Murat  UNSU, Electrical and I&C Superintendent

Murat UNSU

Electrical and I&C Superintendent

ENKA

Lieu
Turquie
Éducation
Baccalauréat, Electrical and Electronics Engineer
Expérience
22 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :22 years, 11 Mois

Electrical and I&C Superintendent à ENKA
  • Turquie - Izmir
  • Je travaille ici depuis juin 2021

My Project: SOCAR Star Refinery, Petkim Petro Kimya and Stad Facilities Aliağa/İzmir
• Repair and renewal type works in electrical, instrumentation disciplines.
• Performs procurement, prefabrication, construction and commissioning under individual work packages (more than 50 packages up to now) that take place at STAR, STAD and PETKİM Facilities operated by SOCAR in Aliağa / İzmir.
• The overall coordination of the relevant procurement, construction and commissioning work processes and reports as part of the project management team to the Project Manager.
• Develop the electrical, Instrumentation, ICSS & Telecom sub-system boundaries by marking up the SLDs and compilation of the electrical, Instrumentation, ICSS & Telecom sub-system list
• Populate, verify and update the mechanical completions database, ensuring any discrepancies are raised via TQ and resolved with Engineering
• Review and update the ITRs & FTRs for the Electrical and I&C discipline
• Take part in Engineering reviews for the Electrical and I&C discipline
• Liaise with Engineering, Procurement, Construction, QA/QC & Operations within the organization for the Electrical and I&C discipline in all aspects of preparation & execution
• Coordination with other Superintendents on cross-discipline issues, scheduling, execution and handovers
• Ensure all FAT/SATs are attended and review and update reports, both internal & Vendor’s
• Attend the Daily Meetings, report all activities, progress and areas of concern to the Project Manager
• Attend all PTW & SIMOPS meetings
• Review Bids and Technical Evaluation.

Electrical and I&C Manager à PDO Optimum Project Design
  • Turquie - Istanbul
  • Je travaille ici depuis janvier 2020

My Project: Various Clients (Shell, Marmara Storage Services.)
• Organized the preparation of the Technical Document Register (TDR), identify requirements and scope of work; review specifications Process Data Sheets (PDS), Piping Material Specifications (PMS), Piping & Instrumentation Diagrams (P&ID’s), Plot plans, General Arrangement (GA) drawings, Review Philosophies, Area Classification Drawings, Fire and Gas Detector Layout Drawings and other relevant documents. Establish contract review criteria, identify and resolve discrepancies and divergences from original proposal through the instigation of technical queries to projects/client.
• Prepared equipment and material specifications and data sheets, develop detailed engineering calculations and drawings including the preparation of the design basis document, Instrument Index, Input & Output Lists, Bill of Quantities, Block Diagrams, Equipment system specifications, Cable routing, Control room layouts, Cause and Effect Diagrams, Complex Control loop Narratives and Safety Narratives Loop Diagrams, Functional Logic Diagrams, Terminations Diagrams, Installation Hook-up Drawings, Instrument Plot Plans, Control Panel Drawings, Control/Equipment Room Lay-outs, Cable Tray/Trench Lay-outs, Cable Schedules and Cable Drum Schedules, JB schedules, Interconnection Schedules, Fire/Smoke Detection Lay-out and Alarm Lists, Earthing & Lightning Layouts, Lighting Layouts, Cable Sizing, Load Flow, Voltage Drop, Motor Starting, Short Circuit, Relay Coordination Studies
• Participated in HAZOP meeting and undertake SIL studies with client and representatives of other engineering disciplines.
•Interfaced and provided clarification and guidance and technical support to construction sites and commissioning engineers provide startup assistance as required.
• Managed commissioning documents preparation.
• Specified the equipment, instruments and produced the material take-off, material requisitions and technical specifications.
• Exchanged the information with the other engineering disciplines and co-coordinating the works together.
• Ensured management of change (MOC) requirements regarding field design modifications and scope changes are met by forwarding appropriate documentation for processing.
• Reviewed and approving the vendor produced documents.
• Evaluated whether catalog data and technical drawings of electrical and instrumentation equipment
are in line with project requirements as well as process needs.

Electrical and Instrument Cheif Engineer à RENAISSACE HEAVY INDUSTRY
  • Fédération de Russie
  • octobre 2018 à octobre 2019

My Project: Amur Gas Processing Plant (49 million tons/year capacity)
• Coordinated to all construction team members activities and related construction discipline and ensured they are produced to the correct level of quality and in accordance with the contract requirements and approved project plans
• Reviewed/Checked all electrical & instrument drawings and documents. Ensured engineering design quality and technical accuracy of drawings together with 2D/3D models, material quantities, requisition, specification, calculations and procedures are as per requirement.
• Attended project inter-discipline reviews and progress meetings and also assist in the preparation of project control reports. Develop and ensure interaction with other disciplines.
• Ensured that construction drawings have been implemented as refer to project standard and specification, To ensure that the generated construction drawings are in line with the project construction schedule. To liaise with the QA/QC department whether installation method and installation material for the project is as per the generated installation drawings and to the material specification.
• Supervised the execution of construction and commissioning activities related to Electrical and I&C disciplines for the project (with regard to procedures, quality, HSE, cost and schedule optimization) to the full satisfaction of Operations.
• Prepared and followed up progress reports construction and commissioning activities.
• Ensured that contractors are aware of and comply with HSE rules and regulations.
• Ensured all the pre-commissioning and commissioning for E&I activities are executed in an efficient way and in line with the Project Schedule.

Electrical Superintendent à Tecnicas Reunidas
  • Turquie - Izmir
  • avril 2017 à juillet 2018

My Project: Area 3, Star Aegean Oil Refinery (10 million tons/year capacity)
• Planed, assigned, and coordinated project work with various electrical sub-contractors to ensure continuous project workflow
• Determined method of construction, labor needs, material quantities, equipment needs, temporary power sources, and work schedule
• Monitored work performance and productivity of craft sub-contractors as assigned to ensure project rules, procedures, and safety requirements are maintained
• Advised construction manager of potential problems and assist in resolution
• Maintained communication with project staff, engineering, and supply chain management to ensure work complies with drawings, specifications, and schedule
• Assisted in the reporting of the job’s progress to the Project Manager; maintain communication with other departments as required.
• Ensured all project work is completed in accordance with specifications, schedule, and safety

Electrical & ICT Chief Engineer à Polimeks
  • Turkménistan
  • juillet 2011 à novembre 2016

My projects: 45, 000-capacity national stadium for soccer and athletics, 15, 000-capacity arena for indoor sports like basketball, handball and volleyball…, 10.000-capacity multi-purpose ice hockey arena with school and accommodation building, 4.000-capacity indoor tennis court, 8 outdoor tennis court
• Improved electrical and ICT drawings, specifications, calculations according to International and local regulations and norms.
• Evaluated the feasibility drawings with respect to site condition and made necessary changes in coordination with mechanical and architect team to freeze final drawings
• Coordinated all works in accordance with Health & Safety requirements including on-site permit systems.
• Provided necessary information to the procurement department to enable the procurement of materials
• Directed the installation and commissioning of electrical equipment (Low Voltage Distribution System, Standby Power Systems, Lighting Systems, Fire Detection and Alarms, Voice Alarm & Public-Address Systems, Lightning Protection Systems, Earthing & Bonding Systems, …)
• Directed the installation and commissioning of Broadcast, Automation and ICT Equipment (IT, Multimedia, Pava, Operational, Security, Radio and Event Management Systems.
• Performed provisional acceptance testing activities to ensure that Electrical-Mechanical-Broadcast - ICT products/systems.
• Prepared bill of quantity and payment claim.

Project Manager à GURİS
  • Libye - Tripoli
  • novembre 2010 à juin 2011

My project: University of El Fattah Faculty of Dentistry, Technical Medicine and Pharmacy in Libya
• Managed site construction schedules, site construction activities and mobilization plans
• Involved in forecasting of construction resources, site facilities, equipment, machinery, staff, tools, laborers, materials and consumables to optimize resource utilization
• Evaluated progress, issues and action plans through various site/ project review meetings
• Defined/ ensured compliance to quality and safety plan at construction site. Involved in approval of site and construction related works and work permits
• Provided delivery management to ensure customer satisfaction and reference-ability
• Developed project plans and assumed responsibility for project profit and loss.
• Managed meeting notifications, distributed agenda/info, and tracked responses using Outlook, PowerPoint, and Adobe.

Electrical and I&C Chief Engineer (Engineering, Construction, Commissioning) à VALRESA
  • Turquie - Ankara
  • avril 2008 à novembre 2010

My Project: Paint Factory in Ankara - TURKEY, (40 thousand tons/year capacity)
• Directed the installation & commissioning and startup of instruments- electrical - automation and mechanical systems.
• Programmed 1400 I/O by using Delta V Emerson DCS software with Emerson supervisor
• Ensured timely completion of start-up and commissioning activities
• Developed controls logic for new systems.
• Diagnosed control system problems using manuals, schematics and various test equipment.
• Ensured effective and continuous operation of all control systems throughout the plant.
• Completed evaluation and modification of control systems including Delta V programs, resulting in increased system efficiency and safety.
• Performed daily and preventative maintenance and troubleshooting on plant-wide electrical- instrumentation mechanical systems.
• Planned- implemented - Evaluated Energy Saving Program
• Controlled work performance & monitoring work quality and taken corrective action to solve any problem rapidly
• Identified and resolved causes of equipment malfunction
• Consulted external vendor on technological upgrades

Instrument & Control Engineer à GAMA INDUSTRY
  • Turquie - Ankara
  • juin 2006 à janvier 2008

My project: CCR-Catalyst Continuous Regeneration Plant in Petroleum Refinery in Kırıkkale / TURKEY
 Interpreted blueprints, schematics, drawings, P&IDs and layouts to complete various instruments and associated
equipment installations.
 Tested, troubleshooted and calibrated equipment in the shop and in the field.
 Measured and read DMM, meggers, HART communicator, fluke 725, micrometers and thickness gauges using electrical and
mechanical testing instruments.
 Directed the installation&commisioning of electrical, Instrumentation, automation, IT Equipment
 Directed the installation of air tubing, impulse tubing & analyzer tubing as per related international specification
 Maintained, repaired and performed loop checks solenoid valves, control valves, gauges, regulators and various
transmitters.
 Controlled and monitored electrical and electro-mechanical equipment using Distributed Control Systems.
 Performed and coordinated safe work with fellow technicians and other crafts.

Instrumnet QA QC Engineer à ENKA
  • Kazakhstan
  • août 2005 à mai 2006

My Project: Tengiz - Chevron - Mobil (TCO) Petroleum Refinery
 Inspected on installation of Ex-equipments and associated accessories in potentially explosive hazardous atmosphere.
 Implemented factory acceptance test, site installation test, Site acceptance test, and approved check sheet of various
components of integrated Process Control& Safety System; DCS, ESD, UPS, Fire & Gas MCMS, HVAC Analyzer and
Communication System cabinets, consoles.
 Reviewing & approving Contractor’s inspection & test plan, work procedures and method statements.
 Implemented test equipment calibrations to enhance operational efficiencies of the systems.
 Accountable for witnessing Calibration, Installation, Loop Checking & Functional Tests of Pressure, Flow, Temperature, Level
instruments, Analyzers, Control / On-Off Valves, Fire & Gas Instruments, etc.
 Over saw the installation & testing of Electrical / Pneumatic Hook-Ups: Cable Routing, Laying, Segregation, Sealing,
Termination & Grounding Insulation Resistance & Continuity tests, OTDR Tests (FOC)
 Installation inspection of impulse tube, airline pneumatic air header as per hook-up and AFC Drawing & Inspection of
pressure testing /leak test of all pneumatic lines, impulse lines.
 Efficiently issued Non- Conformance & Site Inspection Reports for noncompliance activities against the approved quality
procedures, inspection test plans, codes & standards and closed out on satisfactory corrective / preventive actions
 Holds the credit of representing the company in final walkthrough, generation of punch lists, expedite timely close out as
per A, B and C categories.

Electrical Site Engineer à GAMA INDUSTRY
  • Arabie Saoudite - AlJubail
  • novembre 2004 à juin 2005

Directed the installation of electrical, Instrumentation, automation, IT Equipment
 Involved in Testing & Commissioning of Electrical-Mechanical-IT system

Construction & Maintenance Engineer à FERNAS
  • Turquie - Batman
  • septembre 2002 à novembre 2004

My project: 100 MW Diesel Power Plant with 154kV switchyard, DESOX and DENOX system
 Involved in installation&commisioning and startup of 154KV Gas Insulated Switch, Substation related HV/LV equipment
including DC System and earthing, Alternator, Power Transformer, Current Transformer, Voltage Transformer,
Disconnecting Switch/Earth Switch, Medium Voltage Switchgear Panels, Surge Arrester, Capacitor Banks, Control &
Protection Panels, AC/DC Distribution Panels, Lighting Systems, Lightning & Earthing Systems, Power & Control Cables
laying.
 Involved in installation&commisioning and startup of Flue Gas Treatment Unit Including DESOX (Desulphurization and
DENOX(Denitrification).
 Startup of power (100 MW) generation distribution system with auxiliary
equipments and Flue Gas Treatment Unit Including DESOX (Desulphurization and DENOX(Denitrification).
 Inspection, Supervision & Witness of Site Tests & Commissioning.
 Calculated and executed reactive and active power control.
 Supervised and monitor to ensure the smooth operation and maintenance of Diesel Power Plant with rating capacity of 100
MW power.
 Supervised the effective and efficient use of rotating equipment and machinery especially plant auxiliaries.
 Troubleshooted abnormal condition and prevented machine major breakdown
 Controlled and supervised boilers, motors, generators, and auxiliary equipment in power generating plants.
 Reviewed plant electrical related operational and equipment problems that result in poor performance, reduced
availability, loss of efficiency, and implemented solutions to the problem areas.
 Monitored to ensure that the instrument automation system is working normally and automatically.
 Maintained and operated 154/11 kV transformer, CTs/ VTs/Isolators, diesel motors, all boiler, etc.….
 Planned shutdown work and executed it within timelines and with proper manpower handling.
 Recorded the activities concerning preventive and corrective maintenance for future reference.
distribution system with auxiliary
equipment and Flue Gas Treatment Unit Including DESOX (Desulphurization and DENOX( Denitrification) .
• Inspection, Supervision & Witness of Site Tests & Commissioning.
• Calculated and executed reactive and active power control.
• Supervised and monitor to ensure the smooth operation and maintenance of Diesel Power Plant with rating capacity of 100 MW power.
• Supervised the effective and efficient use of rotating equipment and machinery especially plant auxiliaries.
• Troubleshoot abnormal condition and prevent machine major breakdown
• Controlled and supervised boilers, motors, generators, and auxiliary equipment in power generating plants.
• Reviewed plant electrical related operational and equipment problems that result in poor performance, reduced availability, loss of efficiency, and implemented solutions to the problem areas.
• Monitored to ensure that the instrument automation system is working normally and automatically.
• Synchronizing TG with Grid and Diesel generator both as per the requirement.
• Maintenance and operation transformer, diesel motors, all boiler and auxiliary
motors.
• Load management as per the demand and production.
• Maintenance and operation of switchyard of 154/11 kV transformer, CTs/PTs/LAs/Isolators etc.
• Planning shut down work and executes it within timelines and with proper manpower handling.
• Recorded the activities concerning preventive and corrective maintenance for future reference.

Founder à Ant Engineer
  • Turquie - Gaziantep
  • décembre 2001 à septembre 2002

Electrical design and contracting business. Quantity survey-BOQ-material cost analysis, preparation of technical
specifications & tender documents, method of statements, procurement and installation

Electrical / Project Engineer à 4. KOLORDU ISTIHKAM INSAAT TABURU
  • Turquie - Ankara
  • juillet 2000 à novembre 2001

Designed, İdentified, ordered and installed electrical system (Low Voltage Distribution, Lighting, Fire Detection and Alarms,
Voice Alarm & Public Address, Lightning Protection, Earthing & Bonding…) and IT equipments.

Éducation

Baccalauréat, Electrical and Electronics Engineer
  • à University of Gaziantep
  • mars 2000
Baccalauréat, Electrical And Electronics Engineering
  • à Gaziantep University
  • mars 2000

Specialties & Skills

Engineering
Instrumentation
Electrical Installation
Project Management
DCS Emerson Programming
Simaris Electrical Software
IEC Standards
VDE Standards
ETAP Electrical Software
BS Standarts
NFPA Standards
Ecodial Electrical Software
e Design Electrical Software
Aramco Standards

Langues

Anglais
Expert
Russe
Débutant

Formation et Diplômes

Emerson DCS Programming (Formation)
Institut de formation:
Emerson - İsanbul
Date de la formation:
July 2009
Durée:
80 heures