Senior Process Engineer في SIPET Engineering & Consultancy
  • جنوب السودان - Juba
  • أشغل هذه الوظيفة منذ أكتوبر 2019

Production & Facilities Projects PMC of DAR PETROLEUM OPERATING COMPANY DPOC

في GASCO Engineering (Pvt.) Ltd
  • باكستان
  • أبريل 2019 إلى أكتوبر 2019
في Descon Engineering Services & Technology
  • باكستان
  • مارس 2017 إلى أبريل 2019

DESTL is operating as engineering consultants for the major Oil & Gas, Refineries, Chemicals manufacturing and Petrochemicals clients like UEP, ICI, NRL, PRL etc. DESTL has also held the position as the design house for UEPL (former BP Pakistan) for over 10 years; which operates with over 300 wells and more than 12 oil and gas processing facilities. (descon.com

Project Support Engineer في United Energy Pakistan
  • باكستان
  • أكتوبر 2017 إلى مارس 2018

UEP is a subsidiary of United Energy Group (UEG) assumed control of oil and gas exploration and production assets managed by BP Pakistan in September, 2011. *: Contract/Deputation.
Deputed at UEP Head Office, Karachi (as an employee of DEST-L) on special assignment to support Engineering Services department of UEP.
RESPOSIBILITIES & ACHIEVEMENT:
•Review of process discipline deliverables from Design House (PFDs, P&IDs, calculation & hydraulic etc.)
•Ensuring deliverables are comprehensive, on time and consistent with quality standards of UEP
•Participation in Engineering design review, HAZOP studies, constructability reviews, Risk Assessment Studies, Process Safety Reviews & Incident Investigation
•Providing support to construction and commissioning teams along with conceptual studies for production enhancement, oil & water handling & various site modification for operational ease
•Completed 70 engineering requests raised by operation from installation of new wellheads to major facility modification by considering minimum downtime to avoid production loss
•Completed 4 major facility upgrade project including unmanning, water network upgradation, compressor installation & standardization of early testing/production facility along with wellheads

Process/ Project Engineer في COC Engineering
  • المملكة العربية السعودية
  • مارس 2016 إلى مارس 2017

Technical and commercial activities for oil & gas sector & major process industries (cocengg.com) in Jubail, KSA. This firm is associated with engineering works related to shutdown, maintenance, modifications & debottlenecking assessment at live plants.

في Olayan Descon Engineering Company ltd
  • أغسطس 2013 إلى مارس 2016

JV of Olayan group & Descon Engineering for Engineering & Fabrication of static equipment's. (olayandescon.com

Process Design Engineer
  • باكستان
  • ديسمبر 2011 إلى أغسطس 2013

Line Sizing and Pressure Drop Calculations of Gas, Liquid and 2-Phase Lines
•Design & Rating of Columns, Compressors, Heat Exchangers, Air Coolers, Two and Three Phase Separators,
•Design of Shell & Tube heat exchanger using TEMA 9th edition, SABIC & SAUDI ARAMCO specification
Accomplishments
•Successfully completed 4 major projects by utilizing 78% of allocated man-hours
•Formulated API 2000 excel sheet for breathing valves sizing & rating to elude cost of 3rd party verification of calculation consequential of overall saving of 17, 500$ for 350 breathing valves
•Carried out thermal design & rating of 120 Heat exchangers utilizing 67% of allocated man-hours to aid completion of mechanical fabrication drawings in Jazan Refinery and Terminal Project (Saudi Aramco)
Major Projects
•Jazan Refinery and Terminal Project (Saudi Aramco)
•Rating of 140 tanks/vessel based on API 620 & 650 with breathing calc. - SADARA Chemicals III Project
•Design of API 650 Storage Tanks for SABIC PETROKEMYA:
AL-TUWAIRQI HOLDING (TSML Engineering

Shift In charge/ Production Engineer في THATTA CEMENT COMPANY LIMITED
  • باكستان
  • يونيو 2011 إلى ديسمبر 2011

Responsible for supervision of activities from quarry to production of clinker and preparation of cement as per standards
•Maintaining shift log register & updating plant manager with production report twice in shift
Accomplishments
•In planned shutdowns, initiated an investigation on the basis of noise & vibration in raw mill section. Production increased to 13% by adding the 19% calculated weight in 2nd chamber of raw mill.
•During normal inspection a temperature anomaly was identified, an immediate action to stop kiln was called by me to avoid whole refractory rupture and suggested early start of annual shutdown.

الخلفية التعليمية

بكالوريوس, Chemical Engineering
  • في University Of Karachi
  • يناير 2010

courses: Short Course/Certification

Specialties & Skills

Detail Design
Risk Assessment
Process Simulation

اللغات

الانجليزية
متمرّس
العربية
مبتدئ
الأوردو
اللغة الأم

العضويات

Pakistan Engineering Council
  • Registered Engineer
  • May 2011

الهوايات

  • table tennis