Week internship
Pak Elektron Limited
Total years of experience :0 years, 2 Months
4 Week internship at Pak Elektron Limited (PEL) Lahore in Electrical Energy Meters.
PROFESSIONAL SKILLS
• Software Skills: Proteus, Circuit Maker, Keil
• Programming Languages: C++, Matlab
• Utility Softwares: MS Word, MS PowerPoint
FINAL PROJECT
Three Phase Fault Detection and Fault Removal using Autorecloser Technique
Project Synopsis:
The project is designed to develop an automatic tripping mechanism for the three phase supply system.
The project output resets automatically after a brief interruption in the event temporary fault while it remains in tripped condition in case of permanent fault.
The electrical substation which supply the power to the consumers i.e. industries or domestic can have
failures due to some faults which can be temporary or permanent. These faults lead to substantial damage to the power system equipment. In Pakistan it is common to observe the failures in supply system due to the faults
that occur during the transmission or distribution.
The faults might be LG (Line to Ground), LL (Line to Line), 3L (Three lines) in the supply systems and these
faults in three phase supply system can affect the power system. To overcome this problem a system is built,
which can sense these faults and automatically disconnects the supply to avoid large scale damage to the control gears in the grid sub-stations.
OTHER PROJECTS
• Temperature sensor using PIC controller
• Speed control of motor using PWM technique
• Programming for Stepper Motor Speed and direction control
• Light and dark detector
• Thesis report on the temperature detection of a body without physical contact, using IR radiations.
Degree Year of Passing C.G.P.A/ GRADE Institute BS Electrical Power 2014 3.00 COMSATS Institute of Engineering Information and Technology Abbotabad
F.Sc 2009 A Sir Syed College The Mall Rawalpindi
School Chakwal