Total des années d'expérience: 3 Années, 8 Mois
février 2015
A juin 2016
Maintenance Supervisor
à Coya Spa, Citadel Properties
Lieu :
Émirats Arabes Unis - Sharjah
I am having work experience upto one and half years in Sharjah Emirate.
Since the project spa is not under operation, construction carrying out in Dubai. My current responsibility is
Maintaining records for the shipment receiving, updating the inventory details, inspecting site visits, preparing reports based on the site visit.
Now working in head office.Working in purchase department.
Since the project spa is not under operation, construction carrying out in Dubai. My current responsibility is
Maintaining records for the shipment receiving, updating the inventory details, inspecting site visits, preparing reports based on the site visit.
Now working in head office.Working in purchase department.
mai 2013
A mai 2014
Project Assistant
à Hindustan Latex Limited Life Care Limited
Lieu :
Inde
I worked as Project Assistant in HLL Life Care Limited.I was working in a new project "EMILY".EMILY is a intra-uterine device used in female for controlled bleeding and preventive child birth, for the purpose of family planning.
My role was to look on to production section of the device.It starts from production, manufacturing, assembly, and fabrication of the device.Batch coding procedure and dispatch was also involved in our work structure.
My role was to look on to production section of the device.It starts from production, manufacturing, assembly, and fabrication of the device.Batch coding procedure and dispatch was also involved in our work structure.
janvier 2012
A février 2013
FreeLancer
à Ace India Consultancy Private Limited
Lieu :
Inde - Bengaluru
• ST.PHELOMINA HOSPITAL BANGLORE \{Duration: one year, 2012-2013)
• Chill Water Double Skinned Air Handling Units
• 40000CFM X 1 No, 30000CFm X 1 No, 15000CFM X 1 No
• Complete with 3 layer filteration of prefilters, Fine Filters and HEPA modules, Al. Ducting, and CHW Piping with accessories and insulation
Responsibilities Handled
• Review the contracts documents (HVAC specification & concept) and advise the construction manager of any deficiency.
• Calculating the design heating & cooling load of proposed building for HVAC and submit to consultant/client for review & approval.
• Prepare HVAC Drawings(HVAC Plan, section, schematic) respect to design requirements and contract requirements with coordination of other disciplines and submitted as per the approved schedules to the consultant/client for review &approval.
• Sheet metal delivery and inspection of materials.
• Executing the project.
• Site Meeting with consultants and clients.
• Time scheduling for projects.
• Quantity and cost estimation for the project.
• Preparation of monthly reports for projects.
• Chill Water Double Skinned Air Handling Units
• 40000CFM X 1 No, 30000CFm X 1 No, 15000CFM X 1 No
• Complete with 3 layer filteration of prefilters, Fine Filters and HEPA modules, Al. Ducting, and CHW Piping with accessories and insulation
Responsibilities Handled
• Review the contracts documents (HVAC specification & concept) and advise the construction manager of any deficiency.
• Calculating the design heating & cooling load of proposed building for HVAC and submit to consultant/client for review & approval.
• Prepare HVAC Drawings(HVAC Plan, section, schematic) respect to design requirements and contract requirements with coordination of other disciplines and submitted as per the approved schedules to the consultant/client for review &approval.
• Sheet metal delivery and inspection of materials.
• Executing the project.
• Site Meeting with consultants and clients.
• Time scheduling for projects.
• Quantity and cost estimation for the project.
• Preparation of monthly reports for projects.
Partager sur Facebook
Partager sur Twitter
Partager via Email