محمد خليل, Senior Environmental Engineer

محمد خليل

Senior Environmental Engineer

AECOM

البلد
كندا
التعليم
ماجستير, Civil and Environmental Engineering
الخبرات
22 years, 3 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 3 أشهر

Senior Environmental Engineer في AECOM
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ أكتوبر 2013

Canada Limited, Edmonton, Alberta, Canada
Currently working as Senior Environmental Engineer with AECOM in the Edmonton office. My responsibilities include preparing proposals, civil design of remediation works, landfill design, landfill airspace modeling, bid and contract documents, construction oversight of landfills, QA/QC of landfill lining systems, technical reports, stormwater management facility designs and environmental audits. Preparation of regulatory applications and liaison with regulatory bodies is included in my duties. The following text provides a brief description of my AECOM experience.
•The City of Calgary, Spyhill landfill, Stage III Phases 5 and 6 development, Calgary, Alberta: Completed design of Phases 5 and 6. Oversaw slope stability analysis.
•The City of Calgary, Spyhill landfill, Stage I Closure, Calgary, Alberta: Oversaw completion of geotechnical modeling of synthetic cap for the utility pad that would receive six axle tanker trucks. Completed a synthetic barrier layer material evaluation to select the most suitable alternative. Designed water drainage system located over the synthetic barrier layer. Oversaw the design of landfill gas venting system below the cap. Prepared a final grading plan for the utility pad.
•Pembina Pipepline Corporation, Redwater, Alberta: Designed leak detection system for the double lined brine Pond # 5. Prepared specifications for the double containment and leak detection systems.
•Drumheller & District Regional Landfill, Drumheller, Alberta: Completed design and development plan for the landfill. Prepared EPEA Approval renewal application.

Staff Environmental Engineer في AMEC Foster Wheeler
  • كندا
  • يوليو 2006 إلى أكتوبر 2013
Civil Engineer في RJM Engineering Inc
  • الولايات المتحدة
  • يوليو 2005 إلى مايو 2006

Mainly worked on projects pertaining to Maryland state highway administration and the county governments. My responsibilities included:
•Design and resurfacing of roadways.
•Design of storm water management systems.
•Storm drain design.
•Design of erosion/sediment control systems.
•Environmental permitting.
•Developing specifications and contract document.

Research Assistant في University of Maryland, Baltimore County
  • الولايات المتحدة
  • يناير 2004 إلى يناير 2005

My thesis was focused on understanding the binding and availability of polyaromatic hydrocarbons (PAHs) in Manufactured Gas Plant site sediments to facilitate site specific risk assessment. The research involved measurement of site-specific partition coefficients of PAHs at several sites along Hudson River and investigating whether differences in measured partition coefficients can be explained based on differences in PAH association with organic particle types in sediments. This research was completed in collaboration with the RETEC group and the University of North Dakota. I am well versed in the following aspects of research:
•GC-MS analysis of PAHs.
•Data analysis and interpretation.
•PAH risk assessment.
•PAH binding mechanisms and aqueous partitioning.
•PAH clean-up for injection in GC-MS.
•Technical report writing.
•Particle scale analysis.

Design Engineer في BAK Consulting Engineers
  • باكستان
  • نوفمبر 2001 إلى أغسطس 2002

Worked with BAK Consulting Engineers on Malakand-III Hydro-Power Project, Pakistan. This project involved the construction of a Hydro-Power plant. Irrigation water was collected from a higher elevation and channeled through hills via channels, tunnels, aqueducts and super passages to a forebay. Water from the forebay was directed onto the turbines using penstocks. I was responsible for redesigning of cascade spillway used to dispose off excess water to the irrigation channels downstream. Completed the following tasks:
•Structural design of cascade spillway.
•Access road design.
•Design of open rectangular channels.
•Planning and design of residential buildings.
•Design of foot bridges.
•Design of retaining walls.
•Quantity estimation.

Site Engineer في Engineering Consultants Intl (Pvt) Ltd
  • باكستان
  • يناير 2000 إلى يوليو 2001

Worked with ECIL, Pakistan as a Site Engineer in Primary Education Program. This project involved new construction and rehabilitation of existing multi-story school buildings. Performed the following duties:
•Building layouts
•Quality control/Quality assurance
•Quantity surveying
•Tube wells
•Progress monitoring report
•Bill of quantities.

في Capital Power Genesee Plan
  • كندا
  • يناير 2012 إلى

Prepared design plan for the decommissioning and remediation of chemical pond,

في Mackay River Landfill, Ft. Mac, AB
  • يناير 2007 إلى

Assisted Petro-Canada in preparation of closure plan in

Staff Environmental Engineer في AMEC
  • الكويت
  • إلى

in the Edmonton office. My responsibilities included preparing proposals, civil design of remediation works, landfill design, landfill airspace modeling, bid and contract documents, construction oversight of remediation works and landfills, QA/QC of landfill lining systems, technical reports and stormwater management facility designs. Preparation of regulatory applications and liaison with regulatory bodies was included in my duties. Various aspects of my experience are summarized in the following text:

•Rocky Mountain Regional Solid Waste Authority, Rocky Mountain Regional Landfill, Rocky Mountain House, Alberta Area “A” Landfill Expansion Completed design, tender documents and construction oversight, 2013.

في Redwater Water Disposal Company
  • إلى

Redwater, Alberta: Designed and supervised construction of groundwater interception trench systems including contract documents for five produced water contaminated sites.
•Northern Village of La Loche, Saskatchewan: Completed design of the new 25 year landfill in 2011.
•Howe Sound Pulp & Paper, Port Mellon, BC: Completed liner CQA for cell 2B construction in 2011.
•Responsible for management and maintenance of Trimble GPS equipment of the
AMEC E & I Edmonton unit including data upload/download and differential correction.
•AlPac Pulp Mill, near Athabasca, Alberta: Completed design and construction supervision of the industrial waste landfill - cell 2B and QA/QC program for the rehabilitation of compacted clay liner at the spill pond. Completed airspace modeling of the existing operating industrial waste landfill cells in 2010 and 2011.
•Imperial Oil Limited, Calgary Airport Terminal: Managed drilling program and completed secondary containment liner evaluation at the IOL jet fuel storage facility in 2010.
•Rocky Mountain Regional Solid Waste Authority, Rocky Mountain House, Alberta: Prepared preliminary design of the landfill expansion plan including landfill modeling and assisted the project manager in preparing regulatory application. Completed airspace modeling for Pit 3 in 2011.
•Bragg Creek Transfer Station, Bragg Creek, AB: Prepared landfill closure plan and other improvements.
•Marie Lake Landfill, AB: Prepared landfill closure plan.
•Skookumchuck Pulp Mill landfill, Skookumchuck, BC: Completed CQA program for synthetic liner installation at cell 2 in 2008 and airspace modeling of cell 2 in 2010.
•Capping of the non-operating landfill, Irricana, AB: Completed design, prepared contract documents and performed construction oversight in 2008 and 2009.
•Petro-Canada: Assisted Petro-Canada in preparation of regulatory application for the reclassification of the underground test facility (UTF) as a Class IA disposal facility, Dover Site, located 40 km north of Ft. McMurray, AB in 2007 and 2008.

الخلفية التعليمية

ماجستير, Civil and Environmental Engineering
  • في University of Maryland
  • ديسمبر 2005

in

بكالوريوس, Civil Engineering
  • في University of Engineering & Technology
  • يناير 2000

in

Specialties & Skills

DATA ANALYSIS
ENGINEERING
INTERPRETATION
MICROSOFT OFFICE
MICROSOFT WORKS
MODELING
PROGRESS
PROPOSAL WRITING
QUALITY CONTROL