Field technician
ZTE PAKISTAN
Total years of experience :15 years, 9 Months
ZTE PAKISTAN (EXTERNAL CONTRACT) (July 2011-14-03-2013)
TELENOR PAKISTAN O & M PROJECT
Currently working as FLM (First Line Maintenance) Field technician with ZTE on
Telenor Pakistan MS project, my job responsibilities are
• System Installation, commissioning and testing of BTS Ultra BTS & Flexi BTS. MiniUltra BTS Metro sites and ZTE SDR BTS.
• Installation and Commissioning Power one Rectifier System. And Saltec rectifier system
• Handling All types of Quality Alarms all External Alarms
• Site Health Test includes
• Check orientation check synchronization
• Antenna Watt power
• Check VSWR
• Handover Drive Test Commissioning of BTS
• Software Loading, Troubleshooting and Maintenance of Nokia Microwave Links
• BSS Expansion
• Traffic Shifting Activates from NOKIA to NEC Equipment.
• Troubleshooting of Transcoder.TC2E Nokia.
• Nokia BSC DDF cleanup Activities at different BSCs
• All types of power installation and troubleshooting .
NSN PAKISTAN: (January 2005 TO July 2011)
NOKIA SIEMANS NETWORKS TELENOR PAKISTAN O & M PROJECT
Position: FLM Technician in Operation & maintenance
JOB Responsibilities:
• Perform routine activities for Operational Support
• Field work and co-ordination of the following activities in Telenor Pakistan consisting of Ultra BTS, Flexi BTS, Metro BTS Sites.
• First Line Maintenance of BTS and PDH links of Ex Nokia products
• Onsite diagnostic checks and fault rectification.
• Carried out intensive expansions of sites throughout the Network to increase the net work capacity
• PM (Preventive Maintenance) and trouble shooting of GSM & Microwave equipment
• PM (Preventive Maintenance) and CM (Corrective Maintenance) of all power equipment including ATS/AMF panels
• Replacement of faulty BTS cabinets and faulty rectifier cabinets
• Handling all sorts of connectors
• Battery bank issues and faulty Battery banks replacement
• Replacement of faulty Breaker faulty back plain and faulty module etc
• BTS and Generator PM Audit and Alarms Rectification
MOTOROLA PAKISTAN .
MOBILINK PAKISTAN BSS AND O&M PROJECT 1 July 1997 to 24 January 2005
Position: Senior Technician in Motorola Pakistan Lahore
JOB Responsibilities:
◙: Installation of over 1000 Cellular sites in different regions of Pakistan for
Motorola GSM 900 Network
The site Installed in clued IN-CELL.M-CELL. Horizon Macro.Maicro and Horizon Macro Cellular sites
• All sites were installed according to Motorola Standards and specification
• Installation and power up of BSC and RXCDR cabinets in BSS room
• Carried out intensive expansions of sites throughout the Network to increase
Network capacity
• Relocation and Dismantling of BTS sites upon the customer request
• Replacement of faulty BTS cabinet and faulty rectifier cabinet
• Relocation of BSC and RXCDR cabinets upon the customer request
• Handling all sorts of connectors
• PM OF BTS and BSE sites Operation & maintenance of Generators
• Resolve reflection issues LDF cables and BTS Jumpers
• Resolve False Alarms issue due to problem'in DDF panel
• Issues due to rectifier and rectifier modules
• Battery bank issues and faulty Battery banks replacement
• Replacement of faulty Barker faulty back plain and faulty module etc
Metric (Science): Board of Intermediate and Secondary Education. Lahore FA .Board of Intermediate and Secondary Education. LahoreBord