Total years of experience :9 years, 9 Months

Project Manager at ZTE
  • Saudi Arabia - Riyadh
  • March 2015 to August 2015

Mobily DC System Project Manager (Last Position):

• Managing Mobily POs of DC installation after receiving the JAF.
• Managing installation of DC system in the region.
• Managing Batteries installation before HO.
• Managing all the invoicing system ( NAS ).

Business Development at ZTE
  • Saudi Arabia - Riyadh
  • January 2014 to March 2015

ICT Department(Business development)- Technical & Management support :
In charge of creation solution for IT & telecommunications integration department for enterprise project, I have been engaged with the following:
• Identifying the possible and best technologies to the costumer ( IT & telecommunications ).
• Develop & Manage costumer expectations.
• Review and reply to Request for Proposal (RFP) in technical wise to seek different costumer solutions and standard.
• Extract project target and matching with company strategies.
• Support in technical and financial proposals creation.
• Support in CAPEX.
• Project Implementation plan development ( high and low).
• Project work processes creation to be shared with subcontractor.

Quality Manager at ZTE
  • Saudi Arabia - Riyadh
  • December 2012 to January 2014

Quality Manger (QA&QC) Multi-Project

• Implement and improve quality assurance plan for network installations ( STC + ZAIN ).
• Coordinating with costumer for Quality standard and measurement criteria.
• Perform audits on QIR & SIR after submission and perform random inspection for assurance.
• Ensure quality reporting provides clear evidence and proper documentation that the standard of quality is actually achieved at the end of the project.
• Ensure all the installation and configuration parameters are matching with approved standards and parameters.
• Acceptance procedure following to insure the readiness of the sites before call for Final Acceptance.
• Managing CR and CC through project life.
• Managing Resources borrowing.

Implementation Manager at ZTE
  • Saudi Arabia - Eastern Province
  • October 2012 to December 2012

STC-LTE
Work as Implementation Manager by following subcontractor installation and commissioning progress (4G antenna, RRUs, Fibers, BS …etc) and follow driving main Fiber link from Exchange to Terminal BS by follow CWO, support in troubleshooting .

Skills:
 Management skills.
 Fiber CWO.
 BS integration.
 MW configuration and alignment.
 LTE parameters.
 Troubleshooting for LTE equipment

Implementation Manager at ZTE
  • Saudi Arabia - Eastern Province
  • July 2010 to October 2012

Worked as Implementation Manager managing and controlling subcontractors in CIVIL and TELECOM work until the site become On Air, Check with subcontractor the excavation for tower foundation until tower erection and painting, then follow TELECOM equipment installation (antenna - RRU - Fiber - BS - MW antenna - BS integration - environmental alarms configuration - replacement of faulty equipment, provide accurate and meaningful tracking report to PM .Then worked as PAT Manager by creating schedule for PAT and following PAT progress and OILs clearing with subcontractors until the site delivered to costumer.

Skills:
• CIVIL supervision
• BS installation and integration (from terminal and from NetNumen WIMAX OMM-B server)
• Site Acquisition (site survey, candidate selection, SCECO following ….etc)
• MW equipment configuration and alignment (STM-1 and STM-4)
• MW NMS drawing and controlling for Alarm monitoring (NEC)
• Switches configuration for Remote Access.
• Pre-PAT and PAT scheduling and controlling.
• Management Skills.
• Maintenance skills.

Transmission engineer at Saudi Ericsson
  • Saudi Arabia
  • January 2010 to June 2010

Saudi Ericsson January 2010- June 2010
Transmission engineer (Optical Fiber and MW)
• SAUDI ARABIA

O&M at THALES
  • Saudi Arabia - Riyadh
  • March 2009 to December 2009

THALES, Mobily RIYADH, March 2009-December 2009
Work as contractor with MOBILY (ALDANA) for O&M in Fiber connection.
Install new Fiber Cable (G652D, G655 and G656) inside manhole and connect terminal cable to each other using closures (12-24-48-96 fibers) then testing the splice points and light path in terminal sites using OTDR. Connect Fiber in terminal site to (ODF) . Then connect it using patch cords to FPP according to design (SRO) then connect it to Cisco Rack (WSS, DMX) . Install transponder cards and connect patch cords to FPP of Shelf and FPP of client (HUWAWEI, ERICSSON, etc)
Connect PC to TCC and print card, Shelf and link status using CTC software.
Check link quality and BER using MTS8000 then do PAT for link.
Work in O&M for fiber in links problem (loss, downtime, fiber cable cut, BER, etc)
• SAUDI ARABIA

Site Engineer, O&M engineer and project coordinator at HICAP, RIYADH
  • Saudi Arabia - Riyadh
  • March 2008 to March 2009

HICAP, RIYADH, March 2008 - March 2009.
Site Engineer, O&M engineer and project coordinator.
In-charge of Team day-to-day movement during installation process Primary support on other teams installation, commissioning & testing problems when escalated.
Ensures that system will be fully ready for commercial operations (includes antenna azimuth aligning, cable sweep testing, BER Testing, microwave links tributary patching thru /drop & inserts according to engineering plan, external alarms simulation &clearing)

ERICSSON,
Installation, Commissioning, Troubleshooting, Operation and Maintenance of Ericsson RBS 2206,
Version, installation of cabinets, feeders antennas (dual band),
Configuration of 2G RBS as per data configure for preparation to integration, Participate in PAT for 2G, Transmission equipments. Installation, Commissioning and Troubleshooting of Ericsson RBS ( (3206, 3202) . Edit script using ultra edit, transfer RBS data using total commander, loading of script for new sites, Installation of DF, E1 cables for the expansion
Installation, Commissioning, Troubleshooting, Operation and Maintenance of Ericsson Minilink, TN (6P, 20P)


HUWAWEI,
Installing of new HUWAWEI BTS 3012 all configurations and integrating it. Install feeder cable of all size and install GSM Antenna. Installing the MICROWAVE Antenna All sizes (1+0, 1+1HS, 1+1SD, 1+1TWIN-PATH FD, 1+0 XPIC, 1+1 XPIC) with alignment. Install the IDU NEC series (SDH-PDH) and do configure it for alignment and integrate it to be ready. maintenance engineer and teams coordinator looking for team's problems in construction and troubleshooting especially in alignment and Fodder problems (VSWR) and the problems in alarms systems (INDOOR AND OUTDOOR ALARMS). Interfaces with OMC/NOC/MSC during integration / RBS site initialization process & fault clearing. Ensures that feeder cables, GSM antenna panels, hardware, indoor and outdoor (lower & tower top portions) are installed according to specifications and standards.Ensures that installation process follow the projected time table. Initiates escalation on problems to higher level whenever encountered and rectify and commissioning.
Installation of HUWAWEI BSC 6000 under knowledge of system and subsystem architecture and principles and network extend for capacity and QOS.
Knowledge with 2G interfaces in BSS and CN.
Experience in install HUWAWEI BTS3812E, BTS3812A, BTS3801, 3802, 3803, BBU3806, RRU3801 for WCDMA (3G) as required configuration.Ability to Install HUWAWEI RNC BSC6800 under knowledge of system and subsystem architecture and principles.Ability to use BAM and LMT software for alarms filtering and how to clear it.Ability to use BSC6000 software for browsing and filtering.
Knowledge with 3G interfaces In RNS and CN.
Worked as PAT, CUTOVER and troubleshooting official.
• SAUDI ARABIA

Site Engineer at Local Phone Networks
  • Saudi Arabia - Riyadh
  • January 2008 to March 2008

ALTAQNIAH, RIYADH, January 2008 - March 2008
Worked with Altaqniah Company for TELECOM in Local Phone Networks for 3 months in installing new lines and maintenance of lines. Installing DSL lines and maintenance of lines
• SAUDI ARABIA

Maintenance engineer at SHATHA, KHARJ
  • Saudi Arabia - Alkharj
  • August 2005 to May 2007

SHATHA, KHARJ, August 2005 - May 2007
Worked in Shatha Institution for telecom in Mobile maintenance for 20 months
• SAUDI ARABIA

Maintenance Engineer at Aldosari Foundation
  • Saudi Arabia - Alkharj
  • August 2005 to October 2005

ALDOSARI Institution, KHARJ, August 2005 - October 2005
Worked in Aldosari Foundation for Telecom in Installing and maintenance for Wireless devices
• SUDAN

Trainer at SUDATIL, KHARTOUM
  • Sudan - Khartoum
  • March 2005 to May 2005

SUDATIL, KHARTOUM, March 2005 - May 2005

Education

Bachelor's degree, Electronic-Telecommunications engineering
  • at SUDAN UNIVERSITY FOR SCIENCE AND TECHNOLOGY Electronic Engineering
  • December 2005

• SUDAN UNIVERSITY FOR SCIENCE AND TECHNOLOGY Electronic Engineering (Telecommunications), January 2002- December 2005

Specialties & Skills

Languages

English
Intermediate
Arabic
Expert

Memberships

FTTH Council
  • CFHP
  • November 2012

Training and Certifications

PMP (Certificate)
Date Attended:
November 2015
Valid Until:
January 9999
CFHP (Training)
Training Institute:
FTTH Council
Date Attended:
November 2012
Duration:
40 hours
PMP (Training)
Training Institute:
Knowledge Beam
Date Attended:
August 2015
Duration:
35 hours
• Training of ODN and OLT-ONT configuration ( ISP,VoIP and IPTV) (Training)
Training Institute:
ZTE
Date Attended:
February 2014
Duration:
40 hours

Hobbies

  • Fishing
  • Travailing