Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
nayer hany alphons, Construction Manager

nayer hany alphons

Construction Manager·EL sewedy Electric T&D

Egypt

Bachelor's degree, electrical engineer

Work experience

Total years of experience: 15 years, 5 months

Construction Manager

November 2014 - Present

EL sewedy Electric T&D

Cairo, Egypt

November 2014 - Present

Cameroon project medium (33 kv) and low voltage transmission line 500 km

Project budget: 6 million EUROS
Owner :- EDC

Company industry:
General Engineering Consultancy
Job role:
Engineering

construction manager

March 2014 - Present

HIDEL ENERGYA (a group between Hidelco and energya-pts)

Agadir, Morocco

March 2014 - Present

Morocco Project: - construction de la ligne 400 KV Chichaoua - Timlilt lot 1 et 2 (160 km ) ongoing Project
Owner OFFICE NATIONAL DE L'ELECTRICITE (« ONE »)
Project budget: - 50 million dollar USD
 Planning for project
 Budget control for the project
 Procurement for the project
 Manage the project (site management )
 Site supervision

Company industry:
Construction & Building
Job role:
Engineering

construction manager

August 2013 - March 2014

ENERGYA FOR POWER AND TELECOM SOLUTION ELSWEEDY HELAL

Zambia

August 2013 - March 2014

ZAMBIA PROJECT 33 KV
Owner: - CEC copper belt
Project budget: - 5.5million dollar USD
Job description
 Planning for project
 Budget control for the project
 Procurement for the project
 Design for the project
 Manage the project (site management )
 This project has been executed with a saving one and half million dollar and finished in six months in spite of eight months

Company industry:
Construction & Building
Job role:
Engineering

Senior TECHNICAL SUPPORT

August 2012 - August 2013

ENERGYA FOR POWER AND TELECOM SOLUTION ELSWEEDY HELAL

Cairo, Egypt

August 2012 - August 2013

 procurement engineer
Job description
1- OWAYNAT project area 3 and 13
2- Purchase Conductor, underground cable, poles, switchgear panel and fitting for OWAYNAT project area 3 and 13, HYKESTEB project, Zambia project ZESCO, Zambia project copper belt and Morocco project
 the purchasing process for all the above mention project respecting prices the delivery time and the cash flow
 DESIGN AND TECHNICAL SUPPORT
Job description
- Design with sag10 for over head transmission line
(Zambia project 33 KV, Tunis project 66Kv and OWAYNAT project 24 KV, Tanzania project medium and low voltage)
- Design with sag10 for ADSS project under the 66kv electric line, and a study for electric field based on it we determine the required specification for the cable
- Supervise the profile line, sine optical, electric field and layout for the tender and operation project .
- Inspection for materials
 Bidding (presales )engineer
Job description
- I was part from a team who succeed in the bidding phase :-
Owaynat project Egypt area 3 and 13 , Mozambique project medium voltage and distribution line, Giza north 500 KVA , Owaynat project Egypt area 7 and 15 medium voltage , Hykesteb project medium voltage and Tanzania project medium voltage and distribution line
- Preparing a full break down sheet with a cost sheet, P&L sheet and cash flow for the entire project in tender phase.
- Preparing a full report in the project before starting the study: - expected budget, supplier list, technical and commercial comment and handle a link with the subcontractor and client.
- site survey and pre bid meeting representative

Company industry:
Electric Power Production & Transmission
Job role:
Engineering

electrical director engineer

January 2012 - August 2012

energya for power and telecom solution

Luxor, Egypt

January 2012 - August 2012

Project: - medium voltage underground cable and over head transmission line 24 KV
East owaynat project area 5 in military site
Supervised by EPS owner: - MEDECO
Project budget: - 35 million Egyptian pound
Job description
 Supervise for the installation process
 Responsible for the time and cost planning of the electrical activities, negotiation with contractors of the electrical activities, daily equipment plan, the electrical daily reports, design and installation for the VIP building and substation (low voltage distribution), material inspection and test and commissioning of lines before connect with the main substation
 Work in place of site manager in his vacation, arrange the technician and labors s’ vacation
 Work as a maintenance engineer for the project area 21 and 10 east (work under volt).
Award for best employee in operation department in August 2012 for year 2012, From ENERGYA for power and telecom Solution Company

Company industry:
Construction & Building
Job role:
Engineering

Site engineer

June 2011 - January 2012

ENERGYA FOR POWER AND TELECOM SOLUTION EL SWEEDY HELAL

Luxor, Egypt

June 2011 - January 2012

Project: - medium voltage underground cable and over head transmission line 24 KV
East owaynat project area 21 and 10 east in military site
Supervised by EPS owner: - MEDECO
Project budget: - 120 million Egyptian pound
Job description
 Responsible for the installation of :- underground medium voltage cable 3*240 mm2, underground low voltage cable 3*240 +120 mm2, over head transmission line 300 and 150 mm2 AAAC, finishing of medium voltage switchgear 300 and 500 KVA, capacitor bank, breaker switch and surge arrestor, earthing system, medium voltage switchgear panel and termination in low and medium voltage

Company industry:
Construction & Building
Job role:
Engineering

electrical engineer

February 2011 - June 2011

el gamal group

Cairo, Egypt

February 2011 - June 2011

- Work in automation system for bag filter of cement factory with zelio software (ladder) and logo Siemens (block diagram).
- Field engineer as a supervisor for the bag filter instrument‘s implementation.
- Design and quotation engineer.

Company industry:
General Engineering Consultancy
Job role:
Engineering

Education

faculty of engineering ain shams university

June 2010

June 2010

Bachelor's degree, electrical engineer

Egypt

Skills

Installation
Expert
Installation
Expert
Low Voltage
Expert
Low Voltage
Expert
Military
Expert
Military
Expert
French
Expert
French
Expert
Materials
Expert
Materials
Expert
Installation
Expert
Installation
Expert
Low Voltage
Expert
Low Voltage
Expert
Military
Expert
Military
Expert
French
Expert
French
Expert
Materials
Expert
Materials
Expert

Languages

Arabic

Expert

English

Intermediate

French

Intermediate