Muhammad Abid, QA/QC

Muhammad Abid

QA/QC

SAUDI ARAMCO

Lieu
Arabie Saoudite - Dammam
Éducation
Baccalauréat, Electrical
Expérience
16 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 10 Mois

QA/QC à SAUDI ARAMCO
  • Émirats Arabes Unis
  • juin 2018 à février 2019

Project scope:
Installation of Lattice Type 115KV transmission line (11 KM), Installation of 115KV transition yard, Installation of Surge Arrestors, U/G 115KV Power cable, Termination of power cable at 115KV GIS end, Installation of Gantry at 115KV Transition yard, Cable trays installation, cable pulling and termination, Line differential protection panels installation at Control room and terminations.

8. CONTRACT #: 6600029563, JAZAN REFINERY AND TERMINAL PROJECT EPC-13

QA/QC à SAUDI ARAMCO
  • Émirats Arabes Unis
  • décembre 2016 à juin 2018

Project scope:
Installation of 132KV GIS (ALSTOM/GE) 21 bays and LCC panels, Power/control cable laying, termination and other related work, Overall testing of GIS (Gas Insulated Switchgear), Installation of 8 no’s of 132/13.8KV, 60/80MVA ABB Power Transformers/NGR., Overall testing of Transformers, 132KV Power cable Pulling/Laying Dressing/Splicing around 10 KM and 67 splicing joints, 132KV Power cable Termination at Transformer ends and in GIS Basement, 132KV Power cable testing after pulling/after backfilling/HI-POT, Installation and testing of Link Box, Installation/Testing of Grounding Grid, Installation of SST (Substation service transformers), MV 300MM2 cable pulling/terminations at transformers and Switchgear ends, Installation of MV 4.16 KV Motors, 185MM2 Single core Cable laying/Termination from MCC to Motors/Solo Run test, Cable laying/Termination/Conduit installation form SWGR to Crude charge Pump, Installation of Cable trays and cable pulling at PIB (Process interface building) building.



7. CONTRACT #: 4400003694/00, AIN MURJAN 115/13.8kV SUBSTATION at Al-Hassa

QA
  • décembre 2015 à décembre 2016

Client: SEC/NATIONAL GRID SA
Project Scope: Installation of 3 nos. of 115/13.8KV, 67 MVA ABB Power Transformers, 115 KV GIS 10 Bays, LCC panels, cable laying and termination, 13.8KV Switchgear Installation 25KA., Substation building lighting, Fire Alarm, Battery banks in battery room, Cable tray installation, 3 no’s of 7MVAR Capacitor banks installation.AC/DC panels installation, 2 nos. of 500KVA Service transformers installation.

6. CONTRACT #: 31101188/00, TARUT 115/13.8kV SUBSTATION

QA
  • janvier 2014 à décembre 2015

Client: SEC/NATIONAL GRID SA
Project Scope:
Installation of 4 nos. of 115/13.8KV, 60/80 MVA ABB Power Transformers, 115 KV GIS 7 Bays, LCC panels, cable laying and termination, 13.8KV Switchgear Installation, Substation building lighting, Fire Alarm, Battery banks in battery room, Cable tray installation, AC/DC panels installation, 2 nos. of 750KVA Service transformers installation.

5. CONTRACT #: 6600024540, Upgrade substation#50 at JTF Juyamah/Ras Tanura

QA à SAUDI ARAMCO
  • Émirats Arabes Unis
  • décembre 2014 à juin 2015

Project Scope:
Installation of 13.8KV SWGR, 13.8kv/480V Step down Transformer, 15KV cable laying, Installation of cable trays, AC/DC Panels installation, Cable termination work, Demolition of existing Substation-50.
230 KV, 600MM2 VHV Underground cable pulling/Cable termination & Energization the substation.

4. SEC-EOA BSP 380/230KV SUBSTATION SAFANIYAH for SIEMENS SVC Project & UPGRADE FLARE SYSTEM

PROJECT ENGINEER à SAUDI ARAMCO
  • Émirats Arabes Unis
  • septembre 2013 à janvier 2014

& SEC/NG SA
Project Scope:
1: Installation of HVAC SYSTEM at Dynamic reactive power consumption Safaniya 380/230kv BSP/SVC.
Installation of 2 DDC Panels and termination, Installation of 68 nos. of MF/SD, Installation of 2 nos. of PACU Units/Disconnectors and cable termination., Installation of WEF/REF/SPF, Installation of Duct Heaters, Cable pulling and termination of all MF/SD’s

2: Upgrade onshore flares system, Safaniya oil and Gas Refinery, Saudi Aramco BI-10-00184 at GOSP-1
With HQCEC (China Huanqiu Engineering & Contracting Corp)
Installation of two Flare Gas Recovery System (FGRS-A&B), Installation of two transformers (R74-015-XFR (T)-006&007, 9KVA, 480V, 208/120V at SUB-15, Installation of two transformers (R74-015-XFR (T)-009&010, 20KVA, 480V, 208/120V at SUB-15, Installation of one transformer (R74-015-XFR (T)-005, 15KVA, 480V, 208/120V at SUB-15, Installation of two 480V, 300kw o/d switch Racks for power supply FGRS and nitrogen generator loads, Installation of two 4.16KV, 1200A MCC (R74-015-MCC-201&202), Installation of power/lighting panels, Installation of new Cable tray from SUB-17 to Switch Rack areas, Cable laying and terminations.

3. CONTRACT #: :6600024541, POWER SUPPLY TO SAFANIYAH Gas Oil Separation Plant

QA à SAUDI ARAMCO
  • Émirats Arabes Unis
  • juin 2012 à septembre 2013

Project Scope:
Installation of Substation 230/115kv, 230KV Switch Yard, 230KV and 115KV Lattice type Transmission Line, 230KV and 115KV Transition Yard, Installation of 3 nos. of 230/115/13.8kV, 160/158/2 MVA HYUNDAI Power Transformers(Step Down), Installation of 115 KV GIS-7 Bays, LCC panels, 630MM2 cable laying and termination, 13.8KV Switchgear Installation, Installation of Substation building lightings(Indoor/Outdoor), Fire Alarm System, Battery banks in battery room, Cable tray installation(Electrical/Instrumentation/Communication), MCC Panels installation, installation of 13.8kv/480v service transformers, Installation of 750kva- 480/208-120V Dry type LV transformers, HVAC System (ACCU/AHU/DSW) Installation including DDC Panels, 115KV 21 no’s lattice type tower erection, 230KV 19 no’s lattice type tower line erection, 115kv and 230kv Gantry erection, 230KV Switchyard installation, Aluminum Tubular 5 Inch bus bars with supports and Post Insulators Installation, Grounding Grid Installation with 185MM2 bare tinned coated conductor/Grounding Pit installation, Installation of Post valves/Instrument cable/Switches at Fire water line (RTR), SF6 Gas interrupter Disconnector switch installation (Vertical Break).

•AREVA JUBAIL-2, 380/230KV SUBSTATION

SITE ENGINEER
  • décembre 2010 à juin 2012

Client: SEC/NG SA
Project Scope:
Installation of 380KV and 230KV GIS, LCC Panels Installation and Cable Termination, 230KV 2500MM2 Cable Pulling, 380 KV indoor and outdoor grounding, Installation of Switch yard, Installation of Panels, laying cables and terminations, SCADA & SOE Panels installations, laying cable and termination, Cable lying & termination in Communication room/Fiber optical/Belden/Coaxial, AC/DC Panels installation in Auxiliary Room

SITE ENGINEER
  • octobre 2009 à décembre 2010

Client: Royal Commission/SEC-NG SA
Project Scope: Installation of 3 nos. of 115/13.8KV, cable laying and termination, 13.8KV Switchgear Installation, Substation building lighting, Battery banks in battery room, Cable tray installation, AC/DC panels installation, Direct buried 13.8 KV cable installation 4 circuits.

ELECTRICAL SUPERVISOR à AHMAD FINE TEXTILE MILL WEAVING UNIT
  • Pakistan
  • juillet 2008 à octobre 2009

Assigning work and training employees, ensuring the proper maintenance of equipment, making requests for required electrical items used during maintenance, evaluating employees. Surveillance.

Saudi Aramco: Company General Use
Saudi Aramco: Company General Use

Éducation

Baccalauréat, Electrical
  • janvier 2015

courses: ISO 9001:

Etudes secondaires ou équivalent, Electrical
  • janvier 2015

courses: ISO 9001:

Specialties & Skills

Electrical Engineering
Equipment Installation
Inspectors
QA QC Engineering
BUSINESS INTELLIGENCE
CABLING
CUSTOMER RELATIONS
SWITCHES
TRANSMISSION
LIGHTING