MUHAMMAD TAHIR, Power Supply  Engineer

MUHAMMAD TAHIR

Power Supply Engineer

Alstom

Lieu
Arabie Saoudite
Éducation
Baccalauréat, Electronics Engineering
Expérience
14 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 8 Mois

Power Supply Engineer à Alstom
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis mai 2018

Preparing Test reports and Progress reports.
• Preparing & raising NCR, TRR, TNF & Punch-lists.
• Preparing Testing procedures, Schedules, Plans and handover documents.
• Attending meetings for inter-departmental issues and work progress.
• Planning, managing & supervising teams & subcontractor for site activities.
• Coordination with Installation and OPC teams for technical room readiness as per requirements and standards.
• Coordination with QA/QC teams for equipment FAT & compliance with QMS.
• Coordination with TO for Technical rooms handover, permits & power issues.
• Coordination with system for the integration of power rooms at SCADA level.
• Coordination with SLV and System teams for interface work.
• Coordination with Design team for design issues and As-built.
• Monitoring, tracking and solving Power Supply technical issues.
• Managing tools (color coding, calibration, reallocation etc.) as per EHS rule.
• Carrying out site inspections for work and EHS implementations as per plans.
• LOTO(Lock Out Tag Out) for isolation of High Voltages as per EHS requirements.
• Performing T&C activities as per approved SAT/SIT & EHS procedures.
• Hazard Identification, Risk Assessment and Evaluation for site activities.
• Installation, Testing & Commissioning of MV and LV equipment for Passage Post(PP), Traction Power Substation(TPS), Lighting Power Substation(LPS) and Depot Tractions System.
• Installation, Testing & Commissioning of 33KV MV Switchgears(GIS & AIS), Auxiliary Transformers, Traction Transformers, Harmonic and Energy Saving Optimizer (HESOP) 750 VDC convertor, Traction Protection Board(DC Switchgear), Secure Low Voltage Distribution board (SLVDB), Secure auxiliary Battery Charger (SABC), Marshalling Cabinet(MC), Control Command Cubicle(ACC), Stinger panel (STIP), Stabling panel (STAP), Depot Coupling Switch (DCS), Washing plant Isolating Switch (WPS), Test Track Switch(TTS), Remote Lockout System (RLS), Emergency Tripping System (ETS).

Electrical Engineer à United National Electromechanical Co
  • Arabie Saoudite - Riyad
  • novembre 2016 à avril 2018

• Design implementation for installation, testing & commissioning of Fire Alarm Detection and Suppression System, HVAC and LV distribution system.
• Site survey and request necessary changes in design as per site condition.
• Submitting and follow up of submittals, NCR, IR.
• Permit issueing and access for site activites.
• Material Selection and calculation for the Site as per drawing requirements.
• Inspection with client.
• Coordinating other departments for conflicting work.
• Managing Manpower for the assigned site work as per approved drawings.
• Safety assurance through Site Observation Tour (SOT)and Tool Box Talk (TBT).
• Interfacing of fire alarm detection and suppression system.
• Pre-PAT and PAT Procedure.
• Preparation of As-Built for site.
• Preparing progress reports.
• Diagnosing Systems Failures, Breakdown Problems, and Plan Professional Solutions.

Electrical Engineer à Morsalah International Co
  • Arabie Saoudite - Riyad
  • avril 2012 à octobre 2016

• Preparing, submitting and reviewing technical Submittal, Sample Inspection Request(SIR), Material Inspections requests (MIR), Work Inspection Request (WIR) or RFI, site change request (SCR), Inspection Test Plan (ITP) & Method Statement.
• Coordinating for SIR, MIR, WIR and SCR approval.
• Coordinating with installation / project engineers, supervised engineering and technical staff and developed cable schedules, reports, drawings and documentation.
• Coordination with civil, mechanical & other disciplines people on site for design implementation as per approved shop drawings and design changes.
• Performing SAT, FAT and PAT procedures.
• Preparation Red Line for as Built drawings.
• Preparing punch-lists, loop Checking reports. weekly & monthly progress reports.
• Plaining wok activities for all sites, managing materials, manpower, equimpent’s and solving all issue with contractor and consultant.
• Issuing work Permit
• Supervising teams for the completion of work efficiently to keep project on schedule.
• Installation, energizing and Testing as per Method statement and ITP.
• Implementation of Shop Drawing for lighting, power outlets, low current, earthing and MV system installation.
• Performing installation and pre commissioning 2x27.5KV MV (Sectional Post, Paralleling post, Feder Station) substations for 25KV AC overhead rail electrification.
• Installation and pre commissioning of 2x27.5KV MV switchgear(GIS), 33KV MV RMU, autotransformer, auxiliary transformer, control panels, auxiliary distribution board, rectifier, telecom panels, HVAC control panel, fire alarm system.
• Installation and T&C of gantries, disconnectorsand motor operating devices for Rails electrification.
• Installation & Pre commissioning of SCADA & DCS System ( ABB 800XA ) RTU’s, PLC, Switching, vServer & Telecom Panels.

Trainee E & I Engineer à Bestway Cement Limited
  • Pakistan
  • septembre 2009 à février 2012

• Job Assignment was to monitor and precautionary and corrective maintenance of instruments of cement plant.
• Troubleshooting of Electrical Fault, Maintenance of electrical Equipment’s, Inspection.
• Perform responsibilities of analyzing complex engineering problems and offer solutions for the same.
• Installation/commissioning of faulty electrical equipment’s, sensors and their interface with DCS system.
• Working with MDBs and other electrical switch boards.
• Ensure working condition and safety work.
• Testing of Cables.

Éducation

Baccalauréat, Electronics Engineering
  • à NWFP University Of Engineering & Technology Peshawar
  • décembre 2009

CGPA 3.07 4 Month Internship in PTCL Pakistan

Specialties & Skills

Electric Power
Site Engineering
AutoCAD
Project Work
MS Office tools
Assembly Language
AutoCad
Proteus
MS Word
MS Excel
Team lead

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Urdu
Expert
Anglais
Expert
Arabe
Moyen
Hindi
Moyen
Punjabi
Moyen

Adhésions

Saudi Council of Engineer
  • Member
  • February 2016

Formation et Diplômes

Project Management Professional (PMP) (Certificat)
Date de la formation:
November 2022
Valide jusqu'à:
November 2025
ISO 9001:2015 Lead Auditor (Certificat)
Date de la formation:
October 2022
Saudi Council of Engineers membership (Certificat)
Date de la formation:
February 2016
Valide jusqu'à:
February 2023