Selection and Data sheets, TBE and V-Doc Review, Hydraulic and Stress analyses of Water Pumping and Piping systems
DS, MR, TBE and V-Doc review for piping, valves, HCVs, headers, Filters, and fittings
Preparation of detailed design, basic engineering and conceptual engineering related to Fire Fighting Pump station, UGWT Package
Incorporate International standards, local regulatory requirements, industry best practices into the engineering design
Software based design, modelling and review of Plumbing and Fire-fighting piping
Review and approval of the project design related to design package for DBSP, FEED and detailed design phase
Mechanical man-hour estimates and manpower planning for all phases of the Project
Liaison with client discipline representatives to establish technical direction where not provided by codes and standards
Identification and evaluation of technology developments in providing cost-effective facilities
Short-range, long-range planning and decisions on engineering policies and procedures
Cost reduction and productivity enhancing initiatives
Liaison with other discipline Principal engineers on technical issues and engineering matters
Liaison with other engineers and discipline groups on the contract to effect timely production of deliverables
Expert advice and support to the relevant Principal Engineer
Major Projects:
CLIENT| Projects Description
WAPDA|Design and Engineering of K4 water pumping station
Scope: Layouts, piping, valves, pump selection, Hydraulic and Stress analyses, Material Handling study, on-site verification, liaison with civil structures
WAPDA| Water Supply network design and detailing of Mohmend-Dam
Scope: Demand calculations, layouts, Penstock piping, valves, pump selection, Hydraulic and Stress analyses, Material Handling study, on-site verification, liaison with civil structures
SABIC | Safety Showers fire fighting water circulation system Engineering
Scope: Design and calculations of piping, storage and pumping requirement
JGC | Produced water tanks and pumping systems
Scope: Piping and Pumping selection and analysis
ODICO-SABIC| Replacement of Single Mechanical Seals with Plan 53B Double Mechanical seals
PA-CHEM GLOBAL| Designed and Detailed and Commissioned Demin water and Fire water networks
Complete water circuit design and selection of Pumps and Steam Turbine retrofitting
Designed and detailed Pumping stations/ Fire-fighting network of fueling stations
Made bid-winning proposals for mechanical discipline of the company
Engineering estimates for new projects and associated with ongoing projects change management
Quality Assurance - Responsible for working within the provisions and guidelines of the Quality Assurance system
Safety - Responsible for safe designing practices. Understand and follow HSE best practices.
Engineering of projects as per API 610, 614, 617, 618, 619, 685 & 682, NFPA 20 and OGRA standards
Designed and detailed Pumping stations/ Fire-fighting equipment of oil depots and fueling stations
Designed and detailed Truck Skid Mounted equipment as per ADR standard and OGRA guidelines
Designed piping networks; Product, Lube, Water, and Fire water piping of Oil Depots and Fueling stations as per API-5L and NFPA; and valves specifications as per API-600/6D
Designed and detailed Fuel/Water Storages Tank as per API-650/653 and API-620
Designed and detailed horizontal Fuel Tanks as per ASME Sec-VIII Division-1
Made bid-winning proposals for mechanical equipment for the company
Cost-estimation and preparation of mechanical proposals for bidding purpose
Guided the teams for preparation of QC & HSE documents of the projects
Prepared documentations for Oil and Gas Regulatory Authority, Pakistan and assisted manager in clearing the Third Party Audit
Engineering estimates for new projects and associated with ongoing projects change management
Quality Assurance - Responsible for working within the provisions and guidelines of the Quality Assurance system
Safety - Responsible for personal safety safe working practices. Understand and follow OH&S procedures.
Major Projects:
Major Projects:
Urban planning and water distribution network design of 500 Acre Society in Faisalabad
Waste water treatment plant of the Service stations of 25 stations
Designed and optimized water Turbine and Firewater Pumps and all Piping of HUB Terminal Project
Designed and optimized water Turbine and Firewater Pumps and all Piping of Mirpur Khas Depot
Designed and optimized water Turbine and Firewater Pumps and all Piping of Sahiwal Depot
Designed and optimized water Turbine and Firewater Pumps and all Piping, and Tanks storage of Mehmoodkot terminal by GnO Project
Optimized BKR Oil Storage Depot Project and increased capacity by 2, 095 M³ amidst half erected depot by previous designer
Made and won Anchor Point Project Proposal from ‘Shell Petroleum’ 17 Million PKR
Made and won complete oil depot project proposal from ‘Taj Petroleum’ 350 Million PKR
Made and won “Pipeline Project” Proposal from ‘Attock Petroleum Limited’ worth 170 Million PKR
Complete proposal and planning, execution for ‘PAPCO--White Oil Project’
Selected Centrifugal Pumping station for open-top water reservoir for utility water
FEED and DEP of Kitchen waste water re-utilization as Crop-Feed project
In Plant CAPEX AND OPEX Report Preparation
Completed maintenance of RO Plant and make-up water piping and plumbing
Hands on participation in Steam Turbine (8-9MC-6) all inspections and major overhaul maintenance of (Steam Casing, Rotor/Stators, DE/NDE Bearings, Main Control/Trip Valves, Coupling Alignment, Main Steam/Gland
Installed and commissioned Cyclone separator, Steam Silencer and Turbocharger up-gradation
Managing the spare parts inventory at optimum level to minimize the downtime
Reduction in R&M Cost and Maintenance Report Preparation
Completed maintenance of RO Plant, PHEs, feed pumps and starting air compressors
Shutdown maintenance of HRSGs, vent valves, auxiliary boiler and auxiliary steam system
Breakdown maintenance of Governor valve, trip valves and Bypass station
Planning and performing of troubleshooting, planned/unplanned maintenances and overhauling of equipment like Steam Turbine (GE), HFO Engines (Wartsila), Turbochargers (ABB), Oil Purifiers (Alfa Laval), Compressors and a large variety of Pumps.
Technical support of Rotary and HVAC machinery design and improvement projects to increase the EE and OEE of the machinery
Performance Improvement of the packaging plant
Commissioning of various Reciprocating and Centrifugal Pumps and Compressors
Designed and commissioned Improvement Projects to reduce the MTTR(Mean Time To Repair) and increase the MTBF (mean Time Between Failure) of the Chemical Processing plant
Assisted the Managers in preparation of the CAPEX (Capital Expenditure Budget) to accomplish following years technical and business improvement targets
Identified, designed and executed improvement projects for production lines including up gradation of new parts and procedures to streamline production
Designed and installed wax recovery unit on waxing machine to recover wax fumes to save operative cost
Successfully applied and audited ISO-9001 Quality Management System in my department and underlay machines and achieved Zero NCs in external audit by SGS
Became President of ASHRAE UET and Won “Best Branch in Pakistan Award” Became Chair of ASME UET, and completed 11 Projects Winner of 5 National Project Competitions Aired programs on Samaa TV, Express NEWS & Dawn NEWS