Electrical & Instrumentation
Hong Dat Engineering(P)ltd
Total years of experience :23 years, 4 Months
Planning, implementing and monitoring work Schedules in according to Master Schedules Programmed,
Prepare and study technical drawings, specifications of electrical systems, and to ensure that installation and operations as per customer requirements. (Compile with CP -5 codes),
Design Shop Drawings based on Customer Requirements for Installation,
Design Council Conduit Drawing for Slab/ floor- Light /Power Installation. Closely monitor Slab /Floor for Typical Installation,
Prepare Precast drawing for Electrical Conduit Pipe Installation,
Preparation of EHS Doc. RA, SWP, MOS, Monthly Inspection report,
Underground System Design -SP & IDA- COPIF Implementation, - (Ele/Tele)
Fire alarm System Design & Implementing with Compile CP - 10,
Cable Support System & Cable routing design with cost effectively,
(Trunking /Tray /Ladder)
Electrical DB /SOA Design Based on Electrical Load requirements
Implementation of Earth mat system and Lightning arrester system.
(Compile: CP 16 & CP 33)
Testing & Commission Panel Boards & Switch Gear.
Arrange for SP & HDB Testing Doc Preparation & Submission,
Preparing monthly & weekly work schedule based on Micro Programmed.
Prepare monthly Progress Claim Report, / VO Submission.
Coordinate with Consultant & subcontracts,
Electrical Installation Fully Monitor Closely Supervision
Liaises with Subcontracts’ LEW, M&E, Consultants, RTO
Submission for Government Authorities for Project Related Doc. (SP, HDB, NEA, LTA).
Handle with effective Cost controlled, with Time to complete
titles @duties, each discussed below,
•Planning, implementing and monitoring work Schedules in accordance to Master Schedules,
•Prepare and study technical drawings, specifications of electrical systems, and to ensure that installation and operations as per customer requirements / Compile with CP codes )
•Preparation of EHS Doc. (RA, SWP, MOS, Monthly Inspection report).
•Under Ground System ( Electrical / Telecom )
• Cable Support System Design & cable routing design.
•Electrical DB Design according to the Electrical Load.
•Preparing monthly & weekly work schedule based on Master Program.
•Testing & Commission Panel Boards Switch Gear
•Implementation of Earth mat and Lightning arrester system. CP & SS
•Prepare monthly Progress claim Report,
•Well understanding the Construction drawings.
• Design Single Line diagrams & P&I Control diagrams ( Sequence Control System ),
•Arrange for SP GRID & HDB testing,
•Coordinate with Consultant & subcontracts,
•Liaises with Subcontracts’ LEW, M &E Consultants, RTO, and Government Authorities for Project Related (SP, HDB, NEA, LTA).
Planning, implementing and monitoring work Schedules in accordance to Master Schedules,
Prepare and study technical drawings, specifications of electrical systems, and to ensure that installation and operations as per customer requirements / Compile with CP codes )
Preparation of EHS Doc. (RA, SWP, MOS, Monthly Inspection report).
Under Ground System ( Electrical / Telecom )
Cable Support System Design & cable routing design.
Electrical DB Design according to the Electrical Load.
Preparing monthly & weekly work schedule based on Master Program.
Testing & Commission Panel Boards Switch Gear
Implementation of Earth mat and Lightning arrester system. CP for SS
Prepare monthly Progress claim Report,
Well understanding the Construction drawings.
Planning, implementing and monitoring work Schedules in accordance to Master Schedules,
Prepare and study technical drawings, specifications of electrical systems, and to ensure that installation and operations as per customer requirements / Compile with CP codes )
Preparation of EHS Doc. (RA, SWP, MOS, Monthly Inspection report).
Under Ground System ( Electrical / Telecom )
Cable Support System Design & cable routing design.
Electrical DB Design according to the Electrical Load.
Preparing monthly & weekly work schedule based on Master Program.
Testing & Commission Panel Boards Switch Gear
Implementation of Earth mat and Lightning arrester system. CP for SS
Prepare monthly Progress claim Report,
Well understanding the Construction drawings.
As I have eligibility Electrical Engineer with ( 7years) Experience, I am interested to apply M&E Engineer job. If you give that opportunity to me, I will work with my full effort and efficiently. Please consider my request . Here attachment My CV for your reference
Bukit Batok industrial Estate. -Singapore.
Project Handled:
•HDB - Punggol East 39 B - ( 1056 units / 2 ESS - 11kv / 1 MSCP) (Current on Going Project
Blossom Residence -Bukit Panjang ( All Electrical Installation)
HDB -1057 units / MSCP / 2 no-ESS - 11kv / ) (Electrical Installation /ELV/Fire system.
Pollchi.
Projects: DHDT / Diesel Hydrodesulphurization / Hydro treating.
Field of Interest:
Area of work : Electrical Project ( Commercial - Changi Civil Service Club )
Period : 1.03.2014 to 10.08.2015
Place : 41, Senoko Drive,
Singapore 758249 .
:
: