senior Project Engineer
Arabtec
مجموع سنوات الخبرة :20 years, 1 أشهر
MTB
Abu Dhabi international Airport- New Terminal
Budget: 9.6 billion
December 2010 - Present: Arabian Construction Company (ACC)
"Section engineer"
• SWSR in Liwa
Description: Stratigic Water Storage and Recover project in liwa
Consultant: GIZ Doner.
Budget: 1, 600, 000, 000 dhs
Contents: pump station, power station, well field contains 432 wells, and 161km pipeline
April 2004- Nonember 2010: BIN HARMAL CONTRACTING & IRR, Abu Dhabi, UAE
"Project engineer"
• AL MURJAN TOWER
Description: Construction of BIN HAMOODAH TOWER in passport rd.
Plot C 45 sec. E4/02 Abu Dhabi.
Consultant: DEWAN ARCH & ENGR.
Budget: 85, 000, 000 dhs
Contents: 3 basements + ground floor + mezzanine + 15 typical + Mechanical+ roof + top roof.
• AL DHAHIRI TOWER
Description: Construction of H.H. AHMAD AL DHAHIRI TOWER in
Plot C 30 sec. W4/1 Abu Dhabi.
Consultant: HEBERGER CONSULTING
Budget: 73, 000, 000 dhs
Contents: 3 basements + ground floor + mezzanine + 15 typical + Mechanical +roof + top roof.
• AL NAYADEE TOWER
Description: Construction of H.E. HEMED AL NAYADEE TOWER in
Plot C 29 sec. W4/1 Abu Dhabi.
Consultant: HEBERGER CONSULTING
Budget: 68, 000, 000 dhs
Contents: 3 basements + ground floor + mezzanine + 15 typical + Mechanical + roof + top roof.
• AL SHAMESI BUILDING
Description: Construction of H.E. MOHAMMED AL SHAMESI BUILDING in
Plot E 15 Abu Dhabi.
Consultant: SYRCONSULT.
Budget: 16, 000, 000 dhs
Contents: Ground floor + mezzanine + 5 typical + roof.
June, 2003 Bachelor of Civil Engineering, Major: building and construction engineering- 6 October University GRADUATION PROJECT: Design and built multi story building, based on bearing pile with concrete skeleton, and anti earthquake core walls.