Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
MUSTAFA ABBAS, COST ESTIMATOR

MUSTAFA ABBAS

COST ESTIMATOR·FAISAL BUILDERS & CONTRACTORS

Pakistan

Diploma, HVAC DESIGN AND DRAWING ANALYSIS

Work experience

Total years of experience: 36 years, 8 months

COST ESTIMATOR

January 2012 - Present

FAISAL BUILDERS & CONTRACTORS

Pakistan

January 2012 - Present

Analyze Drawings, B.O.Q. & specifications, proposals, and other documentation.
* Prepare time, cost, and labor estimates for projects.
* Review data to define material and labor requirements prepares itemized lists.
* Compute cost factors and prepare estimates used for management purposes like planning,
organizing and scheduling work.
* Prepare bids, selecting vendors or subcontractors and determining cost effectiveness.
Other Responsibilities:-
* To Make Break-Up Sheets from Tender Drawings & Documents.
* To Make B.O.Q. from Tender Drawings & Documents.
* To Prepare Cost-Multi-Services Sheet.
* To evaluate quoted price from Suppliers & Sub-Contractors.
* To Coordinate & negotiate with suppliers & sub-contractors for pricing in order to prepare best bid.
* Checking Quality and Compliance.
* Assist & Feed back to E & C Manager to prepare alternative bids if required.
* To Assist Estimation Manager & Estimation Coordinator.
* Take off from drawing & guide Quantity-Take-Off-Surveyor for correct taking off.
* To work cross-functionally with other departments like Design, Planning, Marketing and
Purchasing for tenders.

Company industry:
Construction & Building
Job role:
Engineering

QUANTITY TAKE-OFF SURVEYOR(PLUMBING,FIRE FIGHTING & HVAC)

August 2004 - September 2011

QUANTITY TAKE-OFF SURVEYOR

Sharjah, United Arab Emirates

August 2004 - September 2011

SHARJAH, U.A.E.
Main Job Responsibilities:-
 To Study Tender Documents and Drawings.
 To Take-Off Quantity from the Tender Drawings.
 To Take -Off Quantity and summarize details and file properly for Tender.
 To Make Break-Up Sheets from Tender Drawings & Documents.
 To Make B.O.Q. from Tender Drawings & Documents.
 To Prepare Cost Multi-Services Sheet.
 To Assist Estimation Engineer & Estimation Coordinator.
 To Co-ordinate with Design & Drawing Department.
Other Job Responsibilities:-
 To prepare Enquiry Letter for Suppliers.
 To follow up quotation from Suppliers.
 To feed BOQ in computer excluding prices
 To prepare Final B.O.Q. With the reference of MARK-UP SHEET.
(Note: Mark-Up Sheets prepared by Est. & Cost. Secretary)
 To keep Suppliers / Sub-contractors updated in address book.

Company industry:
Civil Engineering
Job role:
Mechanical Engineering

QUANTITY TAKE-OFF SURVEYOR(PLUMBING,FIRE FIGHTING & HVAC)

August 2004 - September 2011

GECO MEP

Sharjah, United Arab Emirates

August 2004 - September 2011

Main Job Responsibilities:-
 To Study Tender Documents and Drawings.
 To Take-Off Quantity from the Tender Drawings.
 To Take -Off Quantity and summarize details and file properly for Tender.
 To Make Break-Up Sheets from Tender Drawings & Documents.
 To Make B.O.Q. from Tender Drawings & Documents.
 To Prepare Cost Multi-Services Sheet.
 To Assist Estimation Engineer & Estimation Coordinator.
 To Co-ordinate with Design & Drawing Department.
Other Job Responsibilities:-
 To prepare Enquiry Letter for Suppliers.
 To follow up quotation from Suppliers.
 To feed BOQ in computer excluding prices
 To prepare Final B.O.Q. With the reference of MARK-UP SHEET.
(Note: Mark-Up Sheets prepared by Est. & Cost. Secretary)
 To keep Suppliers / Sub-contractors updated in address book.

Company industry:
Civil Engineering
Job role:
Mechanical Engineering

HVAC Technician

October 1994 - January 2004

A.B.M. COOL SERVICE

Karachi, Pakistan

October 1994 - January 2004

Installation, Service, Trouble-shooting and Overhauling Of:
 Window Type Unit from 1-2 Ton.
 Split Type Air Conditioning Unit from 1 - 3 ton.
 Refrigerator & Deep Freezer
 Psychometric Chart Calculations, Load Calculations, Duct Designing and also Installation of Single Phase and three phase wiring & different types of electrical panels.

Company industry:
Installation & Technical Services
Job role:
Maintenance, Repair, and Technician

First Class Electrician (Building),

December 1988 - August 1994

ADNAN ELECTRIC WORKS

Karachi, Pakistan

December 1988 - August 1994

 Installation, Maintenance and Service of Cable joint.
 Installation of :-
 Single and Three Phase Wiring
 Single and Three Phase Generators.
 Installation of Different Types of Electrical Panels.

Company industry:
Installation & Technical Services
Job role:
Construction and Building

First Class Electrician (Building),

December 1988 - August 1994

ADNAN ELECTRIC WORKS

Karachi, Pakistan

December 1988 - August 1994

 Installation, Maintenance and Service of Cable joint.
 Installation of :-
 Single and Three Phase Wiring
 Single and Three Phase Generators.
 Installation of Different Types of Electrical Panels.

Company industry:
Installation & Technical Services
Job role:
Construction and Building

Education

SKILL DEVELOPMENT COUNCIL

May 2012

May 2012

Diploma, HVAC DESIGN AND DRAWING ANALYSIS

Pakistan

GPA (percentage): 80%

GPA (percentage): 80%

HVAC DESIGN.LOAD CALCULATION.AIR CALCULATION WATER CALCULATION AND UNIT SELECTION
View attachment

DOMINO

September 2001

September 2001

Diploma, ILETS DOMO CLASS

Pakistan

ILETS DEMO CLASS
View attachment

Analog Institute & SBTE

December 1998

December 1998

Diploma, Industrial Electronics

Pakistan

GPA (percentage): 75%

GPA (percentage): 75%

CONTROL,DESIGN OF IND.ELECTRONIC EQUPIMENTS. INSTLLATION MAINT. AND CHECK.
View attachment

Analog Institute

December 1998

December 1998

Diploma, diploma in Computer Maintenance (C.M.D

Pakistan

GPA (percentage): 75%

GPA (percentage): 75%

COMPUTER HARDWARE.SOFTWARE.MAINT.SERVICE.UPGRADING.AND CHECKING.
View attachment

Y.M.C.A and S.B.T.E.

February 1996

February 1996

Diploma, REFRIGATION AND HVAC

Pakistan

GPA (percentage): 80%

GPA (percentage): 80%

Installation, Service, Trouble-shooting and Overhauling Of: Refrigetion and Hvac Equpiments  Psychometric Chart Calculations, Load Calculations, Duct Designing and also Installation.  Installation, Maintenance and Service of Cable joint.  Installation of :-  Single and Three Phase Wiring  Single and Three Phase Generators.  Installation of Different Types of Electrical Panels.
View attachment

GOVT ISLIMA COLLEGE & Karachi Board of Intermediate Education

March 1991

March 1991

High school or equivalent, PRE ENGEERING

Pakistan

GPA (percentage): 68%

GPA (percentage): 68%

PRE.ENGR. CEMISTARY,PHYSICS. MATH. AND GERNAL KNOLEGE.
View attachment

DEHLI BOYS SEC.SCHOOL &Karachi Board of Secondary Education

April 1987

April 1987

High school or equivalent, SECIENCE

Pakistan

GPA (percentage): 67%

GPA (percentage): 67%

SECIENCE.MATH.CHEMISTARY.PHYSICS.BIOLOGY.AND GERNAL KNOLOGE.
View attachment

Skills

Electrician
Expert
Electrician
Expert
Fire Fighting
Expert
Fire Fighting
Expert
Plumbing Design
Expert
Plumbing Design
Expert
HVAC Design
Expert
HVAC Design
Expert
MEP
Expert
MEP
Expert
COMPUTER SKILLS:  Word-Processing: MS-Word, Word Star  Spreadsheets: MS-Excel and Lotus  Langua
Expert
COMPUTER SKILLS:  Word-Processing: MS-Word, Word Star  Spreadsheets: MS-Excel and Lotus  Langua
Expert
BOOKS
Expert
BOOKS
Expert
CABLING
Expert
CABLING
Expert
DESIGN
Expert
DESIGN
Expert
ENGINEERING
Expert
ENGINEERING
Expert
GRAPHIC DESIGN
Beginner
GRAPHIC DESIGN
Beginner
MARK
Expert
MARK
Expert
MICROSOFT WINDOWS
Expert
MICROSOFT WINDOWS
Expert
TROUBLESHOOTING
Expert
TROUBLESHOOTING
Expert
TYPING
Expert
TYPING
Expert
WIRING
Expert
WIRING
Expert
ENGLISH LANG.
Expert
ENGLISH LANG.
Expert
BEST KNOWLEGE ABOUT HISTROY AND CURRENT AFIR
Expert
BEST KNOWLEGE ABOUT HISTROY AND CURRENT AFIR
Expert
Electrician
Expert
Electrician
Expert
Fire Fighting
Expert
Fire Fighting
Expert
Plumbing Design
Expert
Plumbing Design
Expert
HVAC Design
Expert
HVAC Design
Expert
MEP
Expert
MEP
Expert

Languages

English
Expert
Arabic
Beginner
Hindi
Intermediate

Memberships

YMCA

STUDY AND SPORT

November 1997

Training and Certifications

Certifications
HVAC DESIGN AND DRAWING ANAYLIS
Mar 2012
COMPUTER MAINT.
Jan 1998
ENGLISH LANG.
Jul 1989

Training
 One-year diploma in Industrial Electronics
ANALOGIS COMPUTER
Jan 1998
ILETS DEMO TEST
DOMINO
Jun 2001
ENGLISH LANG.
DOMINO
Feb 2002

Hobbies

  • TICK COLLECTION
    Ticks remain trapped in the flag fibres from which they will be subsequently picked up by means of tweezers and stored in eppendorf small tubes. n 2006 the minimum number of ticks, statistically significant for the analysis of each site was established to be 30: when in 100m2 tick abundance was lower, we extended tick collecting up to reach the minimum number.
  • STUDY HISTORY WATCH N.G.S.S. CHANNEL AND TEN SPORT
    STUDY HISTORY.LIST.MUSIC.WATCH DIS. & N.G.S.C. AND SPOR CHANNEL NEWS WITH FACT CHANNEL.SPORT. TRAVRLLING.WRITING.