muhammad tayyab, pakistan

muhammad tayyab

pakistan

Zong

Location
Pakistan - Peshawar
Education
Master's degree, Electrical Engineering
Experience
13 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 5 Months

pakistan at Zong
  • Pakistan - Peshawar
  • My current job since September 2013

Engineering Field operations
BSS products:
2G-Alcatel Evolium A9100 & 9110 BTS (Indoor BTS MBI 5 & MBI 3 and Outdoor BTS MBO1 & MBO2). 3G (Alcatel RRH & SUMAX, Node B).
Microwave products:ALCATEL ADM( 1642 EM, 1652, 1662)
Alcatel PDH AWY9400 (up to 32E1s) & SDH 9500 MXC (1-STM1), 9500 MXC INUe (2-STM1). Ericsson 2P, 6P Ericsson mini link classic.
Packet radio (Alcatel-Lucent & Huawei):MPR 9500, RTN 900,
Optics products (Alcatel-Lucent):ADM 1642 EM, 1650 SMC, 1662 SMC,
Power Products:
Huawei FCB (fast charging Batteries) old/new version rectifiers.
Emerson power system old/new version rectifiers.
ZTE Power System ZXD series.
Ensure Onsite support in case of major or critical problems occur in the Network on 24/7 basis ensure the SLA for problem solving.
MPR 9500 Project Leader and level II support on site.
Configuration, NMS connectivity, and O&M of MPR9500.
ALU BTS (9100, RRH) commissioning and troubleshooting
M/W links MPR, AWY, ADM, MXC9500 installation commissioning and Supervision of Media cutover.
TXN data compilation and making complete record of TXN equipment used for O&M.
Coordination and handling of problems that arise during installation at sites.
Scheduling all Provisional and Final acceptance test.
Managing and Supervising of O&M level- 1 on call & Preventive Maintenance / Corrective maintenance activities.
Responsible for maintaining the Network availability targets, resolving complex Hardware/ software problems that affect the network performance & responding directly to Manager BSS O&M Access network
Coordinate with RAN Team for network improvement
DG inspection ranging from 5 KVA to 220 KVA
Transformer maintenance rating from 10 KVA to 75KV
Power issues over more than 50 sites, looking after ACDB, LVDB and ATS panels
Responsible for improving KPI’s consistently
Installation, commissioning and supervision of Fire suppression system at sites.
Installation, commissioning Huawei RTN 910, 905, 950 & 980

Senior Technical Engineer at KCN Telecommunication
  • Pakistan - Peshawar
  • February 2012 to September 2013

Worked as Technical Support Engineer in KCN Telecommunication Pakistan on CM-Pak, Telenor Swap Project, Warid Rollout Project

Key Responsibilities:
1) ALCATEL.
• Installation, commissioning & troubleshooting of MC-RRH.
• Rectify OML, O & M, and low efficient TREs, BSS drops, RTC drops and other issues.
• PAT (Preliminary acceptance test) of expansion sites.
• Alarms patching and their configuration.
• Installation of MPR 9500 links of MSS-1C and MSS8.
• Hot swap of BTS and microwave links of Alcatel-lucent on CM-Pak project.
2) ZTE
At Telenor-ZTE Vega Swap Project
• MW/SDR swap engineer at Grentech Pvt for Telenor ZTE Vega Swap project
• Perform Installation, Commissioning, Configurations and Integration of
ZTE SDR BTS 8700, 8800 and 8900
• Installation of ZTE RRU of 900MHz, 1800 MHz
• Commissioning of sites using LMT Software SDR V4.00.30.08P24.
• Expansion of sites using extra RRUs, RSU Racks and fiber cables.
• Commissioning of IDU of ipaso200, ipaso400, ipaso1000 Models.
• Conduct PAT of sites after removing snags of major and critical severity level

3) Ericsson
At Warid-Ericsson Swap Project
• Ericsson MW (2P, 4P, 20P)/RBS RBS 6101, 6201, 6301 and 6601
• Perform Expansion, Commissioning, Integration of RBS 6101, 6201, 6301 and 6601
• Link capacity upgradation for 3G activities
• Installation of RRU of B1, B3, and B8 Models, TMAs
• Configure internal and external alarms of sites using OMT
• Clearance of all internal and external alarms
• Conduct PAT of sites after removing snags of different severity level
• Installation of Emerson, Delta Rectifier cabinet and there parameter settings
At Warid-Ericsson Swap Project
• Ericsson MW (2P, 4P, 20P)/RBS RBS 6101, 6201, 6301 and 6601
• Perform Expansion, Commissioning, Integration of RBS 6101, 6201, 6301 and 6601
• Link capacity upgradation for 3G activities
• Installation of RRU of B1, B3, and B8 Models, TMAs

interne at ptcl &radio
  • Pakistan - Peshawar
  • January 2010 to February 2011

good

Education

Master's degree, Electrical Engineering
  • at CECOS University Peshawar
  • June 2016

MS Electrical Communication Engineering

Bachelor's degree, Telecommunication Engineering
  • at University of Engineering
  • September 2011

Bsc Telecommunication Engineering

Specialties & Skills

Languages

English
Intermediate
Urdu
Expert
Pushto
Native Speaker

Training and Certifications

HuAWEI RTN Training (Training)
Training Institute:
Huawei Head office Islamabad Pakistan
Date Attended:
October 2016
Duration:
6 hours

Hobbies

  • Reading Holly Quran