محمد كاشف Rafique, Construction Project Manager

محمد كاشف Rafique

Construction Project Manager

SNC Lavalin

البلد
الإمارات العربية المتحدة
التعليم
بكالوريوس, Mechanical Engineering
الخبرات
15 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 5 أشهر

Construction Project Manager في SNC Lavalin
  • المملكة العربية السعودية - الجبيل
  • يناير 2017 إلى سبتمبر 2020

• Managed all project activities, Engineering till commissioning activities.
• Lead team of engineers and site assisting staff
• Managed resources for the activities in the Project
• Ensured all Fabrication activities by contractor within budget
• Coordinated with client and third party to resolve construction issues
• Implemented the Project Quality Plan at site and propxecution of Fabrication er monitoring
• Issued TQ (Technical Query) to Client if required
• Attended coordination meetings with Client & Consultants
• Prepared the method statements for work activities as well as developing specific method statements for every special activity at site
• Conducted daily progress meetings with planning engineer and site personals to tract the daily activities as per work schedule

Construction Manager في ADYARD
  • الإمارات العربية المتحدة - أبو ظبي
  • مايو 2015 إلى ديسمبر 2016

SATAH AL RAZBOOT(SARB)PKG4 PROCESS 12 NO MODULES ADMA OPCO ZIRKU ISLAND ABU DHABI UAE 10693 METRIC TON
 Managed all project activities, Module Fabrication of structural steel, Piping, Equipment installation, assembly of Module, testing, Painting, Fireproofing, insulation and construction activities. Co-ordinate with other project sections to achieve targets. Deal with clients and client representative.
 Establish the overall work plan, daily site resource allocation, coordinating site activities, mobilization plan and review them periodically to ensure the project performance.
 Optimizing the allocated resources for assigned works to meet budget and minimize deviations in resource requirements and forecasts.
 Managing all activities related in this procedure concerning to construction aspects of the project

Deputy Project Manager في Petromar
  • انغولا - Soio
  • مارس 2012 إلى أبريل 2015

 Managed all project activities, Module Fabrication, Piling Structure, Offshore Rig Skids and structures, Assembly, Rolling of sheets, pipelines, piping fabrication and construction activities.
 Lead team of engineers and site assisting staff
 Managed resources for the activities in the construction
 Coordinated with client and third party to resolve construction issues
 Prepared the Project Quality Plan and designing of all the relevant forms to collect the required data as per PQP as well as contract requirement
 Implemented the Project Quality Plan at site and proper monitoring
 Quality audits to check the effectiveness of quality plan
 Conducted Engineering meetings with the technical departments and review the construction drawings.
 Issued TQ (Technical Query) to Client if required
 Attended coordination meetings with Client & Consultants
 Prepared the method statements for work activities as well as developing specific method statements for every special activity at site
 Conducted daily progress meetings with planning engineer and site personals to tract the daily activities as per work schedule
 Raised NCRs to concerned departments on any non-conformance occurred and reviewing the problem

Senior Mechanical Engineer في Fortesa International
  • السنغال - Dakar
  • مارس 2009 إلى فبراير 2012

 Managed all maintenance, shutdown, welding and construction activities of piping, pipeline, gas processing plants, tanks
 Overviewed Workshop Activities
 Managed project QC procedures, instructions, records and documents
 Evaluated quality control activities, records and documentation, reporting, quality trends and implement corrective actions
 Conducted preparatory meetings for each new element of work prior to starting the new activity on site
 Performed all tests in accordance with ACI and ASTM testing procedures and standards
 Performed reinforcing steel inspections on material and installations
 Managed the “pour card” system to ensure that all rough-in and formwork elements are installed correctly and completely prior to releasing concrete for placement
 Managed the quality control testing for all mechanical and plumbing systems (i.e. pressure testing, leak testing, water testing, etc.)
 Issued notices of non-compliance for work which fails to meet the specification criteria, and manages the list until all activities are completed
 Prepared the punch-list in conjunction with the client and manages the list until all activities are completed

QA/QC Engineer في Orient Petroleum Inc
  • باكستان - إسلام أباد
  • مايو 2005 إلى فبراير 2009

 Installed and erected Kausar Phase II, 100 MMSCFD
 Kausar condensate handling facility
 Installed Hanover compressors at Naimat Basal field
 Ahmed to Kausar 6”pipeline project 4.5 KMs
 Kausar-Tuba Facility Work
 Pipeline Project 4.5 KMs
 Installed Wellhead compressors at Kausar & Umer Fields (4NOs)

الخلفية التعليمية

بكالوريوس, Mechanical Engineering
  • في University of Engineering and Technology Lahore
  • يناير 2005

Specialties & Skills

Inspection
Pipelines
Operation
Construction & Property
Autocad
MS Office
MS Word
MS Excel

اللغات

الانجليزية
متمرّس
الأوردو
اللغة الأم

التدريب و الشهادات

IQCS Certification Auditor/Lead Auditor QMS ISO 9001:2000 A18021 IRCA Certified (الشهادة)
تاريخ الدورة:
March 2016
صالحة لغاية:
August 2042

الهوايات

  • Driving
    Defensive Driving Certificate from KSA