MEP SUpervisor
SHIMIZU CORPORATION
مجموع سنوات الخبرة :5 years, 9 أشهر
1) To ensure works been carry out as per design brief by Consultant or
Client's need.
2) To liaise with the Sub-Con regarding material arrival, work schedule,
manpower arrangement and sequence of the inspection
3) To ensure the project can achieve before handover and turnover date to client's arrangement.
4) To make an inspection and monitoring all the site work progress follows the work program and schedule given.
5) To monitoring construction at site accordance to drawing, QA/QC,
engineer, MOS.
6) To ensure ZERO accident during construction.
7) Method of Statement review before start any work on site.
8) QA/QC of works during construction.
9) Current Project: Tokuyama Manufacturing Polychristalline Plant (TMP) & Fibertex Nilai 3 Negeri Sembilan
Position: Engineer
Specialization: (Building Automation System)
Date Joined: 20 June 2011
Scope of works: Building Automation and HVAC/ACMV Control Design
1) Make a design drawing, Method of Statement review and Materials
document for submission and to get the approval from client/main
contractor for (AFC)
2) To ensure works been carry out as per design brief by Consultant or
Client's need.
3) To ensure the project can achieve before handover date and have to maintain the GP.
4) To check in coming material by DO such as reinforcement.
5) To make an inspection and monitoring all the site work progress follows the work program given by Main Contractor.
6) Request for Inspection (RFI) and check list to Client or Main Contractor.
7) To monitoring construction at site accordance to drawing, QA/QC,
engineer, MOS.
8) To ensure ZERO accident during construction.
12) Project Experience: Petronas Optimal Kerteh, Tokuyama Building Bintulu for BJ1&F! and I-Setan Suria KLCC (Upgrading)
3. Company Name: MEGA JATI CONSULT SDN BHD
Position: Clerk of Work (C.O.W)
Specialization: (Mechanical & Electrical)
Date Joined: 2 November 2010
Scope of works:
1) To ensure works been carry out as per design brief and JKR requirement.
2) To check in coming material by DO such as reinforcement.
3) To make an inspection and monitoring all the site work progress follows the work program given by Contractor.
4) Request for Inspection (RFI) and check list to client.
5) To monitoring construction at site accordance to drawing, QA/QC,
engineer, MOS.
6) Monitoring site measurement claim.
7) To ensure ZERO accident during construction.
8) Method of Statement review before start any work on site.
9) QA/QC of works during construction.
1) Provide maintenance, technical consultation, analyze and resolve technical issue on Closed Circuit TV (CCTV) System, Building Automation System (BAS) and HVAC System.
2) Problem solving and trouble shooting for equipment breakdown, software, LAN networking and server/workstation failure.
3) To install and commission new equipment and also conducting training to customers on the equipments.
4) Dealing with Main/Sub Contractors, vendors and clients.
5) Conduct a group of technicians to maintain good service and response to the complaint from clients.Involved with Testing and Commissioning (T&C) department for Building Security System (BSS) and Building Management System (BMS) which is called Smart Home.
6) Solicit and maintain favorable contact with potential and current clients; build and maintain good customer relations.
7) Site : Kuala Lumpur Convention Centre (KLCC), KL
Traders Hotel, KL
CIMB Jalan Raja Laut
TM Jalan Raja Chulan
Matrade
2004 - 2008 DIPLOMA OF ENGINEERING TECHNOLOGY IN ELECTRICAL AND ELECTRONICS CGPA: 2.53 Name of Institution: Unversiti Kuala Lumpur British Malaysian Institute