muhammad tariq, Supervisor Electrical

muhammad tariq

Supervisor Electrical

Weir oil gas Solution at lukoil west qurna 2 basra iraq

Location
Pakistan - Multan
Education
Bachelor's degree, Electrical
Experience
22 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :22 years, 4 Months

Supervisor Electrical at Weir oil gas Solution at lukoil west qurna 2 basra iraq
  • Iraq - Basra
  • My current job since September 2014

• Authorized PTW system, Corrective & preventive maintenance, Visual inspection, Yearly preventive maintenance experience and good diagnosing / troubleshooting command on following equipment’s in accordance to work order and method statement.
• MV & LV switchgear, MCC, ACB, VCB, MCB, Contactors, (LTMR, Sepam, ABB, Schneider Electric), function test, VCB contacts test by low ohmmeter, testing of mechanical mechanism of VCB Charging / Discharging, Rack-in /Rack-out by SCHNEIDER Electric, ABB Egypt, HYUNDAI,
• MV/LV - Transformers, De-salter transformers, Dry type transformers by (0.42KV, 6.6KV, 11KV, 33KV), Oil sampling, changing of silica Gel, oil sampling, oil replacement bushing for de-salter transformers, Transformer WR/IR test, Function test by ABB, ILJIN, SCHNEIDER Electric, NEELTRAN,
• MV/LV - MOTORS, Solo run test, WR / IR testing, bearing replacement, greasing,
• AC UPS & DC UPS by GUTOR Schneider Electric Ltd, batteries voltage & Impedance test, termination & tightness of battery terminals, battery load discharge test TORKEL by Megger,
• Plant Earthing & Lightening Protection system, testing of earthing resistance & continuity test by low ohm meter for
(Dirty & clean earth),

Superintendent Electrical at Presson Descon International Pvt Ltd at Mol Pakistan Oil & Gas Co. B.V
  • Pakistan - Peshawar
  • May 2008 to September 2014

Authorized PTW system,
Establish and maintain timely completion of Electrical activities as per project timelines.
Close Coordination with vendor/supplier regarding electrical equipment spares and services,
Performing safe Operation and maintenance, Corrective & Preventive maintenance, troubleshooting command on power and control circuits till performance test and hand over to client with satisfactory plant startup,
Closeout punch list and technical issues before performance test.
Installation, modification, tie in, testing, pre-commissioning, commissioning experience on the following equipments.
• MV & LV switchgear (150 Feeders & MCC) Make: Schneider Electric,
• LV switchgear of ABB Egypt and HVAC system Make: Denim Bush, Captive air.
• Induction motors and Local control stations
• AC UPS (80KVA & 30KVA), DC UPS (32KW) Make: GUTOR and DC UPS 5.5KW, 30KW by GUTOR Electric Ltd
• Variable Frequency Drives of Schneider Electric, model Altivar 71, low voltage motors up to 300 HP.
• Transformers 4.5 MVA each Make: ABB, 1500MVA, 2000KVA, 750KVA and Isolation dry type transformers. Make: Schneider Electric
• (NGR) Neutral Ground resistance by TECSYSTEM & H.T.ELEMA,
• Load Bank 2.6MW Make: Avitron,
• Meggering / continuity test for 3x3000 & 3x6300 Amps BTD of Henycon & Siemens.

• Installation of Fire water motor Driven soft starter (325 KW) Cutler hammer, (AMF- ATS) panels,
• Plant Earthing & Lightening Protection system
• Installation, testing, and pre-commissioning of Cathodic Protection System (Impressed current & sacrificial Anode) for LPG Bullets, Oil condensate tanks, fire water tanks & buried pipelines.
• Load Bank 2.6MW by Avitron, Model LSV 2600
• Earthing resistance test for (Dirty & clean earth) and also Lightening Protection system
• Testing of Earthing contacts by Insulation test resistor / low ohmmeter
• Daily Routine test of Black start Generator ON load and OFF load,
• Restore the Plant after black shut down
• Maintain Daily Generation & Consumption Reports and maintained LOG Book.

Electrical Shift Engineer at Husain Group of Industries Power Generation (Pvt) Ltd
  • Pakistan - Multan
  • March 2007 to April 2008

Operation and maintenance, Corrective & Preventive maintenance, good diagnosing / troubleshooting command on power and control circuits,
• HV/LV - HFO, GAS & DEISEL GENERATORS
• Synchronization of Gen set by using PLC of Terberg
• Gas Gen sets of (1.1MW, 0.42KV, 50Hz) by Caterpillar (CAT)
• Diesel Generator Model 3406 (365KVA/ 1MW, 415V, 50Hz) by Caterpillar (CAT)
• Megger test for LV Generators, Motors, and power & control cables.
• Maintained the daily generation and consumption report and also maintained the LOG BOOK.

Electrical Supervisor at Descon Engineering
  • Pakistan - Islamabad
  • April 2006 to October 2006

Installation, modification, tie in, testing, pre-commissioning, commissioning of plant lighting system
installation of earthing system
installation and commissioning of LV motors

Electrical Site Engineer at Gulf Engineering Company
  • Pakistan
  • December 2005 to March 2006

Authorized PTW system, Motors overhauling, bearing replacement & greasing, worked at plant shutdown
Testing of plant earthing & Lightening protection
Installation, modification, tie in, testing, pre-commissioning, commissioning of Workshop MCC and Lighting system, Earthing & Lighting protection system

Electrical Supervisor at Mehmood Group of Industries Power Generation (Pvt) Ltd
  • Pakistan - Multan
  • August 2001 to December 2005

Operation and maintenance, Corrective & Preventive maintenance, good diagnosing / troubleshooting command on power and control circuits,
• Synchronization of Gen set by using PLC of Toyo Denky DESK, Enercon and Terberg
• HFO Power plant Niigata Japan (Plant capacity 9.2 MW)
• Gas Plant Caterpillar Gen set 3516-B (Plant capacity 4.44 MW)
• Maintain Daily Generation and Consumption Reports,
• Switch Gears of 11KV, MCC, MCB breaker & Magnetic Contactors,
• Troubleshooting of power plant and MCC Panels, LT Panels & related Auxiliaries,
• Insulation test of Generators, Motor winding and also power & control cables,
• Maintain the D.C Batteries specific gravity and check its Battery charging current.
• Check the Earthing Resistance of Power plant system.
• Daily Routine test of Black start Generator ON load and OFF load,
• Restore the Plant after black shut down

Education

Bachelor's degree, Electrical
  • at Preston University of Pakistan
  • January 2004
Diploma, Electrical
  • at Punjab board lahore
  • January 2002
Diploma, Electrical
  • at Pak Neaderland Technical institute
  • January 1998
High school or equivalent, Science
  • at Secondary Education Board Multan
  • January 1996

Specialties & Skills

Troubleshooting
Commissioning
Facilities
Maintenance Engineering
operations
Operation & maintenance
AC/DC MOTOR
CATERPILLAR
CEMENT PLANT
ENGINEER
FOSSIL POWER
NATURAL
OIL REFINERY
POWER GENERATION
REFINERY

Languages

Urdu
Expert
English
Intermediate