage and water supply system, repairing, painting and Interior installations. Completed 2 substations successfully Done all snagging and required Finishing like "Concrete repairing, Damage of paint, Interlock replacement, Floor tiles replacement, Damage ceiling replacement, broken stone replacement and final paint finishing" and handed over to client "ADCO"
Done snagging for Rocco Forte Hotel Abu Dhabi Project, "Concrete repairing, Painting, Stone replacement, Broken or scratch glass replacement, Water injection treatment, damage viewing replacement.
Construction of firefighting system for sky warehouse successfully handed over to client "ADAC". Construction of chambers, Installation of strainers, values, Handles, DI Covers, replacement of old water pipe lines Handed over as per client ADAC requirement.

Éducation

Baccalauréat, Civil Engineering
  • à IIE
  • juillet 2014

Specialties & Skills

Steel Structures
Finishing
Pipelines
Set Building
CONSTRUCTION
FIREFIGHTING
REPAIRING (MANUAL/MECHANICAL)
INSTALLATION
INTERLOCKING
PAINTING
PLANNING
PLASTERING
TOURISM
WATER SUPPLY

Langues

Anglais
Expert