Total Years of Experience: 12 Years, 4 Months
January 2014
To Present
Electrical Engineer
at rmc
Location :
Egypt
+12 years of experience Senior Electrical Engineer with experience exposing to the various
aspects of engineering and business practice., working in high quality electrical engineering
works (Residential, Commercial, etc), in site supervision works and technical
shopdrawings/materials reviews and T&C of all electrical works disciplines (HV &Low Current
systems)&Elevators& Escilators and Moving walks Fully awareness with the safety regulation
aspects of engineering and business practice., working in high quality electrical engineering
works (Residential, Commercial, etc), in site supervision works and technical
shopdrawings/materials reviews and T&C of all electrical works disciplines (HV &Low Current
systems)&Elevators& Escilators and Moving walks Fully awareness with the safety regulation
April 2017
To October 2017
Electrical Engineer
at 2Curves for Contracting and Importing
Location :
Egypt
1 Study More than 10 Projects (Sending RFQ -review PQ -analysis costs -Pricing )
2- Make surveys-Progress Bill -Shop drawing -Asbuilt Drawing-Price Analysis -MRI-RFI
3-Supervise 2 Projects (Cib Aracdia Branch-AIBK Sporting Bracnh)including (Power Distribution -Light Current systems (CCTV-Fire Alarm-Fire Fighting -Qmatic -Computer Systems -Acces Control)- HVAC(Chilled water-DX)
4- PerForem SAT to Ensure the Proper Function of all Systems
ElMo3assah ElMoteheda for Engineering and Trading
2- Make surveys-Progress Bill -Shop drawing -Asbuilt Drawing-Price Analysis -MRI-RFI
3-Supervise 2 Projects (Cib Aracdia Branch-AIBK Sporting Bracnh)including (Power Distribution -Light Current systems (CCTV-Fire Alarm-Fire Fighting -Qmatic -Computer Systems -Acces Control)- HVAC(Chilled water-DX)
4- PerForem SAT to Ensure the Proper Function of all Systems
ElMo3assah ElMoteheda for Engineering and Trading
October 2016
To March 2017
Electrical Engineer
at المؤسسة المتحدة للهندسة و التجارة
Location :
Egypt - Cairo
Upgrade and Reinstall All electrical Panels for Cairo Governorate.
•Review the PM schedules for all electromechanical Systems of Sheikh Zayed Hospital.
•Monitor and Evaluate the Performance for all ElectroMechnical Systems in the Hopsital including (MV Ring Unit- Diesel GenSet - Transformers-Auomatic Power Factor Correction Panels-Ats Panel -UPS - Chillers -Steam Boilers).
•Lead Staff of 18 Technicaians for Maintenace of Sheikh Zayed Hospital.
•Review the PM schedules for all electromechanical Systems of Sheikh Zayed Hospital.
•Monitor and Evaluate the Performance for all ElectroMechnical Systems in the Hopsital including (MV Ring Unit- Diesel GenSet - Transformers-Auomatic Power Factor Correction Panels-Ats Panel -UPS - Chillers -Steam Boilers).
•Lead Staff of 18 Technicaians for Maintenace of Sheikh Zayed Hospital.
April 2014
To September 2014
Electrical Engineer
at AboELHassan Company for Ophthalmic Equipmen
Location :
Egypt - Cairo
Managed installation, maintenance and distribution of ophthalmic equipment (auto Refractometer, slit lamps, and ophthalmic units) across Egypt and team consist of two Technicians.
January 2013
To March 2014
Electrical Engineer
at Abidos Industrial Gasses Co
Location :
Egypt - Sohag
Prepared and implemented condition based maintenance to increase equipment effectivenessin addition to applying Preventive maintenance (PM), and repaired major electrical problems and diagnoses mechanical and hydraulic systems.
•Scheduled work for team of technicians at shifts to observe temperature, pressure and ampere readings. Monitored Fractional Distillation and turbo expanders and adjusts controls or overrides automatic controls to obtain specified operation of equipment
Experiences
•Check the wire conection controls panels, motors and oil level to avoid breakouts saving Maintenance Costs.
•Assure the Setting of all timers and overloads and other electrical components (undervolatage-over Current).
•Monitored team of 8 technicians to repair main electric control panel by changing faulted circuit breakers
•Organized with a team of 8 technicians and craft people to repair air compressor by replacing broken pistons and valves.
Best Achievement
•Evaluated the need for new turbo Expander (Capital Expense). Review technical practices for assuring maintainability of Turbo Expander and parts and submits evaluation for management decision.uses “Chem Sep” software
•Make study for the Economy of balancing load across three phases of the Factory so asto reduce the Power consumed
•Scheduled work for team of technicians at shifts to observe temperature, pressure and ampere readings. Monitored Fractional Distillation and turbo expanders and adjusts controls or overrides automatic controls to obtain specified operation of equipment
Experiences
•Check the wire conection controls panels, motors and oil level to avoid breakouts saving Maintenance Costs.
•Assure the Setting of all timers and overloads and other electrical components (undervolatage-over Current).
•Monitored team of 8 technicians to repair main electric control panel by changing faulted circuit breakers
•Organized with a team of 8 technicians and craft people to repair air compressor by replacing broken pistons and valves.
Best Achievement
•Evaluated the need for new turbo Expander (Capital Expense). Review technical practices for assuring maintainability of Turbo Expander and parts and submits evaluation for management decision.uses “Chem Sep” software
•Make study for the Economy of balancing load across three phases of the Factory so asto reduce the Power consumed
November 2011
To December 2012
Electrical Engineer
at Tibaherbs
Location :
Egypt - Cairo
Under the direction of Assistant Factory manager, primarily responsible in organizing, factory electrical maintenance repair and revision works in the safest, efficient method of supervision.
• Performed test of electrical systems to ensure safety, reliability, quality and sustainability.
Experiences
•Increased productivity by assembling production line with two technicians by adding half hollow tubes to link machines.
•Suggested manager and assessed team to install a new herb drying machine to increase production capacity
•Check cables connection controls panels, motors and oil level to avoid breakouts and assure the Setting of all timers, overloads and other electrical components
•Implemented regularly scheduled testing, maintenance, and preventative maintenance of electrical equipment
Best Achievement :Design display panel for factory production line with technical team to supervise 10 machines
• Performed test of electrical systems to ensure safety, reliability, quality and sustainability.
Experiences
•Increased productivity by assembling production line with two technicians by adding half hollow tubes to link machines.
•Suggested manager and assessed team to install a new herb drying machine to increase production capacity
•Check cables connection controls panels, motors and oil level to avoid breakouts and assure the Setting of all timers, overloads and other electrical components
•Implemented regularly scheduled testing, maintenance, and preventative maintenance of electrical equipment
Best Achievement :Design display panel for factory production line with technical team to supervise 10 machines
Share on Facebook
Share on Twitter
Share Via Email