Electrical and Instrumentation QA/QC Inspector
Applus Velosi
Total des années d'expérience :6 years, 0 Mois
Working at Aramco Projects as \[Approved\] Electrical & Instrumentation QC/QA Inspector.
Worked at: Aramco Khurais GOSP Extension Project
• 10-01506-0002 - Temporary Facilities \[Completed\]\[from 55% till handover\]
• 10-01506-0003 - Khurais Processing Central Facilities (CPF) \[from 0% to 40%\]
• 10-01506-0007 - Residential and Industrial Complex Expansion \[from 0% till 90% pre-commissioning\]
Experience Skills:
Doing the inspection with complying Aramco Standards, NEC 2014 Standards, and NEMA VE2 Standards.
Worked-in Residential Buildings, GOSP \[Gas Oil Separation Plant\] and WIP \[Water Injection Pump\].
Worked-on Grounding System; Duct Banks; Cable Trays; Lighting Systems; LV and MV Transformers; Switchgears; Panelboards; MCC; Electrical Generators; Tanks Cathodic Protection; Fire Alarm System; Electrical Rooms; Battery Rooms; Instruments Calibration; Instruments Lap; Marshalling Cabinets.
At Instrumentation Pre-Commissioning Department \[Dec 01, 2014 to Mar 17, 2016\]
Job Description:
Perform loop check on the installed instruments from the control room.
Creating a detailed database \[by excel\] of the total loops and their progress.
Follow the overall punch list system and define priority in line with Subsystem completion.
Monitor and supervise the clearance of such items by the contractor and subcontractors.
Reviewing and verifying the validity of the punches based on Company Standards.
Troubleshooting the obstacles of punch clearance.
Expedite the review and signing of the completed punch lists to ensure the completion of the systems and subsystems in a timely manner.
Coordinate the task completion and punchlist management, tracking and updating the master punchlist database.
At Quality Control Department \[April 20, 2014 to Nov 30, 2014\]
Job Description:
Attending daily Inspection Notification submitted by the Contractor.
Verifying works done by the contractors as per IFC Drawing and SADARA Standards.
Verifying Materials Receiving Inspection as per approved Vendor and as per required specification.
Monitoring and controlling QC activities carried out by the Construction Contractor’s and their subcontractors.
Coordinating and advising the contractor preventive measures if seen the material or installation is going to be unacceptable based on Company Specifications.
Submitting weekly reports to the Quality Lead such as tracking INs, Surveillances, and weekly highlights.
- Conducting prevent maintenance for Fire System.
- Control fire System panels and its devices.
- Program Fire System and its devices.
- repair and fix Fire System.
- Install Fire System.
- Create and update zone layouts \[Fire System mapping\].
-etc...
This is coop-Training experience and it was 14 weeks
The work for 13 weeks was about checking the drilling tools, connecting its parts and programming it.
A week was at (rig) field in the drilling controlling room (MWD)
Associate's degree in Instrumentation and Control Engineering Technology Grade: 3.38/4 (Second Honor) Awards: Three certificates of Appreciation: For participation and achieving the first class during the 1st Royal Commission’s Olympics for the Robot (VEX) Competition which held in Jubail, Saudi Arabia on May 18th, 2011