Planning Engineer
Shine Company org
Total years of experience :18 years, 9 Months
• Prepare & Issue planning package as per contractual terms & conditions and receiving approval from the Client within the stipulated period of the contract.
• Initiate, prepare & develop project plans & schedules according to standards, contract specifications and accepted Project Management practices.
• Coordinate with the Project Manager, Site Manager, Site Engineers, Job Estimators, Engineers of various disciplines etc to acquire proper data and specifications for the schedule.
• Analyze drawings, specifications & method statements of works for the preparation of activity networks / scheduling / resources planning and allocation.
• Develop major milestone activities & establish a well-defined Work Breakdown Structure, which includes all the scopes of work.
• Establish the Schedule based on key dates, mile stone dates, scope of works, resource loading etc, as specified in the contract.
• Assign duration, resources (Manpower, Materials and Equipments) and Budgeted Cost for each activity based on their weight factor & quantity/volume of work. And identify Long Lead items required in the Project.
• Generate detailed work plan, critical activities/path, planned/progress S-Curves, Budget Histogram/planned distribution tables, Resource Histogram/planned distribution tables etc.
• Coordinate schedule from multiple sub-contractors / vendors and incorporate the information gathered into the overall project master schedule.
• Develop databases for Engineering deliverables, Procurement deliverables and Construction activities for monitoring/analyzing/tracking progresses.
• Review, analyze & refine sequence and logic of tasks/activities and highlight any critical activity needs particular attention.
• Track, monitor and forecast progress of all activities and deliverables such as products, engineering documents, fabrication status and construction of all discipline.
• Conduct BID clarification meeting, Project explanation meeting with Subcontractors.
• Review Subcontractor’s quotation for execution stage in line with our Budget, Planned resource and profitability.
• Follow-up with Subcontractor/ site team to monitor project progress and make reports.
• Monitoring, updating & analysis of progress right from the field.
• Collate data & other pertinent information of project progress and update schedule.
• Evaluate dates to completion and project delay, if any, periodically by updating actual progress data.
• Prepare reports & charts, i.e., daily/weekly and/or monthly reports as required by management and/or client.
• Support project management in accomplishing project status review and performance control.
• Attend project progress status review meetings with client, vendors and sub-contractors.
• Prepare reports about activities to be prioritized (critical activities) for Site Supervisors/Engineers.
• Record and assess the effects of project schedule changes.
• Assess actual progress versus planned progress to determine trends and variances.
• Analyze schedule trends, determining risks, developing options for corrective action and alter schedules to meet unforeseen conditions.
• Prepare Cash Flow charts/tables and Financial Models.
• Estimate & forecast quantity of works and costs/amount of works.
• Prepare progress invoices/bills to client.
• Review & verify the progress invoices/bills of sub-contractors and vendors.
• Create new unit price for material which is not include in contracts.
• Develop Action and Recovery plans to support project completion on time.
• Revise the project plans & schedules (re-planning and re-base lining) for variation orders/change orders/additional scope of works and Extensions of Time.
• Prepare various schedules such as schedules for pre-commissioning / commissioning / performance tests etc.
• Support / take in-charge of Civil Site Engineer whenever he goes for vacation.
• 3d Modeling for Underground Piping, RCC & Steel Structure, Equipment’s etc...
• Creating & Checking the RCC & Steel Structures and Piping Isometric drawings.
• Estimate the Material Quantities for Piping, RCC Structures etc.
• Review basic Aramco Standards and responsible to implement in Design Engineering.
• Site Coordination for Installation and Fabrications UG Piping and RCC Structures with team to
reduce re-fabrication works.
• Coordinate with other related department & construction team to update progress.
• Sharing my Experience & Skills to the team for leading the project and targets. ACHIEVEMENTS
• Appreciation Certificate from Saudi Aramco.
• Safety Performance Certificate from Hitachi.
1. Responsible for 3d Modeling, Detailed drawings & Estimate the quantity as per project schedules with quality and accuracy.
2. Prepared Underground drawings for Plants like Cable trenches, Soak pit, Retaining wall, Water sumps, Machinery foundations, etc..
3. Prepared Steel Structural drawings & QS for Cold box structures, Pipe Racks, Machinery, Access platforms, Staircase, Ladders etc. for ASU plants (Air Separation units).
4. Provided technical expertise and guidance in preparation efficient datasets, layouts, work statements, drawings and delivery schedules
• Detail Drawings for various structures like Commercial Buildings, Industrial buildings etc.
• Estimate the material quantities for structures and Foundations
• Created Detail Drawings for Commercial Buildings, Residential Apartments, Foot Over bridges etc.
based on information provided by customers, Supervisors and engineers.
Diploma in Civil Engineering