nasser khattab, Water and Wastewater Consult

nasser khattab

Water and Wastewater Consult

Tetra-Tech Consult USAid Consult

Lieu
Egypte - Le Caire - Gizeh
Éducation
Doctorat, Optimization Modelling water and wastewater Treatment Plant (Under Process)
Expérience
35 years, 3 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :35 years, 3 Mois

Water and Wastewater Consult à Tetra-Tech Consult USAid Consult
  • Egypte - Le Caire
  • Je travaille ici depuis mai 2016

- Provide Technical Solutions for 5 Water and Wastewater Companies, (Menya, Asuit, Sohag, Qena and Luxor).
- Review and Reports all Problems or Faults at Water and Wastewater Equipment.
- Advise with solutions and follow up untill finish.
- Works include Design, Design Review, Manage installation, Operation and Maintenace.
- Provide Tender Specification.
- Supervise All Dismantling, Installation, Commissioning, Training and Handling Over for most Equipment.

Senior Mechanical Engineer à Engicon - Qatar
  • Qatar - Doha
  • octobre 2016 à mai 2019

- Design and Design Review for Mechanical and Hydraulic works for upgrade 7 wastewater Pumping Stations around Doha. (Project 770)
- Review all Submittal related to Pumps, Valves, Hydraulics, Cranes, Screens, Grinders, Generators, OCU, ...etc.
- Supervise all Mechanical and Hydraulic Works,

Company Technical consult à Giza Water & Wastewater Co.
  • Egypte - Le Caire
  • novembre 2014 à septembre 2016

- Review all Company T.O.R. w.r.t. Egyptian Code and make required changes.
- Required consultancy on various contractual.
- Study stakeholder's claims and solve it.
- Establish evaluation and inspection Models for all company sites.
- Supervise Networks, Tunnelling, Drinking water and Sewage Projects.

Sector Head for O & M for New Cities (October & Zaid) à Giza Water and Wastewater Co.
  • Egypte - Le Caire
  • novembre 2012 à novembre 2014

- Decentralization management for new cities (6 0ctober & Zaid Cities) include all departments that can help customer services to solve all Customers Complaints.
- Overseeing the implementation of the operation and maintenance plans, replacement, renewal and Contracts of the Networks, Tunnelling, Drinking water and Sewage Projects.
- Streets Flooding Control and NRW Detect and Control Expert.

Mechanical Engineer à Giza Water and Wastewater Company
  • Egypte - Le Caire
  • juin 2000 à octobre 2012

- Plan Yearly Operation and Maintenance for station include: pumps, Mechanical screen, control panels, Transformers, Motors, etc.
- Prepare required T.O.R. for Operation and maintenance requirement.
- Plan & supervise Yearly Preventive & Predictive maintenance for Lifting stations, treatment plants include: Pumps, Generators, and Screens.
- Prepare required training & materials for Workshop Staff.
- Plan and Supervise Yearly Required procurement include: pumps, generators, screen, Cranes and aerators, control panels, Transformers, Motors, Gear boxes...etc and Spare Parts.
- Prepare required Cost Estimation.

Mechanical Consultant Engineer à AMBRIC
  • Egypte - Le Caire
  • mars 1989 à juin 2000

- Plan & Supervise Installation of required equipment, spare parts and special tools.
- Prepare required training courses materials for many discipline.
- Provide Training for recommended staff (engineers and technicians)

Éducation

Doctorat, Optimization Modelling water and wastewater Treatment Plant (Under Process)
  • à Cairo University
  • décembre 2022
Master, M.Sc. in Water resources Engineering (Utilities Engineering) " Evaluation Performance of Wastewat
  • à Cairo University-Faculty of Engineering
  • novembre 2011

Mass balance of activated sludge treatment plants, flow rates, BOD5 and TSS are important parameters for efficient operation of wastewater treatment plants. Mass balance also monitors the performance of each component and process at all locations in the treatment plant in order to meet the acceptable treatment criteria. A large number of laboratory experiments have been carried out on a daily basis to investigate the performance of ZWWTP. In conclusion, after implementing mass balance, activated sludge treatment plants can be controlled, analyzed with different influent parameters values of flow, total suspended solids (TSS) and biochemical oxygen demand (BOD5). ZWWTP has high treatment performance through year 2008 and meet Egyptian code standards with average removal efficiency of BOD5 95% and average removal efficiency of TSS 97 %.

Baccalauréat, Mechanical Engineering
  • à Benha University
  • août 1984

Mechanical Engineering- Mechanical power Division. 5-Year Engineering - project include pumps for many utilities.

Specialties & Skills

Key Performance Indicators
Consulting
Procurement
Supervise Mechanical Works
Project Mechanical Engineer
CONSULTING
CONTRACT MANAGEMENT
ENGINEERING
GENERAL MANAGEMENT
MECHANICAL
TECHNICAL SUPPORT
Operation and Maintenance Sector Head Director

Langues

Arabe
Expert
Anglais
Expert

Adhésions

Egyptian Engineering Sydicate
  • Consult Certificate
  • August 2008
MMUP - Qatar
  • UPDA - Grade A
  • October 2017

Formation et Diplômes

Physical Modelling Witness Test (Certificat)
Date de la formation:
December 2017
Operation and Maintenance of Screw pumps (Formation)
Institut de formation:
Spaans- Babcock. BV, Netherland
Date de la formation:
August 1998
Saving and reuse of wastewater (Formation)
Institut de formation:
Saving and reuse of wastewater
Date de la formation:
May 1999
Organization Development for Utilities (Formation)
Institut de formation:
In went, German. E-Learning
Date de la formation:
June 2010
Sector Governance in Urban Sanitation (Formation)
Institut de formation:
In went, German. E-Learning
Date de la formation:
November 2010