MURALIDHAR MP, VICE PRESIDENT-PROCESS LEAD

MURALIDHAR MP

VICE PRESIDENT-PROCESS LEAD

ESSAR PROJECT MANAGEMENT & CONSTRUCTION LIMITED

Lieu
Inde - Bengaluru
Éducation
Baccalauréat, Chemical Engineering
Expérience
41 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :41 years, 5 Mois

VICE PRESIDENT-PROCESS LEAD à ESSAR PROJECT MANAGEMENT & CONSTRUCTION LIMITED
  • Autre
  • Je travaille ici depuis juillet 2008
Senior Process engineer/Acting head process à Bahrain National Gas Company
  • Bahreïn - Ar Rifa
  • septembre 1995 à mars 2021

Team Lead for below:
Bahrain National Gas Company (FEED, EPC by JGC, Japan)
5.12 Revamp of TEG dehydration units - nine numbers of which two are front end - Sulzer Chemtech and Koch Glitch: replacement of trays with high efficiency structured packing-PMC
5.13 Revamp of fire water system - PMC
5.14 Flare snuffing systems for CGP both the trains -PMC
5.14 Replacement of NAF with Argonite firefighting systems- 6 locations- PMC (to eliminate Halons)
5.15 Three numbers of new Gas Compressor stations - Concept to commissioning each about 40 MMUSD-PMC and EPC
5.16 New Gas Processing train of 350 MMSCFD and about 450 MMUSD- concept tocommissioning- FEED, PMC and EPC
5.17 Various package units like ClO2 dosing system, I.A., Mobile Steam generator.
5.18 Replacement of Compressor stations B/L gate valves with ROV’s.
5.19 Processing of Refinery Off Gas- Major high returns project.
5.20 Revamp of Gas Gathering and transmission network-revamp PMC.
5.21Internal FBE and Cement lined piping for FW system- Safety Enhancement PMC.
5.22 Implement safety relief systems adequacy after capacity enhancement at two compressor stations - Study and PMC to EPC and testing.
5.23 Revamp of Residue Gas transmission network.
5.24 Many other in-house mini-PMCs and Operational and optimization projects.
5.25 Member of six committees Hazop, stock review, accident investigation, grievance committee, inter-ministerial steering committee & vendor evaluation.

Deputy manager process à INDIAN OIL CORPORATION LIMITED
  • Inde - Mathura
  • décembre 1982 à août 1995

From trainee process engineer to deputy manager process: learning to supervisory level to team leader:

5A . IOCL
5.1 CDU/VDU Revamp
5.2 Additional tankage
5.3 LPG bottling plant sprinkler system
5.4 Automation of offsite tankages
5.5 Bombay High Naphtha De aromatization
5.6 Platformer in house revamp study
5.8 Yield and energy survey at Mathura refinery.
5.9 SRU revamp study.
5.10 Other operational and safety enhancements
5.11 Four years worked in Operations (CDU/VDU/FCCUVBU/SRU/BBU/ARU-OSBL).

Éducation

Baccalauréat, Chemical Engineering
  • à Osmania University
  • avril 1980

Design of distillation column with reaction.

Specialties & Skills

Global Sourcing
Process Improvement
Process Engineering
SOURCING TECHNICAL
ENERGY AND SAFETY AUDIT
HAZOP & MOC
ENGINEERING IN OIL & GAS INDUSTRY
SHUT DOWN MANAGEMENT
project EPC & PMC
process engineering
LIAISON WITH GOVT BODIES/COMPANIES
INSURANCE INTERFACE

Langues

Anglais
Expert
Hindi
Langue Maternelle
Telugu
Langue Maternelle
Kannada
Langue Maternelle
Tamil
Moyen
Arabe
Débutant