Senior Electrical Engineer
Austroplane
Total years of experience :6 years, 8 Months
- Lead the electrical engineering team on-site and coordinate with other engineering disciplines to ensure seamless integration of electrical systems.
- Develop and oversee the implementation of electrical designs, ensuring they comply with project specifications, codes, and standards.
- Collaborate closely with project managers, contractors, and stakeholders to ensure timely completion of electrical tasks within the construction schedule.
- Manage the installation, testing, and commissioning of electrical equipment and systems, including power distribution, control systems, and instrumentation.
- Troubleshoot and resolve any electrical issues that arise during construction, minimizing downtime and maintaining project progress.
- Conduct regular inspections and quality checks to ensure electrical work meets safety and quality standards.
- Review and approve electrical designs, drawings, and specifications to guarantee accuracy and alignment with project goals.
- Provide technical guidance to the construction team and oversee the work of contractors and subcontractors.
- Collaborate with procurement teams to ensure timely delivery of electrical equipment and materials.
- Prepare and present regular progress reports to project leadership and stakeholders.
• Manage all Pre-commissioning & Commissioning activities (Preparation: Schedule and documentation, Execution and reporting) for all electrical scope.
• Estimate tools, equipment, consumables, spare parts and temporary equipment requirements for the Pre-commissioning & Commissioning for all electrical scope.
• Ensure the clearance of punch lists Type A before the commissioning of the system / equipment concerned.
• Prepare and follow the different site reports (weekly / Daily report, NCR, punch list, commissioning progress…).
• Preparation of End-of-Erection Certificates & RFIO (Ready For Initial Operation).
• Prepare, schedule and conduct for start-up protocol (MER); non-load test (NLT), load test (LT), Industrial production test (TPI), Performances test (EP).
• Provisional Acceptance Certificate (PAC)
• Site supervision during the warranty period.
- Led the planning, coordination, and execution of EIA integration and erection activities for SNEF industrial projects, ensuring compliance with safety protocols and project schedules.
- Collaborated with cross-functional teams to interpret technical drawings and develop comprehensive erection plans, resulting in efficient installation and commissioning.
- Managed on-site erection teams and coordinated with contractors and suppliers to ensure timely delivery of equipment and materials.
- Conducted regular inspections and quality checks, identifying and resolving technical challenges to minimize project disruptions.
- Implemented rigorous testing procedures, leading to successful system calibration and commissioning phases before project completion.
- Documented all erection activities, progress reports, and technical details for comprehensive project documentation.