SCCT is Maersk container terminal, which build at Suez Canal, my role was receive and install terminal’s equipment
Duties
x Responsible for installing, establishing, and managing maintenance system and procedures. For below equipment:
o STS
o RTG
o Generators
o Substations
o Trucks
Achievements
• Engineering and Project Manager to deliver process and analyzers systems Marjan increment program Package 6 &12, Jan 2021 - October 2022, 5Millions $ .
• Sales support during bidding & engineering and Project Manager during Project execution phase for suppling water / industrial wastewater quality management systems, SCADA, control systems, BMS, wide range of instrumentations devices for SPARK - King Salman Energy Park, Nov 2019 - Jan 2022 ( 20 Million $ )
• Sales development manager for suppling The General Authority for Metrology and Environmental Protection in The Kingdom of Saudi Establishment of a Central Unit to Monitor Air Quality and Emissions in whole Of KSA ( 25 Million $ ) (Under bidding) .
• Project and engineering Manager. Building 6 analyzer Shelter Hyundai /Aramco, in Uthmaniyah, ETHANE DEEP RECOVERY FACILITY PROJECT (EDRF) STEAM TURBINE GENERATOR (STG), April 2017 - February 2020, ( 5 Million $ ).
• Project and operations Manager. Building 1 analyzer Shelter Yasref /Aramco, in Yanbu, YNGL, May 2018 to May 2019, (1.5 Million $).
• Project and operations Manager. Building 18 control cabinet Petroserve / ARAMCO Jan 2019 - July 2020, (1.5 Million $).
• ( pre-sales support, Planner and automation panel assembler advisor ) Riyadh Metro Project Lines 4, 5, 6 with Alstom, design resolve Technical Issues and assemble, 200 panels to control and monitor the power substation of Riyadh Metro. 2.5 million $ (January 2016, January 2018)
• Project management for assembling & testing 16 GCs PGC 5000” with their Sampling systems ARAMCO RASTUNRA terminal, 3 Million $ (January 2016, March 2017).
• Project management and engineering for Building 3*3 analyzer shelter, (ARAMCO &Dodsal), 56`` EWG-2 Section III Sales Gas Pipeline (MGS PH-I) (1.6 Million $) (2015)
• Project management and engineering for 3*3 analyzer shelter, ARAMCO, 30” EWECG-1 Sales Gas Pipeline, 1.3 Million $ (2016)
• Project management and engineering for Building 3*4 analyzer shelter, (ARAMCO & SEPCO), MASTER GAS SYSTEM EXPANSION PHASE 2 COMPRESSION with budget 1.4 Million $ (January 2017- August 2017)
• Project management & Engineering Installation of new cloud point analyzer for diesel blending system and updating the control system (Rockwell control logix) for” Saudi Aramco Total Refining and Petrochemicals with 1.2 million $ (July 2016).
• (project management and engineering) Upgrade a vibration monitoring system on 20 turbine To Meggitt VM-600, Power Plant -08 (May 2016- May 2018).
• Engineering & Manage Building Manufacturing facility inside ISG to fabricate MEGGITT vibration monitoring systems Rack VM600 for Middle East region projects (Oct 2014 -Jan 2015)
• Registering ISG factory to be in ARAMCO approved vendor list under 9com # 6000002898 for building analyzer shelter & sampling, by compiling with standard SAES-J-502 and related matters (2014)
• Engineering, designing, determine specification and Building a Demo &Prototype module as a complete Solution for vibration monitoring system (vibration panel + rotor Kit). (March 2015-April 2015)
• Engineering, designing and Building a Demo & Prototype module as a complete solution for cathodic protection motoring system. (May 2015 - July 2015)
• Registering ISG factory to be in ARAMCO approved vendor list under 9com # 6000013922 for building automation Panel by compiling with standard 34-SAMSS-820 (2019- ongoing)
• Registering ISG factory to be in ARAMCO approved vendor list under 9com # 6000013781 & #6000002796 for building Vibration Panel by compiling with standard 34-SAMSS-625 (2019-ongoing)
- مجال الشركة:
- خدمات الدعم التجاري الأخرى
- الدور الوظيفي:
-
الصيانة والإصلاح والدعم الفني