محمد geovani, Senior Pipeline Engineer

محمد geovani

Senior Pipeline Engineer

QATAR PETROLEUM

البلد
إندونيسيا
التعليم
ماجستير, Chemical Engineering
الخبرات
22 years, 1 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 1 أشهر

Senior Pipeline Engineer في QATAR PETROLEUM
  • قطر - الدوحة
  • أشغل هذه الوظيفة منذ يناير 2019

I am the pipeline focal point for both offshore and onshore pipeline project in Qatar Petroleum.
Currently handling 5 onshore and 1 offshore pipeline projects.

Team Leader في GASCO
  • الإمارات العربية المتحدة
  • يونيو 2016 إلى أغسطس 2017

I was the focal point to guide our CONTRACTOR for all project related, both in technical and commercial aspects for EPC stage of HP Pipeline Inter-Connection for NGV Filling Station Phase 2A.
Strategic Objective: Under Clean Fuel Initiative, ADNOC promotes use of CNG as fuel for vehicles in UAE thus, established in two phases, some facilities for dispensing CNG (Compressed Natural Gas); NGV Phase-1 project had established facilities to supply gas to Service Stations in Abu Dhabi, Al Ain and Sharjah from the existing gas pipeline network. The NGV Phase-2A (Natural Gas Vehicles) project is currently under EPC execution to supply gas to more stations.
Scope Brief: Design, Procure & Install High Pressure Pipeline Connections to the Main Gas Pipeline for 3 NGV stations, through Above Ground Installations complete with facilities and equipment as required for Mahawi (Abu Dhabi) and Al Faqaa (Old and New) (Al Ain) Service Stations.

Lead Pipeline Engineer في TECHNIP FRANCE, ABU DHABI, UAE
  • نوفمبر 2014 إلى يونيو 2016

I was responsible to Lead, coordinate and handle team of pipeline engineers to deliver all pipeline related tasks for Rashid C Project with client Dubai Petroleum and Haliba Development Combined Concept and FEED Project with client Al Dhafra Petroleum Ltd.
Projects Handled

في AL DHAFRA-Haliba Field Developmen
  • يوليو 2015 إلى مايو 2016
  • نوفمبر 2014 إلى يوليو 2015
  • ديسمبر 2012 إلى أكتوبر 2014

Indonesia Deepwater Development Onshore Receiving Facilities (IDD-ORF) FEED Project
FEED Contractor(s): PT. Singgar Mulia (ORF & Onshore Pipelines), Worley Parsons (Subsea Flowlines & Offshore Pipelines), Technip (FPU)

Lead Pipeline Engineer في CHEVRON IBU (INDOASIA BUSINESS UNIT), JAKARTA
  • أبريل 2011 إلى أكتوبر 2014

I was a focal point to direct our CONTRACTOR for all pipeline related technical and commercial aspects for FEED project and EPC package tendering process of Indonesia Deep water Development Project (IDD) Gendalo-Gehem. Indonesia Deepwater Development project is multibillions project. The project covers the deepwater development of four fields: Gendalo, Maha, Gandang and Gehem. The facilities will be consist 2 (two) Floating Production Unit (FPU), subsea, export pipelines and onshore receiving facilities (ORF). The raw gas will be processing at FPU to meet gas specification requirement and sent to ORF through export pipeline. The processing gas from these facilities will be sent to Badak LNG Plant through onshore pipeline. Gendalo FPU’s design capacity will be 700 MMSCFD of gas and 25MBOPD of condensate while Gehem FPU’s design capacity will be 420 MMSCFD of gas and 30 MBOPD of condensate.


Projects Handled

Indonesia Deepwater Development Onshore Receiving Facilities (IDD-ORF) Project Tendering

في NATIONAL PETROLEUM CONSTRUCTION COMPANY
  • الإمارات العربية المتحدة
  • أبريل 2011 إلى ديسمبر 2012
Lead Pipeline Engineer في ABU DHABI, UAE
  • أغسطس 2008 إلى أبريل 2011

I was responsible to Lead, coordinate and handle team of pipeline engineers to handle several EPC projects including BAB-THAMAMA 2 (ADCO) and TAKREER IRP-2, 24in MGL pipeline replacement project (ADMA-OPCO), RS-11 & 12 (ONGC) and several proposals including Safaniya Saudi Aramco, ASAB ADCO, Qushawira ADCO and IGD ADGAS.


Projects EPCI Handled

Project 9055-BAB Thamama-G & Habshan 2 Development 1.8MMBPOD (Sour Gas product)
Client: ADCO (Abu Dhabi Oil Company for Onshore Operation)

Project 9023- Inter Refinery Pipelines (IRP) Pipelines Relocation Project
Client: TAKREER (Abu Dhabi Oil Refinery Company)

Project 6073 - STABILISATION WORKS FOR 24" MGL FROM ZCSC TO ZWSC (Oil Product)
Client: ADMA-OPCO (Abu Dhabi Marine Operating Company)

Project 8119-RS-12 & RS-14 Well Platform Project (Sour Gas Product)

في TAKREER
  • الإمارات العربية المتحدة
  • نوفمبر 2007 إلى أغسطس 2008

2. Doha Urban Pipeline Relocation Project (DUPRP) (Sour Gas Product)

Senior Pipeline Engineer في TEBODIN MIDDLE EAST LTD
  • الولايات المتحدة
  • يناير 2007 إلى أغسطس 2008

I was responsible to handle several projects including DUPRP Project (QP), PMC Project - IRP-1 TAKREER, KEO project in Dubai and several proposals including pipeline from Doha to Mesaieed Refinery (QP), NGV filling station (ADNOC).

Projects EPC Handled

Inter Refineries Pipelines (IRP) as PMC (SRR, Jet A1 and Multiphase Oil Product)

في Qatar Petroleum
  • الإمارات العربية المتحدة
  • يناير 2007 إلى ديسمبر 2007
في Inter Refinery Pipeline Project – IRP
  • الولايات المتحدة
  • مايو 2007 إلى يوليو 2007

2. QP-18” Dia New Multi-Product Pipeline from Doha Depo to Messaied QP Refinery
Client: Qatar Petroleum (QP) Qatar
Period: June 2007

3. NGV Filling Stations High Pressure Pipeline Connections (14” Dia New Gas Pipelines) onshore

في CPC-China Petroleum Corporation
  • أكتوبر 2006 إلى يناير 2007
Subsea Pipeline Engineer في SAIPEM – JAKARTA, INDONESIA
  • فبراير 2005 إلى يناير 2007

Sea-line, Umbilical, Riser & Flow-line) Department

I was responsible to handle BP TANGGUH GPF Project and several proposals including ENI Black Tip Gas Project - EPC Pipeline System and WHP Installation, PLUTO LNG Project and “F” Field Development Project.

Projects EPC Handled

BP-Tangguh GPF Project Pipeline Detail Design (24” Offshore Gas Pipeline (40km length) (Sour Gas Product)

في Woodside
  • سبتمبر 2006 إلى أكتوبر 2006

3. “F” Field Development Project (16” Offshore Gas Pipeline (119km) (Offshore)

Period في BP Berau
  • مارس 2005 إلى يوليو 2006

FEED

1. ENI Black Tip Gas Project - EPC Pipeline System and WHP Installation (18” Gas P/L (100km) + 14” Condensate Line (5km) + 140mm OD 95km) Produced Waterline (PE Linepipe) offshore
Client: Eni Australia BV
Period: July 2006 to September 2006
2. PLUTO LNG Project (36” Gas Trunkline (180km) & 8” MEG line (117 km) offshore

في Chevron Texaco Duri
  • أغسطس 2004 إلى يناير 2005
Pipeline Engineer في AMEC
  • إندونيسيا
  • يناير 2003 إلى يناير 2005

I was responsible to handle several projects including Trunk-line Design Deficiencies project (KUFPEC), Technical Assistant Contract, Jatirarangon Field Development (Ellipse Energy-Pertamina), Preliminary Engineering Services Kerisi Development (CONOCO-PHILIPS), Pre-FEED Design Study Amposta Field Development (EUROGAS), Pre-FEED Design Study Siberia Pipeline (BP-TNK), Detail design of Kulin pipeline (CALTEX PACIFIC INDONESIA).

Projects EPCI & FEED Handled

Trunk-line Design Deficiencies (Onshore) (Crude Product)

في ONGC
  • الهند
  • يناير 2005 إلى يناير 2005

Wellhead Platforms for B-193 Project
Client: ONGC (Oil and Natural Gas Corporation)

6. 9023- Inter Refinery Pipelines (IRP) Pipelines Relocation Project

في EUROGAS
  • أغسطس 2004 إلى نوفمبر 2004

Pre-FEED Design Study Siberia Pipeline (Offshore) (Sweet Gas Product)

في BP-TNK
  • يناير 2004 إلى نوفمبر 2004

Detail Design Kulin Pipeline (Onshore) (Crude Product)

في CONOCO PHILIPS INDONESIA lnc. LTD
  • مايو 2004 إلى أغسطس 2004

Pre-FEED Design Study Amposta Field Development (Offshore) (Sweet Gas Product)

في PERTAMINA-ELLIPSE ENERGY
  • فبراير 2004 إلى مايو 2004

Preliminary Engineering Services Kerisi Development (Offshore) (Crude Product)

في KUFPEC (Indonesia) Ltd
  • نوفمبر 2003 إلى فبراير 2004
Pipeline Specialist في MUHAMMAD GEOVANI
  • فبراير 2001 إلى نوفمبر 2003

with a solid 18 years of experience in the pipeline engineering design, fabrication, installation, hook-up and commissioning support of pipeline facilities for both onshore and offshore field.
Core expertise includes:
PMC (Project Management Consultancy)
Conceptual and FEED Study
Detail design activities of natural gas, liquid and multiphase fluid pipeline for flow lines (including pipeline for offshore Well Head Platform/WHP), trunk lines, and city distribution network
Familiar with design reviews, subcontracting, method and installation of Pipeline and FOC/Power Cable.
Identify and manage project risk
Oversee pipeline survey, construction, pre-commissioning / commissioning activities, progress report, deliverables and documentations
Project interfaces
Develop project lessons learned
10. Hands on experience in pipeline engineering software & spread sheets (Auto PIPE, CAESAR II, Mathcad, Plus-One, AGA, SAGE profile, OFFPIPE, ORCAFLEX, Pipeline Toolbox, DNV spreadsheets)
11. Familiar with MIGAS and other GOI Body Regulations (i.e. Decree of the Minister of Mining and Energy No. 300.K/38/M.PE/1997, Decree of Director General MIGAS nor.84k /38/DJM/1998, Regulation of Director General MIGAS No. PPS-04 yr. 1971, Permentamben 1991, PTK-007, etc), Operating Company Standard (BP, Shell DEPs, Qatar Petroleum, Saudi ARAMCO, ADNOC, ADCO, ADMA-OPCO, TAKREER, ADGAS, GASCO DGS, ONGC, CHEVRON), and Codes (API, ASME B31.4, ASME B31.8, ISO 13623 and DNV’s)
Geographical area of experience includes Engineering and Construction of a wide selection projects in South East Asia, Middle East, Eastern Europe and Australia.

Pipeline Engineer في TRIPATRA ENGINEERS AND CONSTRUCTOR LTD
  • إندونيسيا
  • يناير 2001 إلى يناير 2003

I was responsible to perform and ensure all pipeline technical aspect of 28” Pipeline Transmission and Distribution Project to build Gas Pipeline from Sumatera (Indonesia) to Singapore's border. This was the first huge scale and technically complicated project of 28 inch dia. Gas Pipeline Transmission and Distribution Project built in Indonesia. Have approximately 1000km length in total, with nearly 85% was onshore portion, laid through many difficult construction fields consist of swampy, rocky & hilly area with maximum elevation difference up to 1800ft in unexplored Sumatera's and its satellite island’s dense rainforest, including offshore pipe laying thru highly busy channel of Malacca’s Strait (The strait is the main shipping channel between the Indian Ocean and the Pacific Ocean, linking major Asian economies such as India, China, Japan, Taiwan, and South Korea. Over 94, 000 vessels pass through the strait each year) with relatively tight window allotted for pipe laying schedule, Finally the project has achieved completion delivered 400 MMSCFD natural gas to the highest level satisfaction of our client, Indonesia's Gas Company (PGN) and its stake holders.
Projects EPCI Handled
28” Pipeline Transmission and Distribution Project to build Gas Pipeline from Sumatera (Indonesia) to Singapore (Sour Gas Product)
Client : PT Gas Negara (PGN)

في ADNOC
  • الولايات المتحدة
  • يوليو 2007 إلى
في Emirates
  • الولايات المتحدة
  • يناير 2015 إلى

Cross-country (Onshore) Pipeline Engineering & Construction by Gulf Interstate Engineering-2001, Jakarta-Indonesia
•Subsea Pipeline Design & Installation-2005, SAIPEM, Jakarta-Indonesia
•HUET and Sea Survival training and certification (Conducted by Samson Tiara - CILEGON, Indonesia)-2006 and JOTC-2013
•International Gas Pipeline Conference GPC-2009, Kempinsky Hotel-Munich, Germany
•Pipeline Risk Management Conference-2010, Le Meridian Hotel- Abu Dhabi-UAE









Point wise of Responsibilities through the Career Span:
•Manage team of Pipeline Engineers to deliver complete design of pipeline facilities from the Wellhead’s Christmas Three connection’s battery limit (i.e. WHP for offshore) to the Receiving Facilities/ End customer for both Offshore and Onshore field.
•Develop Pipeline Basis of Design
•Develop design criteria for design, construction and installation of pipeline
•Develop Route and ROW selection according to soil conditions, interventions to be executed before and after pipeline laying, statutory constraints, and cost optimization
•Prepare scope for Topographic/Bathymetric and Geotechnical Survey
•Wall thickness calculation
•Coating Selection
•Selection of pipeline crossing method
•Pipeline material and corrosion allowance selection
•Pipeline thermal stress analysis
•Design of spool pieces to connect pipelines and wells
•Design of isolating and sectioning systems for pipeline network
•Design of block valve station and pig trap area
•Preparation of general specification for hydrostatic test, de-watering, pre-commissioning and commissioning
•Preparation of project specification and data sheet for pipeline procurement and construction
•Preparation of drawings as Key Plan, Alignment Sheets, Typical detail, etc
•Preparation of MTO (Material Take Off)
•Preparation of database GIS (Geographic Information System)
•Review on studies for integrity philosophy, pig ability system assessment, inspection and maintenance plans and preparation of specification for internal and external inspections
•Preparation of ITT documentation
•Follow-on activities and interdisciplinary coordination / interface
•Preparation of report and technical notes for pipeline design in different operating conditions
•Company representative on board subsea facilities/pipeline construction, installation, and inspection
•Supervision of inspection and maintenance of company sub-sea facilities, pipeline network, offshore structures, and loading terminals.
•Coordination with Company representative to supervise corrosion and integrity assessment of sub-sea facilities
•Facilitate project weekly and monthly (progress) meeting
•Facilitate design review meeting for each disciplines between COMPANY and CONTRACTOR/VENDOR
•Facilitate HAZID and HAZOP workshop
•Facilitate COMPANY’s Technical Expert (TE) and End User (EU) acceptance of Design Change Authorization (DCA) proposed by CONTRACTOR.
•Facilitate Project Risk Assessment Workshop
•Facilitate Pre-Inspection Meeting (PIM) with equipment’s vendor/manufacturer
•Facilitate Pre-qualification visit to vendor/manufacturer’s facility
•Facilitate Request for Inspection (RFI) from CONTRACTOR (arrange TPI, etc)
•Facilitate Factory Acceptance Test (FAT)
•Facilitate meeting with project stakeholders, partners to establish any interface issues such as tie-in (i.e Hot Tap) and pipeline crossings agreement.

في Offshore & Onshore Trunklines
  • يناير 2009 إلى
في GASCO
  • الإمارات العربية المتحدة
  • يناير 2008 إلى

Thamama-G & Habshan 2 Development 1.8MMBPOD Project
Client: ADCO (Abu Dhabi Oil Company for Onshore Operation)

في TAKREER
  • الإمارات العربية المتحدة
  • يناير 2007 إلى
في ADGAS
  • الإمارات العربية المتحدة
  • يناير 2003 إلى

Oil and Natural Gas Corporation LTD.)

4. 9045-Subsea Pipelines for B-193 Project

في Integrated Gas Development Tender-DAS Island
  • يناير 2002 إلى
Tender في ONGC
  • الهند
  • يناير 2001 إلى

Process Platform & Living Quarters

في DUBAI PETROLEUM
  • الإمارات العربية المتحدة
  • يناير 2015 إلى
في ADNOC
  • الإمارات العربية المتحدة
  • يناير 2010 إلى

الخلفية التعليمية

ماجستير, Chemical Engineering
  • في University of Indonesia (UI)
  • يوليو 2014

Cum Lauder

بكالوريوس, Bandung-Indonesia
  • في Bandung Institute of Technology (ITB)
  • يناير 2001

Specialties & Skills

Refinery
Data Sheets
CABLING
CUSTOMER RELATIONS
FILE MANAGEMENT
NATURAL GAS
NETWORKING
OIL PAINTING
PROPOSAL WRITING
CONCEPT DEVELOPMENT