Muharem سباسيك, Leader Electrical Engineer

Muharem سباسيك

Leader Electrical Engineer

Hydrocontrol d.o.o. Sarajevo

البلد
البوسنة و الهرسك - Sarajevo
التعليم
بكالوريوس, Electrical Energy
الخبرات
26 years, 11 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :26 years, 11 أشهر

Leader Electrical Engineer في Hydrocontrol d.o.o. Sarajevo
  • البوسنة و الهرسك - Sarajevo
  • أشغل هذه الوظيفة منذ يناير 2020

• Preliminary and detailed design of electrical installations in buildings and infrastructures;
• Performs analysis of available technical documentation of contracted works or those to be offered;
• Collects relevant data, prices and other information, works and makes offers for performing electrical installations of HV; MV, LV and ELV;
• Makes offers for performing installations of HV; MV, LV and ELV;
• Organizes works on performing electrical installations on the building, makes a dynamic execution plan.
• Plans the number of subcontractor as well as the procurement of necessary materials and equipment;
• Collects bids from subcontractors for electrical installation, analyzes and proposes to the managers of the most favorable subcontractor;
• Coordinates with Contractors on the construction site (s) and takes care of quality and dynamical execution of all electrical works;
• Assumes responsibility that the work on the site is performed according to the project and in accordance with the measures of safety at work and fire protection;
• Collects, records and records the quantities of execution of contracted positions, as well as subsequent works, on the basis of which it compiles the calculation sheets of the construction book, which it presents to the Investor's representative and ensures the signing of all listed positions;
• He is directly responsible for his work to the General Manager of the Company.

Leader Electrical Engineer في BBM d.o.o. Sarajevo
  • البوسنة و الهرسك
  • مايو 2017 إلى أكتوبر 2020

* Responsible for the review, recommendation and approval of all electrical submittals such as material submittals, shop drawing, as-built drawing, method of statements and O & M manual submittals.
* Respond and coordinate related RFI’s raised from the contractor regarding electrical aspect of the project.
* Study construction documents involving electrical works in coordination to other discipline and develop clear understanding of scope, details and responsibilities.
* Maintain awareness of the project mechanical specifications, drawings and design criteria.
* To resolve any unexpected technical difficulties and other problems that may arise at any time.
* Attend regularly on weekly, monthly and other progress meetings held at the site.
* Review project correspondence and prepare appropriate response in related to electrical works for the Project Manager’s review.
* Responsible for the final inspection of the work and monitor final completion of the work prior to handing over of the project to the client.
* Check third parties’ inspection report and Witness Testing and Commissioning of the works.
* Responsible for maintaining the accuracy of design and workmanship for electrical transmission, distribution substation, primary protection, lighting and power control, fire alarm & voice evacuation, paging system and public-address system, telephone/data system, emergency lighting system, structured cabling system, earthing and lightning protection system.

Senior Electrical Engineer في CEG International
  • قطر - الدوحة
  • يوليو 2011 إلى أبريل 2017

• Report and liaise with Project Manager regarding the Electrical aspects of the project.
• Assist the project manager in liaison with the client and the contractor regarding electrical works issues.
• Responsible for the review, recommendation and approval of all electrical submittals such as material submittals, shop drawing, as-built drawing, method of statements and O & M manual submittals.
• Respond and coordinate related request for information (RFI’s) raised from the contractor regarding electrical aspect of the project.
• Study construction documents involving electrical works in coordination to other discipline and develop clear understanding of scope, details and responsibilities.
• To coordinate with other disciplines as required on day-to-day basis or as set out by the project requirements.
• Maintain awareness of the project mechanical specifications, drawings and design criteria.
• To resolve any unexpected technical difficulties and other problems that may arise at any time.
• Attend regularly on weekly, monthly and other progress meetings held at the site.
• Issue and coordinate Non-conformance report, Conformance Report and other documents to the contractor pertaining to the standard specifications.
• Review project correspondence and prepare appropriate response in related to electrical works for the Project Manager’s review.
• Responsible for the final inspection of the work and monitor final completion of the work prior to handing over of the project to the client.
• Check third parties inspection report and Witness Testing and Commissioning of the works.
• Responsible for maintaining the accuracy of design and workmanship for electrical transmission, distribution substation, primary protection, lighting and power control, fire alarm & voice evacuation, paging system and public address system, telephone/data system, emergency lighting system, structured cabling system, earthing and lightning protection system.
• Oversee supervision works for all electrical installations including substation, power, lighting, cabling, wiring and grounding in accordance with national and international installation specification.

Manager of Electrical Department & Electrical Design Engineer في HIDROGRADNJA d.d. Sarajevo, Civil Engineering Company
  • البوسنة و الهرسك
  • مارس 2004 إلى يونيو 2011

- November 2008 - February 2011, Design Engineer, Great Socialist People’s Libyan Arab Jamahiriya,
Organization for Development of Administrative Centers (ODAC): Sa’adi Water Supply Project 143/2009 &
Zeffran 500 Housing Water Supply Project 070/2009,
- November 2006 - November 2008, Engineer for design and develop, Great Socialist People’s Libyan Arab
Jamahiriya, The Management & Implementation Authority Of The Great Man-Made River Project, Gebaiba -
Algharbiat - Abuhadi - Alhenewa - Jaref Populations Of Sirt Municipality Water Supply Project, Contract No.:
14015-A-530-00-CT-CT-1001,
- Mart 2005 - November 2006, Manager of Electrical Department, Great Man-Made River Project External
Cathodic Protection-Libya, Contract 19115-A-530-00-CT-CT-1001-00,
- Mart 2004 - February 2005, Manager of Electrical Department, Great Man-Made River Project External
Cathodic Protection-Libya, Contract 17615-A-530-00-CT-CT-1001-00 Change Order No. 1.

Design Electrical Engineer and Developer في AUPRO - Automation and Process Engineering,
  • البوسنة و الهرسك
  • يوليو 2002 إلى فبراير 2004

Note: "AUPRO" d.o.o. Brčko is daughter firm of the firm AUPRO Automatisierung und Prozesstechnik GmbH
Römerberg (Germany).
- The new project planning: "TDH - Raff. III Hexane" (240 process points there from 14 Z - process point (“A”
type of safe switching); "Symphony" process control system, "Melody" cabinets, BASF Ludwigshafen).
- The planning two measuring cabinets for the control the pumps of the water mire in Niederrad (Germany) per
ABB Frankfurt am Main.
- Alternations and adaptations numbers of the whole documentations for the building (fabric) Q245 against
standards in BASF Ludwigshafen (RPI BASF).
- A few project for generation actor-sensor tables in the MS Excel and MS Access for BASF Ludwigshafen.
- New planning the old electrical stream schemes (energy accommodations) against RPI BASF.
Page 2 of 2
- Creation overviews of the energy accommodations for the preparations of the water (BASF, fabrics: K114, K118,
A712 and K117).
- Design the logical diagrams for the preparation of the water for BASF Ludwigshafen (according to our clients -
the largest system of the world). For the rapid acceleration of the work, I designed a few CAE - applications (for it
I used: VB 6.0, VB.NET, AutoCAD, Access and Excel). There were been four large projects.
- Alternations on the logical diagrams for the preparation of the water for BASF Ludwigshafen. Allocate the new
documents numbers and implementations of the standard macros for the control of the valves and the pumps.
Reprocessed of the alarms, surveillances, checkpoints and messages. There were been also four large projects.
- Planning and designing the electrical stream schemes for an almshouse in Germany.
- A large number of the small projects for BASF Ludwigshafen (1 - 40 process points - "Symphony" process
control system, "Hima" PLC for the Z - process points).
- One web-site (JavaScript, on-line orders).

Electrical Engineer for maintenance في DD "Namjestaj" Gradacac, Furniture factory
  • البوسنة و الهرسك
  • يونيو 1997 إلى يونيو 2002

Independent assistant for the data processing, maintaining LAN, electrical installations, equipments and machines.

الخلفية التعليمية

بكالوريوس, Electrical Energy
  • في University of Tuzla - Faculty of Electrical Engineering
  • مايو 1997

BOSNIA AND HERZEGOVINA, UNIVERSITY IN TUZLA SCHOOL OF ELECTRICAL AND MECHANICAL ENGINEERING - DIPLOMA - FOR COMPLETION OF ALL UNIVERSITY DEGREE STUDIES (B.Sc.) AT THE SCHOOL OF ELECTRICAL AND MECHANICAL ENGINEERING IN TUZLA, THE UNIVERSITY RECTOR AND THE DEAN OF THE SCHOOL OF ELECTRICAL AND MECHANICAL ENGINEERING AT THE UNIVERSITY IN TUZLA BY THEIR SIGNATURES AND THE SEAL OF THE UNIVERSITY CERTIFY THAT SUBASIC (SON OF MEHMED) MUHAREM ON 29.04.1997 COMPLETED ALL STUDIES FOR OBTAINING THE UNIVERSITY DEGREE (B.Sc) AT THE DEPARTMENT OF HIGH POWER ENGINEERING AT THE SCHOOL OF ELECTRICAL AND MECHANICAL ENGINEERING IN TUZLA AND HAS THEREFORE FULFILLED ALL REQUIRED CONDITIONS FOR OBTAINING THE UNIVERSITY DIPLOMA (B.Sc DEGREE) AND THE PROFESSIONAL TITLE OF GRADUATE ELECTRICAL ENGINEER

Specialties & Skills

AutoCAD
Visual Basic
Supervisory Experience
Design Electical
Siemens Step 7
Fortran
MS Visual Studio
MS Visual C++
Siemens WinCC
Microsoft Office software & the Internet
MS FoxPro
Autodesk: AutoCAD
MS Visual Basic
DOCWin ABB Design Optimisation on Computer

اللغات

الانجليزية
متوسط
الالمانية
متوسط
العربية
مبتدئ
الروسية
متوسط

التدريب و الشهادات

Grade A - Electrical Engineer at Urban Planning and Development Agency - Qatar (الشهادة)
تاريخ الدورة:
March 2016
صالحة لغاية:
March 2019
Specialist for water/wastewater Instrumentation (الشهادة)
تاريخ الدورة:
May 2008
صالحة لغاية:
May 2008