Nasser Khraishi, Construction Manager

Nasser Khraishi

Construction Manager

Al Falak Company

Lieu
Arabie Saoudite - Province de l'Est
Éducation
Baccalauréat, Civil Engineering
Expérience
24 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 9 Mois

Construction Manager à Al Falak Company
  • Arabie Saoudite - Dammam
  • Je travaille ici depuis mai 2021

Construction Manager - KSA, Eastern Province..
Projects Accomplished:
· ARAMCO Dhahran MIDRA TOWER - EPM 8th floor
ARAMCO EPM ENTERPRISE PROJECTS MANAGEMENT CENTER
· ARAMCO Dhahran MIDRA TOWER - 4IRC 13th floor
ARAMCO FOURTH INDUSTRIAL REVOLUTION CENTER
-Overseeing the logistical requirements of a project
-Delegating work to colleagues within your team
-Meeting regularly with clients, third parties and other managers to report on progress
-Setting targets, objectives and responsibilities for all supervised staff
-Regularly reviewing timings, budget, labor, risk & project plans to ensure work stays on track
-Setting and agreeing budgets
-Conducting site visits to inspect work, check materials and ensure staff are following health and safety guidelines
-Dealing with contracts and mitigating the impact of any issues
-Ensuring the delivery of high-quality work within contract timescales
-Working in an office and on a construction site.

project Manager à Zuhair fayez
  • Arabie Saoudite - Riyad
  • juin 2020 à avril 2021

• REMAH YEARLY FESTIVAL - Camel Club 32 projects
-Certify that all submittals are in compliance with contract requirements.
-Review plans and specifications to ensure requirements are met for each construction process.
-Provide documented evaluations, assessments, and CQC assistance to staff and subcontractor personnel.
-Review all catalog cuts and material submittals for compliance with plans and specifications.
-Ensure all water, soil, materials, and mechanical systems testing are conducted by approve personnel and/or approved testing facilities.
-Distribute written inspection/test results to appropriate agencies.
-Ensure effective and timely preventive and corrective actions are taken and recurrence of problems are eliminated or minimized.
-Maintain and submit hazardous material reports to government environmental office.
-Conduct pre final inspections/ establish punch list if required/ ensure all deficiencies are corrected.
-Coordinate and conduct final inspections with government contracting and civil engineer personnel.
-Execute project closeout and deliverables. And verify all project closeout documents are delivered, coordinate with Project Managers for final payment to the owner.
-Responsible for the timeliness and accuracy of the project closeout.

Construction Project Manager à Battal Al-Subaiy Est
  • Arabie Saoudite - Province de l'Est
  • janvier 2013 à octobre 2020

Organizing, Planning, and prioritizing work - developing specific goals and plans to prioritize,
organize & accomplish work construction projects up to quality standard and budget.
-Preparation of the project management plan including scope managements plans requirement
management planning scheduling cost management process improvement, manpower resources plan,
communication plan, risk management, procurement management, stakeholder management and
quality management plan.
-Controlling the project cash flow.
-Provides professional development of staff reporting directly to Operations Support Manager,
including conduction of performance appraisal for staff merits for a job well done.
-Implementation of approved construction schedules, implementing revisions, and takes all necessary
action for the recovery schedule.
-Monitor and improve production and efficiency of work force.
-Continuous monitoring of material orders, planning, material stocks availability, housekeeping, safety
requirements, quality executions, timely billing, change orders, as built, submittals etc. to ensure
smooth and profitable operations.
-Provides weekly project report with updates and progress reports, action plans, updates
communication with the clients/consultant
-Coordinating the work activities and establish a strong working relationship with the client - sub
contractors and consultants.
-Interacts with Operations Manager, Superiors and Unit Heads in Head Office to tackle and resolve
site issues.
-Developing team building to encourage and built mutual trust and camaraderie, respect and
cooperation among team members with the entire project organization.
Projects Accomplished:
ARAMCO Fadhli Plant Buildings - Thabat - Al-Muhaideb Subcontracting.
Constructing and finishing the Offices, Building, and Mosque..
ARAMCO AJYAL 300 Villa's - AZMEEL Subcontracting.
Constructing & finishing 16 villas in zone A & B, & finishing 290 villas in Zone F ..
ROYAL COMMISSION Security Buildings -ABACON-Faisaliya Subcontracting.
Constructing and finishing the 12 Offices all around SABIC 1ST Industrial Area.
ARAMCO Hawiya Gas Plant ROADS & Camp Backfilling & Asphalting - Tamimi
Backfilling 5 million m3 of roads and the residential area, Asphalting Work for Main
roads & internal roads (150, 000 m2)..
- Simplify the Asphalt working procedure for this project:
• Performing subgrade preparation. Fill all depressions, level the surface, remove all unsuitable
materials and replace with materials approved by Saudi Aramco.
• Compact the subgrade according to the requirements in SAES-A-114 Section 6.3.1.1 and 6.3.2.5
(ARAMCO STANDARD)
• The entire subgrade was compacted to not less than 95% of the maximum dry density per ASTM D
1557 or AASHTO T180 at 1.5% of the optimum moisture content or to 85% of relative density
determined by ASTM D4253 and ASTM D4254.
• Installed approved Base course materials and compacted to not less than 95% & 100% of the
maximum laboratory dry density as determined by ASTM D1557 or ASSHTO T180
• The Asphalt concrete paving was as per the requirements in of SAES-Q-006 (Clause: 5.5.1)
ARAMCO King Abdul-Aziz Culture World Center - Saudi Oger Subcontracting.
Constructing & finishing the Main Building, External Concrete & Earth work
(Backfilling & milling) Service Raods..

Construction Manager Project Manager à Fawaz al-hokair Group
  • Arabie Saoudite - Province de l'Est
  • mars 2008 à décembre 2012

2nd Project: As a project Manager at King Fahd University of Petroleum & Mineral building The Commercial and Recreational Complex, the position includes: handling the implementation of the project, defining project tasks and resource requirements, assembling and coordinate project staff, planning and scheduling project timelines, communicating and liaising with site engineers, subcontractors, consultants, co-workers and clients, managing budgets and other project resources, checking and approving reports, reviewing and approving project drawings and as-builts drawings, issuing monthly invoices, variation orders and change orders, scheduling material and equipment purchases and delivery, running weekly meetings to discuss projects development, ensuring that a project runs smoothly and that the structure is completed on time and within budget, correcting any project deficiencies that affect production, insuring quality and safety requirements .

1st Project: Marriott courtyard Hotel "32 Stories Tower" .. Riyadh - KSA"
Review contractor submittals, review design documents and drawings and coordinate with discipline engineers, coordinate with Contract Supervisors to ensure that the required technical submittals are obtained from contractors and reviewed in a timely manner, participate in construction progress meetings, review and respond to contractors technical queries and coordinate with Engineering Department on technical issues, maintain project safety awareness and enforce company safety policy, participate in final inspection and prepare "punch lists", make field inspections on repair works and release hold points, participate in preparation of technical features of V.Os & Change Orders, supervise quantity take-offs, review contractor's monthly invoices, monitor contractor inspection and quality control programs, review invoices, and as-builts drawings.

-Section Engineer at Khursanya Gas Plant - Aramco Project à Consolidated Contractors Company (C.C.C.), KSA
  • Arabie Saoudite - Province de l'Est
  • janvier 2006 à mars 2008

- Section Engineer at Khursanya Gas Plant - 4.5 Billion $ ARAMCO Project.
- Duties: Section head for "Under Ground: Civil-Mechanical"; which include:
32 Oily & Sanitary Sump Pits (Three stories)
1300 Manholes (OWS, SRC, ANP, SMH)
4500 Catch Basin "4 types"
250'000 L.m RTR U/G Pipes
320 Duct Banks " Electrical, Instrument"
200 Valve Pits " DW, FW, OW"
1200 Thrust Blocks on fire water lines
4000 RTR Vent supports
2000 lighting pool, & pull pits
6000 guard rails

Construction Manager à Abdulla A. Dossary Trading Ent. trading & contracting
  • Arabie Saoudite - Province de l'Est
  • décembre 2000 à janvier 2006

-construction manager, 2nd Jubail Industrial"Bridge T-218": Bridges, Piling works, Girders, Underpasses, Culverts & Tunnels, Retaining walls, Drainage pipes, Duct-Banks "Power &Telecom", Water Channel, Dewatering, Roads & Asphalting works, Quantity Surveying .
- Strength: Drawing Analysis, Material Quantity Survey, Bar Bending Schedules

Design and Consultant Engineering Office à Al-Ajiad contracting co.
  • Jordanie
  • août 1999 à décembre 2000

· Design and Consultant Engineering Office.
· 6 Stories Building in "AMMAN- ALABDALI"

Éducation

Baccalauréat, Civil Engineering
  • à Applied Science University
  • février 2000
Etudes secondaires ou équivalent, Scientific Stream
  • à Abqaiq Secondary School, Abqaiq - K.S.A
  • juillet 1993

Specialties & Skills

Construction Project Management
Construction Management
Bridge Construction
Construction
Experienced in STAAD III, AutoCAD1998, Simulation programs, Primavera
word, excel, power point, office 2000, Access, Outlook Express, flash, front page

Langues

Arabe
Expert
Anglais
Expert