Project Manager
Mohammad Al-Ojaimi Contracting Est.
Total years of experience :10 years, 8 Months
Awards & Certificates :
✓ 2020: SEC approved as construction Manager for AL Mansoriyah 110/13.8 KV Substation.
✓ 2020: Solar Photovoltaic Installer certificate by Saudi Electricity Company (SEC).
✓ 2018: PMP certified. Certificate # 2150724
✓ 2018: Certificate of appreciation form ISOLUX CORSAN (For Project AL Uqair
115/13.8 KV Substation A & B).
✓ 2018: Appreciation letter from Al Sharif Group & KEC LTD. (For Project Support
Industries 115/33KV Fardhynia).
✓ 2017: Project Management Institute approved membership # 4363944.
✓ 2016: Receive competent person card C1/380KV from SEC (NG) and became
authorized work permit receiver, card # 643292.
✓ 2015: ABB awarded with certificate of appreciation for SVC al Ghazalah project as a
subcontractor Site manager for completing project on time without major noticeable safety issue.
✓ 2014: SAUDI COUNCIL OF ENGINEERS awarded with certificate of accreditation as a
certified Electrical Engineer # 249038.
✓ 2013: PAKISTAN ENGINEERING COUNCIL approved as a certified Electrical Engineer,
Registration # Electrical/38847.
Work Position: Construction Manager
(March 2020 - Continue)
Project Name : Construction of 115/13.8 KV Al Mansoriyah Makkah Substation
Main Contractor : Mohammad Al-Ojaimi Contracting Est.
End User : SEC
Work Position: Project Manager
(October 2019 - Feb 2020)
Project Name : Cable tray replacement at Ship loaders at SabTank
Main Contractor : Mohammad Al-Ojaimi Contracting Est.
End User : SABIC
Work Position: Project Manager
(February 2019- September 2019)
Project Name : Cables replacement at Safaniya Power Plant
Main Contractor : GRUPO MAESSA
End User : ARAMCO
Key Duties & Responsibilities:
✓ Initiating, planning, Execution, monitoring and controlling & closing the project.
✓ Managing the projects stakeholders.
✓ Managing the project baselines i.e. Cost Baseline, Schedule Baseline and Scope Baseline.
✓ Project resource Management.
Work Position: Project Engineer
(July 2018- January 2019)
Project Name : OHL modification at Haradh & Hawiyah
Main Contractor : HARBICO
End User : ARAMCO
Duties & Responsibilities:
✓ Managing the Project procurement and execution.
✓ Procurement involves selection of vendors from the 9.com, comparing the required material, equipment or any other resource manufacturing standards with Aramco standards and submitting to Saudi Aramco for Approval.
✓ Coordination with QA/QC starting form initiating procurement till final inspection at the work location.
✓ Preparing the method of statements for the work to be executed at the site.
✓ Preparation of work schedules.
✓ Managing the site team for work progress.
✓ Attending weekly, monthly site progress meetings with client and site team.
✓ Project status reporting as per cost, scope and schedule baseline to the higher management.
Working as a Projects Engineer with MEDMAK International Company on ABB & ISOLUX CORSAN (SEC) projects, details are:
ABB: Replacement of 8 No. of 230 KV Bulk oil circuit breaker and its associates at FARAS PP AL HASSA complete civil and installation works.
ISOLUX CORSAN: Construction of 115/13.8 KV substation installation & testing commissioning works at Al-Uqair Dammam.
My responsibilities are as follows:
Preparation of projects activities schedules and method of statements using MS Project, MS Excel and MS word.
Preparation and submission of material submittals for SEC approval.
Dealing with the client, sub-contractors and material suppliers.
Preparation of required material BOQ, generation of RFQ from the installation drawings.
Providing technical support at the site and suggesting appropriate solution to the problems.
Taking care of extra and reworks being done at sites.
Monitoring daily sites progress, requirements and invoicing.
Completion of the project on time with in the budget and
Complete assistance to the Project managers.
Bidding for new upcoming projects.
ABB 132KV/14.3KV SVC(Static Var compensator) Al-Ghazalah Hail(October 2014 to MAY 2015)
Handling site petty cash, arranging material, tools, manpower and site documentation, pressure handing, coordination with client and sub-contractors plus out of site workers issues problems and solutions. Technical achievements are as follows.
1. All outdoor work TSC (Thirstier Switched Capacitors), TCR (Thirstier Controlled Reactors) CF (Capacitor Filters), All Aluminum busbars(132KV and 14.3KV), Aluminum cable connections disconnectors, earth switches, CTs, junction boxes etc. installation.
2. Thirstier valves and pump units installation in indoor pump and valve rooms.
3. Cable lying through ducts and outdoor Junction boxes, CTs, VTs S.A, S.C termination etc.
4. Power TFs complete Assembly, Auxiliary TFs installation MV cable lying and termination supervision.
5. All indoor work in new and Existing SS 8916(remote end), All kind of Panels protection, control, SWGR, ACDC DB, Battery banks cable tray work, cable laying and termination.
6. By helping and coordination with testing and commissioning the project got energized on 30th of MAY 2015.
ABB SS 8907 Hail and remote end SS 9030 Hail
1. Along with Ghazalah project I also looked after SS 8907 for almost one month to clear final snag list from 20th of April-15 to 10th of May-15 up till energization.
2. SS 9030 Hail remote end is still on going under my supervision.
3. My job in both above descriptions (point 1&2) is to manage manpower, tools, coordination with client, monitoring work progress on daily basis and progress report to the management.
ABB 132KV/13.8KV substation at Bani Sar Al-Baha (July 2014 to September 2014).
Achievements are as fellows
1. Remaining Fiber optical cable trunking installation, and laying
2. Grounding works (All equipments, cable tray jumpers and remaining panels )
3. Modification works as per revised cable laying schedule from ABB.
4. All kind of documentation and resources management for the work progress.
DCS (Dust Collection System) project at Al-tuwarqi National Steel company (NASCO) Dammam second industrial area(March 2014 to Jun 2014).
1. All Electrical Erection work, electrical panels and Junction boxes installation at heights,
2. Cable tray, control and power cable lying and termination at heights
3. Lightening conducting and all Grounding work with commissioning cooperation were completed under my supervision.
4. Handling all site documentation and cash flow for tools and site requirements.
I worked as an internee in the mentioned firm for only 8 weeks.
I did Bachelor of Science in electrical Engineering from HITEC University Taxila Pakistan with CGPA 2.80/4 in First division during academic year 2009-2013.It is a general including all major subjects of Electrical Power, Electrical Telecom and Electrical Electronics.