Document Controller
Modern Arabian Crystal Company
Total years of experience :9 years, 3 Months
Prepare the All Kind of Submittals for Drawings & Materials for approval of consultant.
Store Material Record Holding work (For Example FDT + Purchase Order Etc.)
Prepare the submittal of CV’s to submit to the consultant Approval.
Managing the project’s site Inspection requests and Project specifications As Well As.
Have knowledge to prepare the Field Adjustment Test results From the Data.
Holding & Managing the all kinds of office document with numbering As Library.
Managing the drawings and Material Submittals very well with their transmittal and comments sheet.
Have an experience of Filing of all kind of documents with reference/Numbering.
Making the drawing and material submittal Log status daily.
Have an experience of Submission of AS-BUILT DRAWINGS at the end of the project.
USA).
Magnesite Project Medina Manwarrah (Coordinating with MA’ADAN
Store Material Record Holding work (For Example MRR + PO etc)
Prepare the submittal of CV’s to submit to the consultant.
Managing the project’s site Inspection requests
Worked as a Time Keeper, Managing & Preparing the man power report and their time sheets.
Overtime request’s for employees at Site.
Holding & Managing the all kinds of office document with codes.
Managed the drawings very well with their transmittal and comments sheet.
Filing work of all kind of documents.
Made the drawing and material submittal status as Reports.
Establishing and maintaining a library of reference documents
Work involves the processing of permanent, long term, short term, and vital records in all media forms, including the scanning or filming of records and management of records in a digital format.
Ensures that pre-established requirements (e.g., which document numbering system will be used; how many and which signatures will be required for certain approvals, etc.) are satisfactorily met throughout the duration of the project.
Maintains an established data distribution system and schedule for the assigned project based upon client, project, and supplier requirements. May revise system or schedule as required to ensure timely approvals and distribution.
Expedites review, signature approval, and release of supplier and internally produced project documents.
Establishes and maintains files and computerized indexes for active engineering documents. Generates electronic/hardcopy reports as needed by the project or management.
Prepares transmittals for engineering documents and requisitions
Arranges document cataloguing, packing, and long-term storage or disposal of appropriate engineering documents at time of project closeout.
2015 to Continue
AECOM Middle East
New Orbital Highway Project Dukhan to
Prepare the Submittals of Drawings & Materials for approval of consultant.
Store Material Record Holding work (For Example MRR + PO etc)
Prepare the submittal of CV’s to submit to the consultant.
Managing the project’s site Inspection requests
Worked as a Time Keeper, Managing & Preparing the man power report and their time sheets.
“
Medina Industrial Estate.
Responsibility:
Establishes and maintains files and computerized indexes for active engineering documents. Generates electronic/hardcopy reports as needed by the project or management.
Prepares transmittals for engineering documents and requisitions
Arranges document cataloguing, packing, and long-term storage or disposal of appropriate engineering documents at time of project closeout.
Establishing and maintaining a record of controlled documents on distribution.
Establishing and maintaining a library of reference documents.
Maintaining a tracking facility to enable documents to be updated easily.
in