Muhammad Amin Asghar, Site Manager

Muhammad Amin Asghar

Site Manager

Energoprojekt ENTEL Dubai UAE (PMC)

البلد
الإمارات العربية المتحدة - دبي
التعليم
بكالوريوس, Electrical Engineering
الخبرات
17 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :17 years, 0 أشهر

Site Manager في Energoprojekt ENTEL Dubai UAE (PMC)
  • أشغل هذه الوظيفة منذ أكتوبر 2018

Installation & Commissioning of Power Plant( GE Freme7EA) and Substation 400KV 380kV/132kV/115kV/ 110kV/230kV Typical power GIS / AIS Substations, HV/LV, U/G Cables, Transformers, Transmission line, Industrial and commercial Power Projects.
•Operational management, Site operations, Team Leader, All aspects of Health & Safety Reducing costs
•Budget / cash flow management Environmental management, Site inspections.
•Charged to leverage project management and maintenance experience to lead and ensure the delivery of quality solutions, adhering to budgets, timelines and requirements.
•Tracked execution of key milestones, ensuring early identification and communication of potential issues
•Performed site administrative functions and oversee the implementation of production schedules, personnel requirements, quality control, production standards, and safety programs.

Construction Site Manager في Energoprojekt Entel Co.
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ أكتوبر 2018

As an overall Site Manager involved in site management, planning, site supervision, testing and commissioning.
Attend all the progress review, safety and design coordination meetings with the client and contractors for the successful execution of the project in time as per client’s standard and requirements.
Control and monitoring site activities on daily basis and conduct the meeting to resolve the issues and difficulties.
Managing 400KV, 132kV Typical power GIS / AIS Substations, , 400kv, 132kv, 33kV, 13.8KV Switchgear, HV/LV, U/G Cables, Transformers, Transmission line, Industrial and commercial Power Projects
Overall supervision for construction, erection & installation of Major equipment and Firefighting system, HAVC system, LSP system for Substation construction, their testing and commissioning in light of Approved International Engineering Standards & Transmission line and Substation works of 132Kv and 400KV
Installation of GIS (Gas Insulation Substation) make, of different make 400kV, and 132kV (Gas Insulation Substation).

Management Specialist في GE Power Grid Solution KSA
  • يناير 2018 إلى أكتوبر 2018

Client: National Grid KSA
•132/13.8KV S/S South Area KSA
•Worked as lead role in site management team with GE under the sponsorship of MSK Contracting in southern region of Saudi Arabia with Saudi Electricity Company as client.
•As a Construction Manager with the support of project team is responsible for successful execution/delivery of assigned project(s) on-time, within budget, as per Contract Agreement, with on- quality & safety framework of GE.

Key Responsibilities:
•Was responsible for planning work and ensuring a contract is delivered on time.
•Arranged delivery of materials and managing a range of subcontractors.
•Ensured projects ran to schedule and to budget.
•Attended pre-site and on-site meetings with clients and sub-contractors.
•Maintained strict quality control procedures.
•Tested materials, also visual inspections of work, and frequent tours of the site.
•Conducted regular site safety checks, liaising with local councils.
•Was responsible for the cleaning staff, including hiring, wages etc.

Site Construction Manager Projects | Al-Mashariq

Site Manager في Saudi Electricity Company
  • أرمينيا
  • مارس 2010 إلى ديسمبر 2015

Employed By. (Palace Consulting Engineers, PMC)
•Inspection and Witnessing of erection and installation of (132KV, 13.8KV) control and protection panels, 380KV, 132KV indoor GIS, 13.8KV and 33KV SWGR, outgoing feeders, LCC panels RTCC panels, Capacitor bank, LVAC Panels ACDB, EDB, LSDB, HV, LV, CONTROL CABLES Laying and termination, INDOOR AND OUTDOOR Lighting, SCADA and Communication system, Earthling and Fire alarm controls and OHTL, HVA and Plumbing Work.
•Witness and Inspection for the installation of 50/67MVA ONAN/ONAF Power Transformers 132/13.8KV, 5OOKVA Station Service Transformers, NER, 120KV Outdoor station class surge arrestors & 132KV station post insulators, shielding system.
•Witness and supervising of Cable tray system, 132KV XLPE (1x630sq.mm/phase) Cable laying and termination. 13.8KV XLPE (3x300sq.mm/phase) cable laying and termination.
•Preparing Method of statement and Inspection & Test Plan for MEP works.
•Carryout inspections and to insure closure of Quality Action Notice (QAN) and Non Conformance Report (NCR) as per project's procedures.
•Participating in the weekly progress meetings and Quality meetings with all parties to discuss progress, quality issues and non-conformances related to the project.
•Monitor all MEP related documents' logs and coordinate with document control for continuous updates.
•Supervision of the project and coordination between CSD and contractor’s T&C Engineers to ensure that the testing and commissioning procedures are carried out as effectively and efficiently as possible.
•Insure that all works are done as per PTS (project Technical specifications), SOW (scope of work) and SEC- standards & approved drawings using approved materials.
•Performed to Review of OHTL & Substation base design prepared by the Contractor as per Saudi Electric Company specification.
•To ensure that the work performed for a particular project is within scope.
•Check the Contractor Technical submittal regarding Plan & Profile, Sag and Tension calculation, Conductor selection, OPGW (metallic part), Insulator, Surge Arrester, Capacitor Voltage, Transformer and Terminal Compound in line with Saudi Electric Company specification.
•Check design drawings, specifications and shop drawings of the project to insure the results indicated are being achieved well.
•Arrange Electrical punch list and follow all stages of clearance and energizing.

Site Engineer في Arabian Bemco Contracting Co. Ltd
  • المملكة العربية السعودية
  • فبراير 2009 إلى مارس 2010

Power Plant 10, Riyadh Saudi Arabia
•Worked with Project Manager for Installation and commissioning of Gas turbine frame 7EA GE make and electrical distribution system, substation, and electrical facilities like HT/LT Motors, UPS, Electrical Heaters, Fire Alarm system, HVAC etc.
•Implemented a number of small on-site modifications to boost power plants production in addition to running a number of field development projects using outside contractors.
•Lead Engineer on various projects for requiring design-office support to modify or provide additional control systems.
•Investigate problems and recommend solutions.
•Ensure compliance with safety requirements and standards procedures.
•Played an integral role with the project team developing commissioning and start-up plans, Work Procedures and safe operating practices.
•Perform Installation, Erection commissioning & Loop checking.
•Worked with various testing equipment including, FREJA 300, CPC 100, ODEN (Primary Injection Kit), MEGGER (Up to 5kV), SVERKER, EARTH RESISTANCE TESTER, DC HIPOT, AC HIPOT, VIBRATION TESTER & MOM (Contact Resistance Tester) multi-meters, lighting lux tester etc.
•To carry out internal and client inspections and supervision of electrical works in a specified area consisting of 8 GT’s including erection, testing & commissioning of GE make 62MVA generators units, Turbine accessory compartment, GSU & distribution transformers, 13.8kV segregated bus duct, Aux. system motors, GNAC, GLAC, Cooling water modules, Wash water skids, CO2 skids, Fuel management system and misc. systems & equipment, grounding grid and duct banks installations.
•To review and implement the drawings of GE make AC & DC MCC’s, Generator and GSU transformer protection & control panels, Aux. transformer protection panels, GEDAC and Powercon make 13.8kV Unit switchgears, 13.8kV Station switchgears, ABB make LV switchgears, and LV DB’s and Siemens make crude oil heater panels, To supervise and witness the changes implementation in panels and red-mark drawings
•To supervise and witness the erection, termination, secondary & primary injection testing and commissioning of above panels and equipment.

Electrical Engineer
  • نوفمبر 2006 إلى ديسمبر 2008
Testing Engineer في Pan Power International (Pvt.) Ltd
  • باكستان
  • أبريل 2005 إلى نوفمبر 2006

of manufacturing process of Instrument and Distribution Transformers and checking the material to related manufacturing process
•Preparation sample transformer for approval to Water and power development authority (WAPDA) Design office under supervision
•Checking the quality and visual examination after completing the manufacturing process and offer to buyer/Wapda inspector for final inspection.
•To supervise the all type tests of instrument transformers and distribution transformers jointly Wapda inspector.
•To test witnessed the all types test (high voltage, short circuit, impulse voltage test) of instrument and distribution transformer at high voltage and short circuit lab at Rawat jointly deputy director (design and material) Wapda.
•To test witnessed the accuracy type tests of current transformers at research and test lab Faisalabad jointly deputy director (design and material) Wapda.
•Checking the quality and performing the tests (high voltage test, insulation test, operation system check) of switch gear (L.T panel, H.T panel, A.C.B, V.C.B and O.C.B) according to buyer specification.
•Preparation and maintain the reports of all tests of transformers for Wapda and company.
•Good knowledge in leading and management

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في NICE Pakistan
  • ديسمبر 2010

Specialties & Skills

Electrical
BUDGETING
CUSTOMER RELATIONS
MICROSOFT WORKS
QUALITY
SPECIFICATION
SUPERVISORY SKILLS
CABLING

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
December 2020
صالحة لغاية:
December 2023

الهوايات

  • SPORTS AND READING BOOKS