Addl. Dy. Manager(P&D)
LESCO/wapda
مجموع سنوات الخبرة :14 years, 8 أشهر
Electrical Transmission system and its interconnection studies in PSSE software. (Load flow, Short circuit, transient stability studies).
Load flow studies & interconnection of renewable energy power plants with the Distribution System on the SynerGi Electric Software.
Lead Engineer for the on-going Net Metering and Renewable Energy projects.
Planning and Design of distribution network.
Preparation of BOQs and cost estimation of planned network along with its cost evaluation.
Digitization of complete electrical distribution network on Graphical information system (GIS)
Supervision of solar systems installed in various locations under LESCO to verify their proper installation as per design and specification.
Completed tender evaluation of GPS enabled Meter enabled AMR (Automatic Meter reading) infrastructure in LESCO.
Capable of handling design review and evaluation of project Technical proposals, detailed designs, and calculations submitted by Consultants /contractors for different 132/ 11 KV Substation and transmission Projects.
Lead for the on-going Net Metering and Renewable Energy projects.
Completed tender evaluation of GPS enabled Meter enabled AMR (Automatic Meter reading) infrastructure in LESCO
Additional Experience in preparation of Tender documents and evaluation of Tenders for AMI/ SACADA
Completed the project of Outage reduction devices (ORD) in coordination with the USAID.
Completion of Load Data Improvement (LDI) project for the online reading of total load Demand and supply of DISCOs.
Load flows Study and interconnectivity of small solar & hydropower projects on PSSE.
Dynamic stability of the system using power Simulink module of Matlab Software.
● Responsible for the installation & Inspection of electrical distribution network.
● Reviewed drawings and proposed modifications as per requirement of project, site or field formation.
● Installation of LV lines and their Cable termination.
● Monitor the progress of the project and adopt various measures to increase efficiency.
● Preparation of estimate for distribution LT&HT lines
● Management and Supervision of work executed by of Labors or contractor
● Supervised the work executed by the Supervision of labor charges &overheads to keep them in permissible limit
● Arrangement of material for the execution of work
Design of distribution transformer (25kVA, 50 kVA, 100 kVA, 200 kVA, 400 kVA, 630kVA)
Fallow up Testing of transformers
Routine testing
Special testing
Type testing
The overall % throughout Engineering is 75%.