Total Years of Experience: 9 Years, 8 Months
May 2017
To Present
Site Mechanical Engineer
at Marathon Engineering Consultants Co. L.L.C
Location :
United Arab Emirates - Al Ain
• Carried out installation of AC System,
Pressurisation System & Heat recovery system.
• Carried out installation of Air cooled chiller
capacity 400 TR, Centrifugal Pumps, Smoke Fans,
Fresh Air Fans, Air Handling Units & Energy
recovery units.
• Preparation of Boq, Material Requests & Follow
ups, Contractors payments, Site inspections &
Site Coordinations.
Pressurisation System & Heat recovery system.
• Carried out installation of Air cooled chiller
capacity 400 TR, Centrifugal Pumps, Smoke Fans,
Fresh Air Fans, Air Handling Units & Energy
recovery units.
• Preparation of Boq, Material Requests & Follow
ups, Contractors payments, Site inspections &
Site Coordinations.
December 2014
To March 2017
Site Mechanical Engineer
at MIA Group of Companies
Location :
Pakistan - Lahore
• Project Plan and schedule with the proposal
requirements through the application of the
primavera P6 software.
• Implementation of the work schedule and
monitor progress of the the project execution
work through daily/weekly/monthly progress
reports.
• Manage the DPR, Technical Submittal, IFC’s,
Shop Drawings & HVAC Equipment’s manual.
• Carried out Inspections of AHU’s, Heat Recovery
Units (HRU), Mini AHU’s, FCU, s & Smoke Fans.
• Executed the Installation of Fire shutter Damper,
Pressure relief dampers, Smoke Dampers,
Volume Control Damper, Gravity Damper, Sound
Liner, & Duct flexible joints.
• Conducted the Chilled Water Pipe & Steam
Condensate Pipe Installation, Testing, &
Flushing.
• Project Coordination with Client, Consultant and
Contractors.
requirements through the application of the
primavera P6 software.
• Implementation of the work schedule and
monitor progress of the the project execution
work through daily/weekly/monthly progress
reports.
• Manage the DPR, Technical Submittal, IFC’s,
Shop Drawings & HVAC Equipment’s manual.
• Carried out Inspections of AHU’s, Heat Recovery
Units (HRU), Mini AHU’s, FCU, s & Smoke Fans.
• Executed the Installation of Fire shutter Damper,
Pressure relief dampers, Smoke Dampers,
Volume Control Damper, Gravity Damper, Sound
Liner, & Duct flexible joints.
• Conducted the Chilled Water Pipe & Steam
Condensate Pipe Installation, Testing, &
Flushing.
• Project Coordination with Client, Consultant and
Contractors.
June 2014
To November 2014
Project Engineer
at Eastern Highway Company
Location :
Pakistan - Rawalpindi
I was appointed as a project engineer. Well it was a project based job. The task was to complete the Road Marking project in the given duration. After all by utilizing my planning and management skills I completed the Road Marking Project successfully on Karakorum highway (silk route) in 4 months. I got highly appreciated by the senior management of my company.
• Team Management,
• Finance management,
• Quality and quantity control,
• Supplies and logistics,
• Inventory management,
And to deal with the higher management of CRBC (China Road and Bridge Corporation) was appended in my duties.
• Team Management,
• Finance management,
• Quality and quantity control,
• Supplies and logistics,
• Inventory management,
And to deal with the higher management of CRBC (China Road and Bridge Corporation) was appended in my duties.
Share on Facebook
Share on Twitter
Share Via Email