Mechanical Site Engineer
INTERMAINT
Total years of experience :6 years, 11 Months
• Responsible for performance of the assigned site work.
• Responsible for technical control of the site.
• Coordinate all activities necessary for achieving the project scope of work.
• Resolve any problem / issue with client and/or consultant company.
• Organize and control the site activities.
• Plan and follow up the daily work activities.
• Respect the Client Specifications, regulations and rules.
• Lead all the man-power with Zero accident.
• Doing all the best effort to saving the Schedule progress.
• Corporate with the safety staff regarding the safe working.
Project description: Direct Reduced Iron Conveyor System in Ezzsteel Sadaat Plant.
The scope of work was erection the conveyor system that contain 2 Z Bucket Conveyors
and 5 Belt Conveyors that used to convey DR Iron to electric arc furnace and dedusting
system ( Ducts, Bag filter and Fan).
Project description: General Maintenance During Shutdown in SUEZ Cement Plant.
The scope of work was Steel modification in preheater tower and general maintenance in
Crushers, Stacker and Reclaimer.
Project description: Kiln and clinker cooler dedusting project in Kattameya Cement Plant.
The scope of work was Dismantle the old clinker cooler filter gravel system and install the
new system that including heat exchanger, new fabric filter, dust transport system, fan and
set of ducts.
Good (70%) Fourth year grade: Excellent Graduation Project: Computational modeling of non-equilibrium condensing steam flows in low pressure steam turbines Project grade: Excellent