محمد مباشر Abdul Rauf, Electrical Testing Engineer

محمد مباشر Abdul Rauf

Electrical Testing Engineer

PAK ELEKTRON LIMITED

البلد
باكستان
التعليم
بكالوريوس, Electrical
الخبرات
12 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 10 أشهر

Electrical Testing Engineer في PAK ELEKTRON LIMITED
  • باكستان - لاهور
  • أشغل هذه الوظيفة منذ نوفمبر 2012

Hands on experience as Electrical Engineer for Testing and Fault Rectification of control and protection circuits.
• Company: M/S PAK ELEKTRON LIMITED (12th Nov. 2012 till present) :
(EPC Power Projects)
Project: 220/132kV Dera Murad Jamali AIS Substation(One and Half Breaker Scheme)
• Design optimization of 220kV and 132kV side Control and Relay Panels including Busbar and Breaker Failure Panels.
• Preparing Compliance Statements for approval of SEL Protection Relays from NTDC.
• Choosing ordering codes of relays in accordance with NTDC Specification.
Project: Testing & Commissioning of 220/132kV Shalamar GIS Substation, Lahore
 FAT of Breaker Failure, REF, Differential, Over current, Auto-Reclose and Distance Protection make (SEL)
 Trouble Shooting of 220kV Circuit Breaker Trip Circuit and Pole Discrepancy issue
 Testing and design modification of 220/132kV GIS Local Control Panels
 Trouble shooting of control and protection circuits
 Testing and design of 220 and 132kV Line and Auto Transformer Bay Control Panels
 Design of 220/132kV Control and Relay Panel Schematics
 Verification of control, protection, AC/DC, CT/PT and Auto Transformer MDU circuits
 Counter Checking of interconnection and interlocking logic devised in Control and Protection Schematics
 Managing required modification in circuits at site
 Design of cable schedule plan and cable length estimation.
 Project: 132/11.5kV FIEDMC AIS Substation, Faisalabad
 Testing of Control Panel including remote operation of CBs and disconnectors, alarm annunciations etc.
 Testing Local Closing and Trip circuits of 132kV CBs and 11kV I/C and O/G Panels.
 Preparing As Built Schematics of Control Relay panels, Marshalling Kiosks, CT PT Junction Boxes.

• Company: M/S ATLANTIC CORPORATION (July 2011- Nov 2012)
Project: Testing and Commissioning of 11.5kV/132KV AIS Substation for 120MW Rental Power Station Basra, Iraq.
 Designing Single Line Diagram and Switchyard Layout.
 Designing Double Source AC Auxiliary Supply containing 2 Nos. of 2000KVA 11.5kV/400 V Transformers.
 Designing 132kV Transformer Bay Control and Protection Panel and Marshalling Kiosks.
 Complete Cable Scheduling Plan of Substation and Terminal Schedules.
132kV/11.5 kV AIS Substation DHA Valley, Islamabad:
 Proposal of 132 kV Transmission Line Route to Substation.
 Switchyard Layout of 132kV Substation and Control House Building.
 Designing Single Line Diagram.
 Making Terminal Plans and Designing of AC/DC Auxiliary Service Panels, Bus Coupler Panels, 11kV Metal Clad Switch - Gear Panels (Incoming/Outgoing).

Junior Electrical Engineer في Atlantic Corporation
  • باكستان - لاهور
  • يوليو 2011 إلى نوفمبر 2012

Designing of Substation SLD's
132kV Control and Relay Panel Schematics
MV Panel Schematics

الخلفية التعليمية

بكالوريوس, Electrical
  • في U.E.T Lahore
  • يوليو 2011
الثانوية العامة أو ما يعادلها, Mathematics, Physics, Chemistry
  • في Government College University Lahore
  • أغسطس 2007

I did my Intermediate from the well renowned Government College University Lahore. I obtained 925 marks out of 1100. During my Intermediate i also participated in extra activities regarding sports and donor societies.

Specialties & Skills

MS Project
Microsoft Office
Drawing Electrical Schematics at Auto CAD
Developing Project Activity Charts
Making Terminal Plans of Substation Panels
Electrical Schematics Trouble Shooting
Brisk User of Internet regarding Technical stuff
English Writing Skill
Designing of Substation Control , Relay, AC/DC Auxiliary Panels etc

اللغات

الانجليزية
متمرّس
العربية
مبتدئ

التدريب و الشهادات

Internship at Gas Turbine, Steam Turbine , Maintenance Workshop etc (تدريب)
معهد التدريب:
GAS TURBINE POWER STATION GENCO III FAISALABAD
تاريخ الدورة:
June 2010