TRAINEE ENGINEER
GASCO ENGINEERING LIMITED
Total years of experience :1 years, 1 Months
Relocation of CPF Project to EPF Project Tolland, Semi Gum bat Chat
•Duties primarily include detail execution of equipment and process piping systems. Also ensure that all engineering work is carried out in accordance with specifications, laws, rules & regulations and customer’s satisfaction.
Duties and Responsibilities:
•Working on dismantling of different types of skid such as slug catcher, HDCP, condenser, inlet separators, propane tank, heat medium, storage tanks, glycol unit, degasser, pumps, and its accessories.
•Working on installation of process piping.
•Supervision of welding workers team.
•Working on execution, installation of equipments, vessels and commissioning.
•Erection of HDCP, dehydration unit, glycol unit, storage tanks, water tanks, flare, knockout drums, heat exchangers, compressors, pumps.
•Installation of different types of valves such as ball, globe, gate, butterfly, plug, pinch, breath, check, needle, along with strainers, dummies.
•Coordination with QC Engineers.
•Coordination with Planning Engineers to handle documentation.
•Preparation of packages for hydro testing tests and Supervision of team to conduct tests.
•Reporting to project manager related to project activities.
•Conduction of welding qualifying tests, UTG, and different other tests.
•Management of material yard.
•Preparation of punch listing and supervision to kill punch points.
•Submission of daily progress report to construction manager and planning engineer.
•Providing technical support to the project team and wider regional teams.
•Producing Test Plans and reports.
•Prepare contract documentation for procurement services and materials.
•Full command on isometric, piping and instrumentation drawing and general drawing and preparation of as built drawing.
Selection of FCU, AHU, Exhast fan, blower and accessories.
•Monitoring the working of boiler and accompanied units, Chiller and accompanied units, ducts and blowers
•Supervising the team of technicians over programmed maintenance by controlling and maintaining documentation.
•Ensuring the chiller and boiler to be on their specified temperature and pressure limits.
•Predictive and preventive maintenance carried out to avoid leakage in pipes, pumps, within and outside the boiler to ensure desired working of plants
•Supervision of technicians to repair failed units, by obeying all due course of safety
• May happen during the course of operation.
•Producing test plans and report.
PIA in line Maintenance BBIA.
•Y on A-320, ATR-42, B-777, A-310. WORKED ON Glassy and Semi glassy cockpits, Extended twin Engine operation(ETOPS) Aircraft Aerospace system of B-777-200, B-777-300, A-310 Learnt Flight Management system (FMS)