MUHAMMAD AYAZ TAHA, Senior Mechanical Engineer

MUHAMMAD AYAZ TAHA

Senior Mechanical Engineer

SABIC E

Lieu
Arabie Saoudite - AlJubail
Éducation
Baccalauréat, MECHANICAL
Expérience
17 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :17 years, 8 Mois

Senior Mechanical Engineer à SABIC E
  • Je travaille ici depuis mars 2015

SABIC Engineering and Project Management (E & PM) assist SABIC Affiliates in implementation
of Mega and Site Projects. Its role includes preparation of Front End Engineering Design (FEED),
Detail Engineering Design and support during Project Execution, Turn Around
Primary Responsibilities:
FEED preparation that includes finalization of scope of work, cost estimation, project strategy,
and overall project schedule for fertilizer, petrochemical, steel plants contain hazardous gases,
sour gas, acids and utilities.

Project Specialist à Project Management for
  • mai 2010 à octobre 2010

QAPCO is one of the leading companies in petrochemical industry. The company is ISO certified
and well known in global market due to its quality and reliability.
Primary Responsibilities:
Reviews, evaluates and approves plant change / modification request and conceptual designs
proposals. Preparation of detailed design package consists of deliverables like design report,
BOQ, cost estimation, P&ID, piping plan, piping isometrics with pipe support details, preparation
of purchase requisitions, bid evaluation and monitoring of vendor schedule up till delivery of
material/equipment at site.
Supervises construction activities, provide assistance during commissioning, preparation of as-
built drawings and issuance of close out report
The project management includes coordination with construction contractors and HSE
department, JSA preparation for critical jobs, scheduling and monitoring for timely and safe
completion of projects. Verification of as-built drawings and approval of contractors invoice
during project close out.
The modifications include minor ones and CAPEXs and cover entire plant i.e. ethylene plants
having sour gas service medium (EP1, EP2, ERU), LDPE 1, 2 & 3, LLDPE, logistic and utility.
Major Projects:
* Basic, Detailed Engineering and Project Management linked with Replacement of sulphuric
acid line from CS to PTFE lined CS for Utility Plant
* Detailed Engineering & Project Management for Air Cooler isolation Valves installation
* Project Management for waste water sludge collection permanent facility
* Basic and Detailed Engineering for sea water inlet Self-cleaning filter
* Detailed Engineering and Project Management for Replacement of single mechanical seal
with double mechanical seal
* Project Management for SW isolation Valves replacement
Page 3 of 4
* Project Management for EP2 Ground Flare modification

Pipeline Engineer à Consolidated Contractors International Company S.A.L
  • Émirats Arabes Unis
  • août 2009 à avril 2010

is one of the largest contractor in
the Middle East involved in Engineering, procurement and construction mainly for the oil and gas,
pipelines projects.
Sahil & Shah Full Fields Development (SAS FFD) Project
This project related to the detailed engineering of two 16” SMLS MOL pipelines. The Shah-Asab
MOL is 900# rating 60Kms long while Sahil-Asab is 600# rating 48Kms long pipe line. The
engineering activities are pipeline thickness verification, crossing calculation, field bend
calculation and finalization of alignment sheets, block valve station layouts and approach
drawings.
Shah Product Pipelines (SGD Pkg 5) Project
This involves the proposal for detailed engineering of three product pipelines; 36” Gas line of
127Km, 16” NGL Line of 66 Km and 16”Condensate line of 66Km, block valve stations, launching
and receiving stations.

Mechanical Engineer à CLOUGH Pakistan (Pvt.) Ltd
  • Émirats Arabes Unis
  • juillet 2008 à juin 2009

Piping & Pipeline”
CLOUGH is Australian based engineering, construction and asset support contractor providing
full project life cycle solutions. The turnkey services range from complex front-end engineering
design, construction, installation and commissioning to long-term operations and maintenance.
Saqib-1A EWT Wellhead Development Project/ Flow Line Detail Engineering
This project includes the detail engineering of Saqib-1A sour gas Well head facility that includes
Pig Launcher, Pig Receiver, cooling tower and its associated piping. Saqib-1A flow line 8” CS, 13
km long, 900# rating and Tie-in of this flow line to the central gas processing plant.
Latif-2 EWT Wellhead Development Project
This includes the detail engineering of Latif-2 sour gas well head facility and Tie-in of flow line to
the existing Latif-1 well head facility.
Design Review of Pig Launcher and Pig Receiver Project
The scope of

Mechanical Engineer à ENAR Petrotech Services (Pvt.) Ltd
  • mars 2003 à juin 2008

ENAR is an integrated engineering and consultancy company providing complete range of
services including Project Development & Planning, Basic & Detailed Engineering, Project
Management, Procurement Assistance, Construction Management & Commissioning for
execution of projects in oil/gas processing, storage, petrochemical, chemical and fertilizer sector.
Page 4 of 4
MAJOR PROJECTS
ENAR Petroleum Refining Facility I
This project involves detailed engineering of a new process column and stress analysis of
associated piping in an existing condensate processing facility.
ENAR Petroleum Refining Facility II
This project involves basic and detailed engineering of a new condensate processing facility of
5000 BPD capacity. The work includes development of plot plan, equipment layout, piping
layouts, piping isometrics, stress analysis of critical lines and static equipment design i.e. pressure
vessel, heat exchanger, storage tank. Preparation of applicable engineering documents like
Vendor Pre-Qualification, ITB, TBA, Project Specifications and equipment data sheets for the
whole project.
Bobi Condensate Storage Tanks
This project includes detailed engineering of cone roof storage tanks for condensate storage and
its associated piping
Mela EWT Project
This project involves detailed engineering of a new sour gas well head treatment facility. The
work includes development of plot plan, piping layouts and mechanical design calculation of
Pressure Vessel (Test Separator)
BOSICOR Revamp Project
This project involves preparation of Engineering Design Specification (EDS) Packages for cooling
water system, steam generation system and raw water system. The package includes the
adequacy check of existing available system with the revamp capacity of the plant.

Project Engineer à SHANGHAI Industries (Pvt.) Ltd
  • novembre 2002 à février 2003

The company involves in production and sale of welding electrodes. The engineering activities,
which I had done are:
* Steam Piping from Boiler to different production units
* Development of associated piping layouts and piping isometrics
* Material Take off

Assistant Manager à Balochistan Engineering Works Ltd
  • mai 2002 à octobre 2002

The Company involve in the production of AUTOMOBILE PARTS. The Key Responsibilities are:
* Raw Material Planning and Controlling
* Production Planning and Controlling
* Costing of parts
KNOWLEDGE OF STANDARDS
Sound knowledge of frequently used codes, standards and accepted international practices:
* API 650, 610, 12D, 12F, 5L, 6A etc.
* TEMA, ASME Section VIII Div. I, ASME Section II

Éducation

Baccalauréat, MECHANICAL
  • à NED University of Engineering and Technology
  • mars 2002

courses: * CERTIFICATEINPIPELINEENGINEERING (DistanceLearning) 2009 IBCGlobalAcademy

Specialties & Skills

Heat Exchangers
Storage Devices
Pipeline Design
Pressure Vessels
MECHANICAL DESIGN
PROJECT MANAGEMENT
UTILITIES
Pipeline Design
Piping Design
Risk Management

Langues

Urdu
Langue Maternelle
Anglais
Moyen

Adhésions

PMI - PMP
  • PROJECT MANAGEMENT PROFESSIONAL
  • March 2016
PMI - RMP
  • RISK MANAGEMENT PROFESSIONAL
  • March 2016