محمد الاحمد, site engineer

محمد الاحمد

site engineer

Maintenance B.v.

البلد
بلجيكا
التعليم
بكالوريوس, civil engineering
الخبرات
32 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :32 years, 9 أشهر

site engineer في Maintenance B.v.
  • بلجيكا
  • أشغل هذه الوظيفة منذ مايو 2014

Location: All Belgium
Company:Special office for maintenance of buildings
A small company buys old houses and renovates them and then sells them according to market prices
My tasks
Studying the cost, maintenance and execution of the works according to a timetableCivil works Maintenance of water networks, maintenance of the structure and restoration of buildings

construction manager في SAIPEM ,OGEC
  • الجزائر - الجزائر
  • يناير 2012 إلى مايو 2014

Construction manager
The company is engaged in the implementation of gas and oil projects in Algeria, Sudan, Qatar and the UAE and has a large number of engineers, technicians and surveyors as well as a large number of engineering mechanisms has implemented many large projects
My tasks
 The implementation of projects according to specifications includes works of surveying, excavation, reclamation, welding works of lines, insulation and pressure
As well as the civil works of the implementation of the stations fuse sites
Project 220 km 6”, 8”, 12”, 18”, 28” of pipeline
Location: Hassi Messaoud, Algeria
Client / Partner SNC-Lavlin
Company Industry: OGEC Construction/Civil Engineering
The works of gas lines include earthworks from survey works, road construction, excavation of trenches, loading of lines, paving and embankment, as well as welding and insulation works.

construction mamager في IGAM
  • الجزائر - الجزائر
  • نوفمبر 2009 إلى يناير 2012

Location: Algiers, Gk3 Algeria
Company Industry: IGAM /The company works in the field of oil and gas projects and has a large number of engineers, technicians and surveyors as well as a large number of engineering mechanisms has implemented many large projects
The company works in the field of oil and gas projects and has a large number of engineers, technicians and surveyors as well as a large number of engineering mechanisms has implemented many large projects
The works of gas lines include earthworks from survey works, road construction, excavation of trenches, loading of lines, paving and embankment, as well as welding and insulation works.
Civil works for Gas pipeline 48 inch, concrete works
Gk3 gaz pipeline 265 km 48 inch

General maneger في General Establishment for Water Supply and Sanitation
  • سوريا
  • مايو 2002 إلى فبراير 2007

general manager
Location: Syria, Deir ezzor
The company works in the field of study and supervision of water projects such as filters, sterilization of large and small water, major water networks, large and small sub-cities, water reservoirs and highlands
And study water consumption
And provide services to citizens from the maintenance of lines

My Tasks
Chairman of the Board of Directors working on the development of the company's plans and follow-up implementation. Follow-up projects and time programs with secondary contractors study the submitted reports and give the necessary solutions and fast
Contribute to the development of the Foundation's plans
Sign contracts with companies and attend conferences related to work
Follow up plans and projects and supervise the work of the technical office. control building, laboratory Building
Follow-up work of the maintenance office and includes stations and networks of cities and major water lines and includes the Foundation 2000 workers of engineers and technicians

assistant of general maneger في General Establishment for Water Supply and Sanitation
  • سوريا
  • مارس 2000 إلى مايو 2002

Assistant of general manager
Deir Ezzor, Syria
The company works in the field of study and supervision of water projects such as filters and sterilization of large and small water and networks of water main and sub-cities of large and small and reservoirs of water and high ground
 And the study of water intake
My tasks
Developing the company's plans and follow-up their implementation Follow-up projects and time programs with the secondary contractors and report to the Board of Directors
Studying project contracts and studying major tenders for major projects in the city
The company works in the field of study and supervision of water projects such as filters, sterilization of large and small water, major water networks, large and small sub-cities, water reservoirs and highlands
And study water consumption
And provide services to citizens from the maintenance of lines

technical maneger في general water establishment
  • سوريا
  • يناير 1994 إلى مارس 2000

The company works in the field of study and supervision of water projects such as filters and sterilization of large and small water and networks of water main and sub-cities of large and small and reservoirs of water and high ground
 And the study of water intake
 My tasks:
Study projects in the Department of studies and design and supervision of the implementation of projects in the implementation section and maintenance section of the operation of stations and maintenance networks
The implementation of high water tanks capacity 100, 150, 300, 500 cubic meters
Implementation of Water treatment station, water network, water treatment plants)
Implementation of stations capacity of the station 150 cubic meters per hour and 200 cubic meters per hour
Implementation of water networks in the city of Deir ezzor length of 450 km with different diameters

site engineer في constrction company(البناء)
  • سوريا
  • يناير 1989 إلى يناير 1994

site engineer
The company works in the field of large projects such as hospitals, villas, residential buildings, bridges and roads
Company Industry: Company for the implementation of residential buildings, students and hospitals
My duties in the company
A project engineer is responsible for the implementation of the project according to what is planned according to the specifications and time period
Management of workers, machinery and materials
Implementation of housing units (500 house in Deir Ezzor), water network 450km
large hospital in Deir ezzor, Implementation of university housing in Deir ezzor







International Training:
1. Conex co. Germany company for water equipments 1994
2. Seba co. (Austria ) for water leak, equipments 1998
3. Deyzin co. (Turkey) for poly ethylene pipes 1999.
4. Nova hut co.(Czech republic) for iron pipes 2001.
5. Ponta-musson co. (France) for ductile iron pipes 2002.
6. Nijhouse co ( Netherlands) for equipments 2003

• Driver license: B
Computer programs:
• M. S. Projects, Autocad, primavera
• WORD
• EXCEL

الخلفية التعليمية

بكالوريوس, civil engineering
  • في civil engineering
  • أكتوبر 1988

Specialties & Skills

Oracle Enterprise Manager
On Site
Rational Team Concert
Rational Portfolio Manager
Leadership within the team
Experience in the calculation of quantities

اللغات

العربية
متمرّس
الانجليزية
متوسط
الهولندية
متوسط

العضويات

Syrian Engineers Syndicate
  • Member of the Committee on Civil
  • June 1989

التدريب و الشهادات

LEAKE OF WATER (الشهادة)
تاريخ الدورة:
March 1998
صالحة لغاية:
April 1998

الهوايات

  • sport
    Play Tennis