Operations Manager
ITC Company LTD
Total years of experience :7 years, 6 Months
Operations Manager (Dec.2014 to Feb.2015)
Responsibility:
Promoted company business (Surveys market needs/contacts customers/ provide solutions/presentation).
Conducted site visits to identify type of inspection needed.
Provide estimated cost & other requirements of proposed inspection service & quotation.
Supervised running NDT & inspection activities to assure job quality & adherence to customer requirements.
Prepared/sent inspection reports to customer & summarized lesson learned.
Short listed/contacted proposed sub-contractors for advanced NDT services.
Achievements:
Conducted marketing of OSI program to GNPOC, PDOC, Star Oil Operating companies.
Prepared Financing plan to purchase new MFL equipment.
Participated in EPF& Transit Line Baseline Inspection (OSI) Project proposal- Star oil Co. (Nov. 2014)
TPI Team Leader- PDOC Pipeline Repair Project (Oct.2013 to Feb.2014)
Responsibility:
Participated in WQT according to PDOC specifications, API 1104.
Supervised all repair activities through 3rd party’s inspectors including:
1- Repair points identification & verification according to Intelligent Pig report.
2- Point cleaning & thickness measuring & consequent type of repair (composite/ repair sleeve).
3- Contractor adherence to WPS & specified NDT methods specified depending on pipe temperature.
4- Coating application & Holiday test.
Analyzed deviations in repair quality & took rectification action required.
Reported repair status to PDOC & endorsement of required documents.
Achievements:
Safe in-service welding over (75ᵒ Celsius /50-70 bar) pipeline operating conditions.
Implementation of new MT technique on the lower have of repair sleeve Type-B.
1-Facility Engineer (Sept.2008 to Dec. 2012) - Production Dept.
Responsibilities:
Provided technical support for production field management in terms of umbrella & FIPs proposals stating scope of work, conceptual drawings, bill of quantities & bottom up cost estimates for small to medium modifications as per company standards and procedures.
Evaluated & negotiated bids & made recommendations for award.
Ensured availability of stock & direct charge materials by liaising with warehouse personnel and issuing to contractor.
Monitored execution of umbrella projects carried out by contractor to ensure adhering to HSE policies & procedures and detect deviation/delay and instructed contractor to take corrective action.
Liaised with other departments (P&F, Operation, GS) regarding expansion projects execution whilst adhering to company policies & procedures.
Reviewed testing & pre-commissioning procedures and witnessed pre-commissioning activities.
Coordinates between contractors & production operation section for project execution & commissioning activities whilst ensured safeguard of production continuity.
Participated in Factory & Site Acceptance Tests for new plant equipments.
Negotiated project variations with contractors and prepared relative documents for management approvals.
Usually participated in HAZOP studies.
Arranged for all administrative matters required by contractor/vendors including: security, accommodation, food, works permits.
Inspected completed projects & developed punch lists as well as necessary acceptance & completion certificates.
Ensured that "As- built" documents are completed, correct and submitted by contractor.
Investigated failure incidents to draw up root causes & provided recommendations for remedy & prevention.
Achievements:
Successfully executed 12 inch PW line in order to stop Adar FPF soil movement.
Successfully executed By-pass line to reduce back pressure on 2nd stage separators.
Participated twice in FAT for PW re-injection pumps conducted in Dalian- China.
2-Acting Maintenance Planner (Sep. 2008 to Ap. 2009) - As additional responsibility
Responsibilities:
Categorized maintenance activities according to internal & outsourced service suppliers.
Prepared annual preventive maintenance plan for Adar field (FSF & FPF) by coordinating with operation team & maintenance personnel to ensure practicable & achievable schedule plan.
Planned online & partial & major shutdown inspections & maintenance activities.
Followed up implementation of PM plan & applied corrective actions as needed.
Issued weekly, monthly, quarterly & annually progress evaluation reports.
Ensured availability of critical spare parts & consumables & planned for shut down spare parts.
Investigated equipments failure root causes to prevent future incidents & strengthen PM.
Achievements:
Established maintenance planning office in Adar field & prepared the first comprehensive PM plan.
Achieved 100% PM implementation.
3-Shadow Facility Engineer (Sep.2007 to Sep. 2008)
Responsibilities:
Provided technical proposals for modifications.
Supervised modification jobs while executed.
Coordinated expansion phase activities with contractor & consultant PMC.
Achievements:
Successfully executed draw off mission for export oil storage tank in CPF.
4- Developmental engineer (Apr.2006 to Sep. 2007)
Bachelor of Science (Honours) - Second Class Division One-GPA= 6.68 out of 10