1. ICI SODA ASH PAKISTAN POWER PLANT
Erection and commissioning of HTC Steam Turbine 18 M.W and CoalFire Boiler’s 80 T/h (2 no’s), DCS
System S7 /400.
Commissioning of Coal based Power plant of 18 MW.
Work on steam turbine governor system (Woodward).
(power plant) 06.06.2016 Continue…
Instrument and Control
performed duty in shift. I worked on Raw
Mill, Cement Mill, Kiln Cooler and Packing Plant areas in commissioning and Production days.
5. Zaman Cement Company Ltd Khoshab
Shift dutyPreformedasanInstrumentTechnician.Iworkedonanytroubleshooting inRawMill,
Cement Mill, Kiln Coolerareas.
6. Maintenance and Operation
* Responsible for developing, managing and maintaining, troubleshooting, equipment, which is
used to monitor and control the systems, machinery and processes. The main objective is to
ensure that these systems and processes operate effectively, efficiently and safely.
* Responsible for the budget, spare availability and Indents of the instrument & automation
equipment is for all over the plant.
* Responsible for arrangement duties of staff in shift and general maintenance.
* Responsible to fallow all planning jobs as preventive maintenance.
* Gas Analyzers for CO & O2 by ABB (URAS 26, MAGNOS 17), Siemens (Ultra mate 23).
* Responsible for calibration and maintenance of weighing instrument belt weighs, Weigh
Feeders, Solid Flow Meter by Scheck. Configuration of Scheck system using easy serve
&Pfister Rotor Weigh Feeder.
* Configuration of Transmitter and Controller.
* Control valves, Motorize Actuators, Butterfly, and Shutoff, valves.
* Preventive Maintenance, Trouble Shooting, and Calibration, of all kind of instruments such as;
a) Temperature instruments Thermocouples, RTD (Pt100, Pt 120, and Cu 50),
Thermometers, Radiation Pyrometer, Shell Scanner, and Temperature
Transmitters. Temperature Switches.
(