Muhammad khan,

Muhammad khan

Qatar Rail

Location
Qatar - Doha
Education
Bachelor's degree, Engineering and Technology
Experience
13 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 4 Months

at Qatar Rail
  • Qatar
  • February 2015 to December 2015

Project Green line elevated Metro rail Qatar
As a civil site Engineer to follow and supervision of pier footing, and supper structure works. Arranging all required material for sub- contractor and supervision of works as per shop drawing and following the method of statement for site works. Pouring of concrete works at super structure and column. Supervision of all concrete works at site and arranging concrete from the plant to site. Temporary works inspection and paper works records are also in my responsibility, supervision of concrete Repair works for all structure works.

senior civil Engineer
  • October 2013 to September 2014

PROJECT PRESIDENTAL PALACE PROJECT AND CONFRENCE CENTER

Libreville, GABON CENTRAL AFRICA

PROJECT HARMAIN HIGH SPEED RAIL PROJECT at MADINA STATION
  • May 2012 to June 2013

As a senior civil engineer with yapi merkezi I have supervised the following works, concourse building related all structure works construction of columns slabs and beams. And also supervision of long stay car park building, plate forms station slabs wall and hollow core slab fixing and concreting, pouring of screeds concrete over slab. Submitting RFI to consultant and checking of site with consultant engineers and inspectors and taking approval, All site responsibility and man power distribution for the site were also on my shoulders. Attending daily meetings for progress and planning for the progress with high management.

Site Engineer at SHAH ZAMAN CONSTRUCTION PVT.LTD
  • Pakistan
  • September 2004 to November 2005

As Site Engineer I was responsible to finalize the following jobs/responsibilities. Supervision of paving aggregate material, sub base material and asphalt works, submission, inspection and approval of the site work with the consultants. Preparation of daily, weekly and monthly progress of the site works.
Regularl attending of the planning meeting to organize our site.
Supervision of paving and lying works at the site

HIGH WAY ENGINEER at DESIGNATION;
  • December 2002 to April 2003

As Site Engineer + Section Chief I was responsible to finalize the following jobs/responsibilities
Supervision of paving aggregate material, sub material and asphalt works. Submission, inspection and approval of the site work with the consultants. Preparation of daily, weekly and monthly progress of the site works.
Regularly attending of the planning meeting to organize our site.
Supervision of paving and lying works at the site

Civil Engineer at STFA Construction
  • Pakistan
  • December 1998 to December 2002

Turkish multinational) - Pakistan
Project: PHLC (Pehur high level Canal Tarbell Dam

High Way Engineer at RESPONSIBILITES
  • September 1994 to December 1997

As Site Engineer + I was responsible to finalize the following jobs/responsibilities
Supervision of paving aggregate material, sub material and asphalt works. Submission, inspection and approval of the site work with the consultants. Preparation of daily, weekly and monthly progress of the site works.
Regularly attending of the planning meeting to organize our site.
Supervision of paving and lying works at the site

Site Engineer at Designation;
  • March 1992 to May 1993

I worked with senior's engineer of CPECC Company. during this period I have supervise the culverts concrete up to 1to 6 panels, stone pitching works plus supervision of batching plant and shifting of concrete to site.
Supervision of Asphalt at different location.
Distribution of machinery and manpower to the site.
Submission of daily, weekly and monthly progress of the site works.

  • January 1992 to

Total Experience: 21 years
Gulf Experience: 09 years
Pakistan Experience: 12 years
Key Experience
I have been involved in the civil construction in different fields in both consultant and contractors since

Project Engineer at STFA-POLAT - J.V
  • to

in NED al SHEBA.50 km internal roads
Supervision of drainage line 4km and sewerage line including construction of chambers.
Supervision of electrical cables and fixing of electric pools, replacement of foundations.
Supervision of roads such as widening of road, car parking as per RTA standard, lying of ducts earth work. i.e. cut & fill, lying of sub base, road base and asphalts works
Paving aggregate material, sub-base material and asphalt works submission, inspection and approval of the site work with the consultants. Preparation of daily, weekly and monthly progress report for the site works. Regularly attending of the planning meeting to organize our site supervision of paving and laying works at the site.
Method of statement for the above works and monthly preparation of planning program to the company's engineers and all the responsibilities delivered to the site at the same time submitting RFI's and inspecting with consultant were also on my shoulders.
Working as project Engineer , I have worked on project of CW119-DEWA Project, water line dia 1.2m total length 16 km, laying of pipe (Gre) excavation for waterline and construction of manholes, fixing of valve, air valves, electrical services main holes for waterline. Back filling of waterline inspection and submitting shop drawings for the site work weekly and monthly meeting attend with Dubai electrical and water authority with ITAL consultant.

at STFA Construction
  • to

Turkish multinational) - Pakistan
62 km highway section 12b N55 Indus highway project.

Education

Bachelor's degree, Engineering and Technology
  • at Preston University Pakistan
Bachelor's degree, Civil Engineering

Skype ıd akramabreen NOC available/ Qualification

Specialties & Skills

CONSULTING
CUSTOMER RELATIONS
ENGINEERING
MEETING FACILITATION
MICROSOFT WORKS
PROGRESS
SUPERVISORY SKILLS

Languages

Turkish
Expert
English
Expert